Azure AZ-120 study materials
Azure AZ-120 study resources

Azure AZ-120 study plan

Azure AZ-120 · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Migrate SAP workloads to Azure

  • Map each on-premises SAP component (ASCS, ERS, PAS/AAS, database, SAProuter) to its target Azure resource type and justify the choice in writing.

  • Compare SAP-certified Azure VM families for the target database and application tiers, and record the sizing rationale for each tier.

  • Identify which SAP notes, certification lists, and support prerequisites must be verified before any migration begins, and build a checklist.

  • Draft a migration cutover timeline that sequences database export, data transfer, and application bring-up with owner names.

Your checkpoint

A one-page migration inventory table listing every SAP component, its target Azure resource, and the evidence source used to justify it.

Week 2

Migrate SAP workloads to Azure

  • Size Azure disks and throughput for the database tier using SAP storage KPIs, and document the calculation for data, log, and backup volumes.

  • Design the network topology for the migration, including hub-spoke peering, subnets, and required egress paths.

  • Select a data transfer method for the database volume and justify it against the available bandwidth and downtime window.

  • Write the rollback procedure for a failed cutover, including decision points and validation checks.

Your checkpoint

A storage and network design document with calculated IOPS/throughput per disk and a named transfer method with justification.

Week 3

Migrate SAP workloads to Azure & Design and implement an infrastructure to support SAP workloads on Azure

  • Build a landing zone checklist covering subscription design, resource groups, tagging, and policy assignments for SAP workloads.

  • Configure Azure Monitor and the SAP solution extension so that SAP application and database metrics land in one workspace.

  • Deploy a non-production SAP system end to end in a lab subscription to validate the design assumptions from weeks 1 and 2.

  • Document every deviation between the planned design and what actually deployed, with the reason for each.

Your checkpoint

A working non-production SAP deployment with screenshots of the monitoring workspace showing collected SAP metrics.

Week 4

Design and implement an infrastructure to support SAP workloads on Azure

  • Design the identity and access model, including managed identities, role assignments, and separation of duties for SAP administrators.

  • Define the backup and restore configuration for the database and file shares, and state the recovery point objective each setting supports.

  • Implement Azure Backup or a native database backup strategy in the lab and verify a restore completes.

  • Produce a cost estimate broken down by compute, storage, network, and licensing for the target architecture.

Your checkpoint

A restore test report proving a database backup was recovered to a new host, with measured recovery time.

Week 5

Design and implement high availability and disaster recovery (HA/DR)

  • Design the high availability topology for ASCS/ERS and the database, naming the clustering technology and the Azure infrastructure features each depends on.

  • Explain how Azure load balancers, proximity placement groups, and availability zones interact in the chosen HA design, and note the constraints of each.

  • Provision the HA cluster in the lab and demonstrate a failover of the central services instance.

  • Write the failure scenario matrix mapping each single point of failure to its detection method and automated response.

Your checkpoint

A failover demonstration log recording the trigger, detection time, and recovery time for the ASCS/ERS failover.

Week 6

Design and implement high availability and disaster recovery (HA/DR)

  • Design the disaster recovery strategy, choosing the replication mechanism for the database and the region pairing for the target.

  • Set recovery time and recovery point objectives per tier and show how each design decision meets them.

  • Document the DR runbook with ordered steps, validation gates, and the authority to declare a disaster.

  • Test a partial DR exercise, such as a database replica promotion in an isolated network, and record the outcome.

Your checkpoint

A DR runbook plus a test record showing the measured time to bring up a database replica in the secondary region.

Week 7

Maintain SAP workloads on Azure

  • Define the patching and maintenance cadence for the OS, database, and SAP kernel, including how Azure maintenance windows are coordinated with SAP downtime.

  • Build a monitoring and alerting baseline that covers host health, SAP application availability, and backup success.

  • Automate one recurring operational task, such as start/stop scheduling or disk expansion, and document the runbook.

  • Draft an incident response procedure for a production outage that names escalation contacts and diagnostic data to collect.

Your checkpoint

A monitoring dashboard definition and alert rule set exported as code, with a list of the alerts and their thresholds.

Week 8

Migrate SAP workloads to Azure & Design and implement an infrastructure to support SAP workloads on Azure & Design and implement high availability and disaster recovery (HA/DR) & Maintain SAP workloads on Azure

  • Complete a timed practice assessment across all four domains and record the score per domain.

  • Review every missed objective and write a corrective summary tying it back to the relevant design decision.

  • Re-verify the weakest two domains by rebuilding the affected configuration in the lab without referring to notes.

  • Consolidate the eight weeks of deliverables into a single architecture and operations portfolio for reference.

Your checkpoint

A scored practice assessment with a per-domain breakdown and a written remediation list for every missed objective.

Milestones

Week 2: Migration inventory and storage/network design are complete, with no unresolved dependency on an unverified SAP note or certification.

Week 4: A non-production SAP system is deployed, monitored, backed up, and successfully restored, and the cost estimate is within the approved budget range.

Week 6: Both an HA failover and a DR replica promotion have been demonstrated and timed against the stated recovery objectives.

Week 8: Practice assessment score is at or above the target pass margin in every domain, with no domain below the threshold.