- Business continuity management system
- The documented set of policies, processes, and responsibilities an organization uses to plan, operate, review, and continually improve its continuity capability across the full lifecycle.
- Program charter
- A formal document that establishes the continuity program, names its executive sponsor and manager, defines scope, and grants authority to activate plans and commit resources.
- Steering committee role
- A cross-functional body that oversees the continuity program, resolves competing priorities, approves strategies and budgets, and reviews exercise results and residual risk.
- Continuity policy statement
- A top-level commitment defining the program's objectives, mandatory requirements, scope, and staff accountability, reviewed annually or after significant organizational change.
- Risk score calculation
- Likelihood multiplied by impact, often on a five-by-five matrix producing scores from one to twenty-five, with defined thresholds that trigger treatment or escalation.
- Risk treatment options
- The four standard responses to identified risk: avoid the activity, reduce likelihood or impact, transfer through insurance or contract, or formally accept the residual risk.
- Recovery time objective
- The maximum acceptable elapsed time to restore a product, service, or activity after disruption, which must be shorter than or equal to the maximum tolerable downtime.
- Recovery point objective
- The maximum tolerable amount of data loss measured in time before a disruption, which determines backup frequency and replication design for each critical system.
- Maximum tolerable downtime
- The point in time at which the impact of not performing a critical activity becomes unacceptable to the organization, its customers, or its regulators.
- Dependency mapping
- Documenting the applications, data, people, facilities, utilities, and third parties each critical activity relies on, to expose single points of failure and constrain recovery design.
- BIA impact categories
- Standard lenses for assessing disruption harm over time: financial, regulatory and legal, operational, reputational, safety, and contractual, each rated across defined horizons.
- Recovery priority ranking
- Ordering activities by earliest recovery time objective combined with highest impact and dependency depth, rather than by organizational seniority or budget size.
- Alternate site distance rule
- The alternate site must sit outside the credible impact radius of the most likely regional hazard, such as flood plain, wildfire zone, hurricane track, or grid outage.
- Synchronous replication tradeoff
- Data is written to both sites before acknowledgment, giving near-zero recovery point objective but requiring low latency and higher write cost.
- Warm site characteristics
- A partially equipped alternate facility with power, network, and some hardware but no live data, requiring hours to days plus restoration effort to reach service.
- Recovery time composition
- Achievable recovery time equals site or service activation time plus data restoration time plus application start-up and verification time; ignoring any component misses the objective.
- Manual workaround validity
- A viable strategy for short recovery objectives only when forms, authority limits, supplies, and trained staff are pre-positioned and exercised before the disruption occurs.
- Single point of failure
- Any component whose failure alone halts a critical activity, such as one power feed, one carrier, one identity provider, or one key person without backup.
- Incident command roles
- A structured response organization with an incident commander and operations, planning, logistics, finance and administration, and liaison functions, each with a designated alternate.
- Life safety precedence
- The rule that evacuation, shelter-in-place, personnel accounting, and medical response always outrank asset protection and business recovery during an emergency.
- Single-voice communication
- A crisis communication principle designating one trained spokesperson and pre-approved holding statements, with a fixed update cadence, to prevent conflicting public messages.
- Activation criteria
- Objective, pre-agreed thresholds such as facility unavailability beyond a set duration or any serious injury, that trigger plan invocation and escalation without debate.
- Notification cascade test
- A drill measuring how quickly and completely critical staff are reached, typically targeting all contacts within thirty minutes using at least two independent channels.
- Plan hierarchy
- The layered set of documents from policy through enterprise continuity plan, business unit plans, IT disaster recovery, communications, emergency response, and supplier plans.
- Plan minimum contents
- Purpose, scope, assumptions, roles, activation authority, procedures, dependencies, contact lists, and version control, assembled so responders can act under stress.
- Document control requirements
- Unique identifiers, version numbers, approval signatures, distribution lists, and a defined review cycle, ensuring responders never use superseded procedures during an incident.
- Offline plan availability
- Maintaining printed or locally stored copies of plans and contact lists because the intranet, email, or primary repository may be unavailable during the very outage.
- Exercise type progression
- Increasing complexity from plan walkthrough and tabletop, through component tests and functional exercises, to full-scale simulation, each validating different objectives.
- After-action report
- A post-exercise document recording objectives, timeline, observations, root causes, and corrective actions with named owners and due dates, issued within a set window.
- No-fault exercise ground rule
- A stated rule that exercise findings are not used for discipline, which encourages honest reporting of failures and produces more useful corrective actions.
- Corrective action register
- A tracked list of findings from exercises, incidents, and audits, each with owner, due date, status, and verification of effectiveness, reviewed until formally closed.
- Change-triggered plan review
- A rule that any project altering critical applications, sites, suppliers, or organization structure requires a continuity impact check and plan update before go-live.
- Supplier criticality tiering
- Ranking suppliers by the impact of their failure on recovery-time-critical activities and dependencies, rather than by spend or contract value.