AZ Fire Sprinkler flashcards
AZ Fire Sprinkler · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Hazen-Williams Formula
- p = 4.52 Q^1.85 / (C^1.85 d^4.87). It calculates friction loss in psi per foot of pipe, where Q is flow in gpm, d is internal diameter in inches, and C is the roughness coefficient.
- Sprinkler Discharge Formula
- Q = K times the square root of P, where Q is flow in gpm, K is the discharge coefficient, and P is flowing pressure in psi. A K-5.6 head flowing 15 psi discharges about 21.7 gpm.
- Design Density
- The minimum flow in gpm per square foot applied over the remote area. It is selected from the density-area curve based on the occupancy hazard classification and the assumed fire duration.
- Remote Area
- The hydraulically most demanding area of sprinkler operation used in calculations. Its size increases for dry systems, sloped ceilings, and high-temperature sprinklers under NFPA 13.
- Elevation Pressure Loss
- A column of water 1 foot high exerts 0.433 psi. Add this loss for each foot of rise and subtract it for each foot of drop in the hydraulic calculation.
- Balancing Junction Flows
- When two branch lines meet at a junction, flows divide in proportion to the square root of the available pressure drops. Iterate the calculation until the junction pressure converges.
- Sprinkler Spacing Limits
- Standard spray heads are spaced at most 15 ft on branch lines and 15 ft between lines for light and ordinary hazard. Extra hazard limits spacing to 12 ft.
- Maximum Sprinkler Coverage
- The largest floor area one sprinkler may protect: 225 square feet for light hazard, 130 for ordinary hazard, and 100 for extra hazard. Extended-coverage heads use listed values up to 400 square feet.
- Sprinkler Distance to Wall
- The maximum distance from a sprinkler to a wall or partition is one-half the allowable spacing between sprinklers. For light hazard, that maximum is 7 feet 6 inches.
- Sprinkler Deflector Position
- Standard spray sprinklers must be positioned 1 to 12 inches below the ceiling. Residential and extended-coverage heads are typically 1 to 6 inches below the ceiling unless listed otherwise.
- Obstruction Rule
- A sprinkler is required where an obstruction is more than 4 feet wide, within 12 inches of the ceiling, and the sprinkler is more than three times the obstruction depth away.
- Pipe Schedule Sizing
- For light hazard steel pipe, 1 inch serves 2 heads, 1.5 inch serves 5, 2 inch serves 10, 2.5 inch serves 20, 3 inch serves 40, 4 inch serves 100, and 6 inch serves 275.
- Hanger Spacing
- Steel pipe hanger spacing depends on diameter: 1 inch at 12 feet, 1.5 inch at 15 feet, 2 inch at 10 feet, 3 inch at 12 feet, 4 inch at 15 feet, and 6 inch at 15 feet.
- Water Supply Flow Test
- A test records static pressure, residual pressure, and flow in gpm. The results are plotted on log-log paper to extrapolate the available supply at the system demand.
- Available Supply Calculation
- Available pressure equals static pressure minus friction losses through the meter, service main, backflow preventer, and riser, minus elevation loss, minus the safety margin.
- RPZ Backflow Assembly
- A reduced pressure zone assembly protects against both backpressure and backsiphonage in high-hazard connections. It must be tested annually by a certified tester and reported to the water authority.
- Double Check Valve Assembly
- A low-hazard backflow preventer with two check valves. It protects against backpressure and backsiphonage but is not approved for high-hazard or toxic connections.
- Fire Department Connection
- An FDC allows the responding engine to supplement the system supply. It must be located within 100 feet of a hydrant and be accessible to fire apparatus.
- Arizona ROC License
- The Arizona Registrar of Contractors issues specialty licenses such as C-16 for fire sprinkler work. A qualifying party must pass the trade exam and be actively engaged in the business.
- Arizona Contractor Bond
- Arizona requires a $5,000 surety bond for residential contractors and a $10,000 bond for commercial contractors, plus general liability insurance of at least $100,000 per occurrence.
- Arizona Mechanics Lien
- A lien must be recorded within 120 days after completion of the work. A preliminary 20-day notice must be served before the lien is recorded.
- Arizona Prompt Payment
- Arizona statutes require progress payments within 7 days of billing and final payment within 7 days of completion, unless the contract specifies a different period.
- Plan Submittal Package
- Working plans, hydraulic calculations, an isometric riser diagram, the water supply flow test, manufacturer data sheets, and the contractor license are submitted to the AHJ for review.
- Hydrostatic Test
- The system is tested at 200 psi for 2 hours, or at 50 psi above working pressure for 2 hours when working pressure exceeds 150 psi, before ceiling closure.
- Underground Flushing
- Underground mains are flushed at a flow rate equal to or greater than the system demand before connection to the riser, to remove debris that could clog sprinkler heads.
- Inspection Sequence
- Underground piping is inspected before backfill, rough-in before ceiling closure, the hydrostatic test after installation, and the final inspection with the system in service.
- Impairment Procedure
- When a system is taken out of service, a red tag is placed on the riser, the fire department and insurer are notified, and a fire watch is posted for impairments over 4 hours.
- Confined Space Entry
- Entry requires atmospheric testing with oxygen between 19.5 and 23.5 percent, flammables below 10 percent of the LEL, a rescue plan, and a trained attendant.
- Hot Work Permit
- A written permit is required for cutting, welding, or grinding. A fire watch is maintained during the work and for 30 minutes after it ends.
- Excavation Protection
- Trenches 5 feet or deeper require a protective system such as sloping, shoring, or shielding. A competent person inspects the excavation daily before entry.
- Bid Components
- A bid includes material, labor, equipment, subcontractors, permits, bonds, insurance, overhead of about 10 to 15 percent, and profit of about 5 to 10 percent.
- Change Order
- A written document signed by the owner or general contractor before extra work proceeds. It states the price and time impact of the change to the contract.