AZ Well Driller study materials
AZ Well Driller study resources

AZ Well Driller study plan

AZ Well Driller · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Well Drilling Statutes, Rules, and Permitting Requirements & Notices of Intention to Drill, Driller's Logs, and Well Reporting

  • Map the Arizona well-drilling statutory framework by listing the key statutes and rules that govern licensing, permitting, and drilling authority, and annotate each with its practical effect on a driller

  • Outline the permitting sequence from license application through drilling authorization, identifying who files what, in what order, and with which agency

  • Build a personal glossary of statutory and rule-defined terms that carry a specific legal meaning, writing a one-sentence plain-language definition for each

  • Draft a checklist of the information a driller must gather before filing a notice of intention to drill

Your checkpoint

A one-page permitting sequence flowchart with every step labeled by responsible party and governing authority

Week 2

Well Drilling Statutes, Rules, and Permitting Requirements & Notices of Intention to Drill, Driller's Logs, and Well Reporting

  • Explain the notice of intention to drill requirements in writing, covering required content, filing method, timing, and what happens after filing

  • Differentiate the notice of intention to drill from the well report and driller's log so you can state the purpose and timing of each without notes

  • Practice applying notice requirements to three hypothetical scenarios (new well, replacement well, well in a restricted area) and write the correct filing response for each

  • Identify common notice deficiencies that delay approval and write a prevention tip for each

Your checkpoint

Three completed practice scenarios with written notice filings and a self-scored answer key

Week 3

Notices of Intention to Drill, Driller's Logs, and Well Reporting & Well Drilling Statutes, Rules, and Permitting Requirements

  • Describe the required contents and format of the driller's log, including the stratigraphic and construction details that must be recorded

  • Sequence the reporting obligations that follow well completion, including deadlines and the parties who receive records

  • Construct a sample driller's log from a supplied set of drilling observations, then critique it against the reporting requirements

  • List recordkeeping retention obligations and explain why each record matters in a later compliance or transfer situation

Your checkpoint

One fully completed sample driller's log plus a written self-critique identifying at least five corrections

Week 4

Well Construction, Capping, and Abandonment Standards & Well Drilling Statutes, Rules, and Permitting Requirements

  • Explain well construction standards for casing, grouting, sealing, and surface completion, and state the purpose each standard serves

  • Match construction requirements to well type and intended use, noting where standards diverge

  • Identify the capping and temporary closure requirements that apply to wells not in active service

  • Analyze three construction defect scenarios and write the corrective action required for each

Your checkpoint

A construction-standards comparison table by well type plus written corrective actions for three defect scenarios

Week 5

Well Construction, Capping, and Abandonment Standards & Groundwater, Active Management Areas, and Water Supply Programs

  • Explain the abandonment process end to end, including when abandonment is required, who may perform it, and what documentation closes the file

  • Describe abandonment methods for different well conditions and justify the method choice in writing

  • Connect well construction and abandonment practices to groundwater protection outcomes, explaining the physical pathway by which a poorly sealed well contaminates an aquifer

  • Compare abandonment requirements with capping requirements and articulate the distinction precisely

Your checkpoint

A written abandonment plan for a hypothetical well, including method selection rationale and the closing documentation package

Week 6

Groundwater, Active Management Areas, and Water Supply Programs & Well Drilling Statutes, Rules, and Permitting Requirements

  • Explain the purpose and mechanics of Active Management Areas, including the regulatory consequences that attach to drilling inside versus outside an AMA

  • Describe the groundwater and water supply programs that affect well approval, and identify which program applies to a given proposed well

  • Trace how a proposed well moves through AMA-related review, noting the points where a driller's submittal can stall the process

  • Summarize the statutory basis for groundwater management in enough detail to answer applied questions without reference

Your checkpoint

A one-page AMA decision guide that routes a proposed well to the correct program and review path

Week 7

Well Drilling Statutes, Rules, and Permitting Requirements & Notices of Intention to Drill, Driller's Logs, and Well Reporting & Well Construction, Capping, and Abandonment Standards & Groundwater, Active Management Areas, and Water Supply Programs

  • Assemble a consolidated one-page reference sheet of deadlines, filing requirements, and construction thresholds drawn from all four domains

  • Complete a timed 60-question mixed practice set and categorize every miss by domain and by failure type (knowledge gap, misreading, or recall)

  • Re-study only the two weakest subareas identified by the practice set and write a short summary of each in your own words

  • Rehearse explaining the notice, log, and abandonment requirements aloud in under two minutes each

Your checkpoint

A scored practice set with a written error analysis and a completed consolidated reference sheet

Week 8

Well Drilling Statutes, Rules, and Permitting Requirements & Notices of Intention to Drill, Driller's Logs, and Well Reporting & Well Construction, Capping, and Abandonment Standards & Groundwater, Active Management Areas, and Water Supply Programs

  • Complete two full-length timed practice exams under test conditions and record scores by domain

  • Review every missed item from both exams and write the correct rule or standard beside each one

  • Drill the consolidated reference sheet until you can reproduce the key deadlines and thresholds from memory

  • Confirm logistical readiness for exam day, including identification, scheduling, and permitted materials

Your checkpoint

Two scored full-length practice exams with a final error log showing every domain at or above 80 percent

Milestones

Week 2: Can state the notice of intention to drill requirements and filing sequence from memory with no notes

Week 4: Scores at least 75 percent on a self-made 30-question set covering domains 1, 2, and 3

Week 6: Can route a hypothetical proposed well to the correct AMA or water supply program and justify the routing in writing

Week 8: Scores at least 80 percent in every domain on the final full-length practice exam