BCxA ACP flashcards
BCxA ACP · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Commissioning authority
- An independent party who leads the commissioning process, develops the commissioning plan, oversees testing, and verifies that systems meet the owner's project requirements.
- Owner's project requirements
- A document stating the owner's intended use, functional needs, and measurable performance criteria that the design and commissioning process must satisfy.
- Basis of design
- A document recording the design team's assumptions, calculations, and decisions that translate the owner's project requirements into specific design solutions.
- Retro-commissioning
- A commissioning process applied to an existing building that lacks documented owner requirements, typically to improve performance and resolve operational problems.
- Pre-design commissioning activities
- Early tasks including selecting the commissioning authority, defining scope, drafting the owner's project requirements, and setting the commissioning budget and schedule.
- Commissioning plan
- A living document defining commissioning scope, team roles, deliverables, schedule, communication protocols, and the testing and verification strategy for the project.
- Commissioning scope
- The set of systems and assemblies selected for commissioning, commonly HVAC, controls, electrical, plumbing, fire protection, and envelope elements where specified.
- Design review
- A commissioning activity verifying that design documents are consistent with owner requirements and that systems are testable, accessible, and adequately controlled.
- Commissioning specifications
- Contract language assigning contractor responsibilities for submittals, checklists, functional testing, training, documentation, and participation in commissioning meetings.
- Testable sequences of operation
- Controls narratives written clearly enough that functional test procedures can be derived directly from them, including setpoints, interlocks, and failure responses.
- Pre-functional checklist
- A document verifying that equipment is correctly installed and ready for functional testing, serving as a prerequisite before functional performance tests begin.
- TAB verification
- Confirmation that testing, adjusting, and balancing reports show air and water flows meeting design values before functional performance testing proceeds.
- Issues log
- A running record of each deficiency with description, location, responsible party, date identified, and resolution status, closed out before final acceptance.
- Seasonal testing
- Deferred testing conducted when systems cannot be fully exercised under design conditions during initial testing, such as heating in summer or cooling in winter.
- Functional performance test
- A documented procedure verifying that systems operate interactively as specified, including normal operation, setpoint response, alarms, and failure modes.
- Acceptance criteria
- The measurable conditions stated in a test procedure that determine whether a tested system passes or fails, such as flow, temperature, or response time.
- Integrated system test
- A functional test verifying interaction among multiple systems, such as economizer and cooling operation or fire alarm and HVAC shutdown sequences.
- Trend logging
- Recording building automation system data over time to document system performance and supplement or support manual functional test verification.
- Final commissioning report
- A document summarizing the commissioning process, tests performed, results, deficiencies and resolutions, and any deferred or seasonal testing remaining.
- Systems manual
- A consolidated reference combining owner requirements, basis of design, sequences of operation, test records, and maintenance information for ongoing operation.
- O&M manual
- A set of documents organized by system containing manufacturer literature, as-built drawings, controls sequences, and maintenance schedules for the owner.
- As-built drawings
- Record drawings reflecting actual installed conditions, delivered at handover and used for future maintenance, testing, and renovation planning.
- Operator training
- Instruction covering system operation, controls sequences, alarm response, maintenance, and safety, documented with attendance and content before occupancy.
- Post-occupancy review
- A follow-up activity during the warranty phase that verifies ongoing performance against owner requirements and identifies operational issues not seen during construction.
- Preventive maintenance schedule
- A planned list of maintenance tasks, frequencies, and spare parts supporting continued system performance after handover to the owner.
- Handover package
- The set of documents and records transferred to the owner, including as-built drawings, controls documentation, warranties, training records, and the final report.
- Independence of the Cx authority
- The principle that the commissioning authority reports to the owner and avoids undisclosed financial ties to tested parties to preserve objectivity.
- Conflict of interest disclosure
- An ethical requirement to reveal financial or personal relationships that could compromise objectivity in testing, review, or verification activities.
- Commissioning meeting minutes
- A record of agendas, decisions, action items, responsible parties, and due dates that documents communication and supports accountability during the project.
- Change management in commissioning
- Updating the commissioning plan, owner requirements, and test plans when scope or design changes affect commissioned systems during the project.
- Commissioning team roles
- The owner, commissioning authority, design team, contractor, and manufacturers' representatives, each with defined responsibilities stated in the commissioning plan.
- Submittal review
- A construction-phase commissioning activity checking product data and shop drawings for compliance with design intent and commissioning requirements before installation.