Boundary Surveying

  • Boundary evidence hierarchy: natural monuments, artificial monuments, courses and distances, then area or quantity; a call to a monument generally controls over a conflicting distance.

  • Original survey corners are held as fixed under the federal rectangular system; a later resurvey cannot move an original corner, only restore or perpetuate it.

  • Monument of record vs. physical monument: if the physical monument does not match the record description or position, the surveyor must evaluate whether it is the original, a re-established, or an errant monument.

  • Proportionate measurement applies to lost corners of the PLSS between existing corners; it does not apply to corners that can be located by other acceptable evidence.

  • Single proportionate distance formula: (record distance to corner / record total distance) x measured total distance = measured distance to the lost corner position.

  • For a lost interior section corner, use double proportionate measurement: proportion in latitude and departures between controlling corners north-south and east-west.

  • Adverse possession, boundary by agreement, estoppel, and practical location are legal doctrines the surveyor must recognize and report, but the surveyor does not decide title.

  • Possession lines, occupation lines, fence lines, and improvements are evidence to be located and compared with record lines, not automatically the boundary.

  • Water boundaries: ordinary high water mark for meanderable streams and lakes; accretion belongs to the riparian owner, while avulsion leaves the boundary where it was.

Quick reference

Legal Principles and Land Descriptions

  • A valid description must be sufficient to identify the parcel: a competent surveyor must be able to locate it on the ground without recourse to parol evidence beyond the document.

  • Order of construction for conflicting calls: natural monuments, artificial monuments, adjoining boundaries and lines, courses and distances, then area.

  • Metes and bounds descriptions should close; the record closure error is reported as a ratio (e.g., 1:5,000) and does not itself alter the record bearings and distances.

  • An aliquot part description (e.g., the NE 1/4 of the SE 1/4) depends on the PLSS subdivision; check the official plat for acreage and any lot or exceptional subdivision.

  • Words of conveyance and exceptions must be read together; a call to a named adjoining owner's line is a monument call when the line is established.

  • A description that is ambiguous may be clarified by a subsequent survey only as evidence of intent; the surveyor should note the ambiguity rather than silently choose a location.

  • Senior and junior rights: the earlier (senior) conveyance generally holds where a later (junior) conveyance overlaps, absent contrary intent or other controlling facts.

  • Record title, tax description, and assessed description can differ; a survey must be based on the deed of record and note any discrepancies with tax or plat descriptions.

Quick reference

Measurement and Positioning (Field Procedures and Computations)

  • Traverse closure: linear error of closure = sqrt((sum of departures)^2 + (sum of latitudes)^2); relative precision = total traverse length / linear error of closure.

  • Latitude = distance x cos(bearing angle); departure = distance x sin(bearing angle); bearings are measured from north or south, so signs follow quadrant.

  • Compass rule (Bowditch) adjusts latitudes and departures proportionally to the total traverse length; transit rule adjusts proportionally to the magnitude of the latitudes and departures.

  • Coordinate geometry: inverse between two points gives distance = sqrt(delta N^2 + delta E^2) and azimuth = atan2(delta E, delta N) normalized to 0-360 degrees.

  • Curve formulas: tangent T = R tan(I/2); length L = R x I (radians); long chord = 2R sin(I/2); middle ordinate M = R(1 - cos(I/2)).

  • Area by coordinates (shoelace): 2A = sum of (N_i x E_(i+1) - N_(i+1) x E_i) around the closed figure; take the absolute value and divide by 2.

  • GNSS: RTK and network RTK provide centimeter-level positions when fixed; a single-baseline or network solution requires adequate satellite geometry, low PDOP, and a valid coordinate/geoid model.

  • Total station accuracy depends on instrument angle and EDM accuracy plus setup and target errors; prism constants and atmospheric corrections must be set correctly.

  • Leveling loop misclosure is distributed proportionally to the distance or number of setups between benchmarks.

Quick reference

Arizona Statutes, Rules, and Standards of Practice

  • Arizona survey practice is regulated by the State Board of Technical Registration, which licenses land surveyors and enforces the statutes and rules.

  • Arizona land surveyors must be licensed; practicing or offering to practice land surveying without registration is prohibited and subject to disciplinary action.

  • The Arizona Boundary Survey Minimum Standards establish required content for boundary surveys, including monumentation, research, field evidence, and a record of survey when required.

  • A record of survey is required when a survey establishes or re-establishes a boundary, discovers evidence conflicting with the record, or creates new corners not shown on a recorded plat, as specified in the standards.

  • Records of survey, plats, and corner records must be filed with the county recorder and, where applicable, the county surveyor within the time limits set by statute and standards.

  • Arizona is a PLSS state; original government corners are protected, and remonumentation is administered through county remonumentation programs under state statute.

  • Continuing professional competency and adherence to the standards of practice, including proper monument types, caps, and survey records, are enforceable obligations.

  • Seals and signatures: the licensed surveyor must sign and seal survey documents; the seal certifies responsibility for the work and must not be applied to work not performed or supervised.