BCS Preliminary Test study materials
BCS Preliminary Test study resources

Flood Response in a Char Village

BCS Preliminary Test · Put your knowledge to work in context.

All case studies

Flood Response in a Char Village

A char village of 1,200 people sits on a silt island in the Jamuna. In late July the river rises 40 cm per day for four days. The local union parishad has one cyclone shelter 3 km away, reachable by a single raised earthen road that is already ankle-deep. The community has 60 meters of bamboo, 200 sandbags, two country boats, and a stock of dry food for three days. A tube well on the western edge is still above water; the one near the school is submerged. Elderly residents (about 90 people) cannot walk 3 km. A government forecast says the river may peak in 48 hours, but past forecasts have been wrong by up to a meter. Villagers are reluctant to leave livestock behind.

1. Identify the two most urgent risks and justify their priority using the information given.

Read the worked answer

The two most urgent risks are (1) loss of safe drinking water and (2) harm to the ~90 elderly residents who cannot reach the shelter.

Safe water: one tube well near the school is already submerged, and the remaining well sits on the western edge where the river is rising. Floodwater contaminating the only working well creates an immediate diarrhoeal-disease risk for 1,200 people. This is urgent because water is needed daily, whereas the peak is still 48 hours away.

Elderly residents: they cannot walk 3 km on an ankle-deep road, and the two boats cannot move 90 people quickly. Their vulnerability is highest and their evacuation time is longest, so planning must start now.

Livestock reluctance is a real constraint but is a secondary risk: it affects willingness to evacuate, not survival directly. The uncertain forecast argues for acting early rather than waiting for certainty.

2. Propose a 48-hour action plan using only the listed resources, and explain one trade-off.

Read the worked answer

Hours 0-12: Raise the western tube well's platform with sandbags and bamboo so it stays usable; mark it as the designated safe water point and start chlorination or boiling advice. Use 40 sandbags here.

Hours 0-24: Move the 90 elderly people to the nearest raised ground or to a neighbour's raised plinth rather than the distant shelter. Use both country boats for the western cluster first, since that side floods first. Assign two youth volunteers per boat.

Hours 12-36: Build a raised bamboo platform for livestock fodder and a small animal enclosure on the highest ground, so families are not forced to choose between animals and evacuation.

Hours 24-48: Send a small advance team to the cyclone shelter to reserve space, and keep the remaining sandbags to protect the earthen road's lowest stretch.

Trade-off: using boats for the elderly means slower transport of food and sandbags. This is acceptable because the elderly face immediate risk, while the three-day food stock gives a buffer.

3. The forecast is uncertain by up to one meter. How should this uncertainty change the decision compared with a certain forecast?

Read the worked answer

Uncertainty should push decisions toward no-regret, reversible actions taken earlier.

If the peak were certain at a low level, the village could wait and keep resources in reserve. With a possible one-meter error, waiting risks being cut off: the road may become impassable and boats may not reach the elderly in time. So actions that are useful even if the flood is milder should be done now: raising the well, moving the elderly to nearby raised ground, and building the livestock platform.

Actions that are costly and hard to reverse, such as full evacuation of all 1,200 people to the shelter, can be staged: move the most vulnerable first and keep the rest on standby with a trigger, for example if the river rises another 60 cm in 24 hours.

This is the precautionary principle: when the cost of being wrong is severe and the response is cheap and reversible, act before certainty arrives.