BCxA ACP study materials
BCxA ACP study resources

BCxA ACP flashcards

BCxA ACP · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Commissioning authority
An independent party who leads the commissioning process, develops the commissioning plan, oversees testing, and verifies that systems meet the owner's project requirements.
Owner's project requirements
A document stating the owner's intended use, functional needs, and measurable performance criteria that the design and commissioning process must satisfy.
Basis of design
A document recording the design team's assumptions, calculations, and decisions that translate the owner's project requirements into specific design solutions.
Retro-commissioning
A commissioning process applied to an existing building that lacks documented owner requirements, typically to improve performance and resolve operational problems.
Pre-design commissioning activities
Early tasks including selecting the commissioning authority, defining scope, drafting the owner's project requirements, and setting the commissioning budget and schedule.
Commissioning plan
A living document defining commissioning scope, team roles, deliverables, schedule, communication protocols, and the testing and verification strategy for the project.
Commissioning scope
The set of systems and assemblies selected for commissioning, commonly HVAC, controls, electrical, plumbing, fire protection, and envelope elements where specified.
Design review
A commissioning activity verifying that design documents are consistent with owner requirements and that systems are testable, accessible, and adequately controlled.
Commissioning specifications
Contract language assigning contractor responsibilities for submittals, checklists, functional testing, training, documentation, and participation in commissioning meetings.
Testable sequences of operation
Controls narratives written clearly enough that functional test procedures can be derived directly from them, including setpoints, interlocks, and failure responses.
Pre-functional checklist
A document verifying that equipment is correctly installed and ready for functional testing, serving as a prerequisite before functional performance tests begin.
TAB verification
Confirmation that testing, adjusting, and balancing reports show air and water flows meeting design values before functional performance testing proceeds.
Issues log
A running record of each deficiency with description, location, responsible party, date identified, and resolution status, closed out before final acceptance.
Seasonal testing
Deferred testing conducted when systems cannot be fully exercised under design conditions during initial testing, such as heating in summer or cooling in winter.
Functional performance test
A documented procedure verifying that systems operate interactively as specified, including normal operation, setpoint response, alarms, and failure modes.
Acceptance criteria
The measurable conditions stated in a test procedure that determine whether a tested system passes or fails, such as flow, temperature, or response time.
Integrated system test
A functional test verifying interaction among multiple systems, such as economizer and cooling operation or fire alarm and HVAC shutdown sequences.
Trend logging
Recording building automation system data over time to document system performance and supplement or support manual functional test verification.
Final commissioning report
A document summarizing the commissioning process, tests performed, results, deficiencies and resolutions, and any deferred or seasonal testing remaining.
Systems manual
A consolidated reference combining owner requirements, basis of design, sequences of operation, test records, and maintenance information for ongoing operation.
O&M manual
A set of documents organized by system containing manufacturer literature, as-built drawings, controls sequences, and maintenance schedules for the owner.
As-built drawings
Record drawings reflecting actual installed conditions, delivered at handover and used for future maintenance, testing, and renovation planning.
Operator training
Instruction covering system operation, controls sequences, alarm response, maintenance, and safety, documented with attendance and content before occupancy.
Post-occupancy review
A follow-up activity during the warranty phase that verifies ongoing performance against owner requirements and identifies operational issues not seen during construction.
Preventive maintenance schedule
A planned list of maintenance tasks, frequencies, and spare parts supporting continued system performance after handover to the owner.
Handover package
The set of documents and records transferred to the owner, including as-built drawings, controls documentation, warranties, training records, and the final report.
Independence of the Cx authority
The principle that the commissioning authority reports to the owner and avoids undisclosed financial ties to tested parties to preserve objectivity.
Conflict of interest disclosure
An ethical requirement to reveal financial or personal relationships that could compromise objectivity in testing, review, or verification activities.
Commissioning meeting minutes
A record of agendas, decisions, action items, responsible parties, and due dates that documents communication and supports accountability during the project.
Change management in commissioning
Updating the commissioning plan, owner requirements, and test plans when scope or design changes affect commissioned systems during the project.
Commissioning team roles
The owner, commissioning authority, design team, contractor, and manufacturers' representatives, each with defined responsibilities stated in the commissioning plan.
Submittal review
A construction-phase commissioning activity checking product data and shop drawings for compliance with design intent and commissioning requirements before installation.