BD First Class Boiler Attendant study materials
BD First Class Boiler Attendant study resources

Safety Valve Sizing and Set Pressure Verification

BD First Class Boiler Attendant · Put your knowledge to work in context.

All case studies

Safety Valve Sizing and Set Pressure Verification

You are the chief engineer at a facility with a 10,000 kg/h saturated steam boiler rated at 12 barg design pressure. The boiler is equipped with two safety valves: one with a set pressure of 13.5 barg and another with a set pressure of 14.0 barg. The valve capacity data is not available. The boiler has a maximum allowable working pressure (MAWP) of 12 barg, and the steam demand can suddenly drop to zero due to a process shutdown. The boiler is fired by a burner with a maximum heat input of 8 MW. The feedwater system can supply up to 12,000 kg/h at 105°C. The safety valves are of the spring-loaded type, and the last inspection was 3 years ago. The boiler is due for its annual inspection. The inspector requests that you verify the safety valve sizing and set pressures according to the applicable code (e.g., ASME Section I). You must determine if the existing valves are adequate and what actions are required.

1. Explain the code requirements for safety valve set pressure and capacity for a boiler with a MAWP of 12 barg, and assess whether the existing set pressures are compliant.

Read the worked answer

According to ASME Section I (and similar codes), the safety valve set pressure for a boiler shall not exceed the MAWP, and the highest set pressure shall not exceed the MAWP by more than 3% (or 10% for some cases, but typically 3% for power boilers). For a MAWP of 12 barg, the maximum allowable set pressure is 12 barg (or 12.36 barg if the 3% tolerance is applied). The existing set pressures of 13.5 barg and 14.0 barg are both above the MAWP, which is non-compliant. The code requires that the safety valve set pressure not exceed the MAWP; therefore, these valves are improperly set and must be adjusted or replaced. Additionally, the capacity of the safety valves must be sufficient to discharge all the steam generated by the boiler at the maximum firing rate without allowing the pressure to rise more than 6% above the MAWP (i.e., up to 12.72 barg). The total capacity must be at least equal to the maximum steam generation rate. For a boiler with 8 MW heat input, the approximate steam generation at 12 barg saturated is about 8,000 kW / (2,700 kJ/kg) ≈ 2.96 kg/s ≈ 10,660 kg/h. However, the boiler is rated at 10,000 kg/h, so the safety valves must handle at least 10,000 kg/h. Without capacity data, we cannot confirm adequacy, but the set pressures alone are non-compliant. The inspector will require that the valves be re-set to within the MAWP, and capacity certification be provided. The valves are also overdue for inspection (last inspection 3 years ago; annual inspection required).

2. Describe the procedure to correct the safety valve installation, including testing and documentation, and explain the risks of operating with the current configuration.

Read the worked answer

Procedure to correct: 1) Shut down the boiler and isolate it from the steam header. Allow it to cool and depressurize. 2) Remove the safety valves and send them to an authorized valve repair facility for overhaul, re-setting, and capacity certification. The valves must be set to a pressure not exceeding the MAWP (12 barg), with the highest set pressure typically at the MAWP and the other slightly lower (e.g., 11.5 barg) to provide staged opening. 3) Obtain certified capacity curves from the valve manufacturer or a testing laboratory to verify that the total capacity meets or exceeds the maximum steam generation rate (10,000 kg/h). 4) Reinstall the valves with proper inlet piping (short, straight, and without excessive pressure drop) and discharge piping sized to handle the full flow without backpressure exceeding the valve’s limits. 5) Perform a pop test on each valve at the set pressure using a calibrated pressure gauge; verify that the valve opens and closes properly. 6) Record the set pressure, capacity, and test results in the boiler logbook and provide to the inspector. 7) After the boiler is back in service, test the safety valves by raising pressure to the set point (or using a test gag) under controlled conditions, with the inspector present if required. Risks of current configuration: The safety valves are set above the MAWP, so they will not open until the pressure exceeds the design limit, potentially leading to overpressure and catastrophic failure. The boiler could exceed 12 barg during a sudden loss of steam demand, and the valves would not relieve until 13.5 barg or 14 barg, which is above the MAWP, risking rupture. Additionally, the valves are overdue for inspection and may be stuck or leaking. Operating with non-compliant safety valves is a violation of regulations and poses a severe safety hazard. Immediate action is to reduce the boiler operating pressure to below the lowest set pressure until the valves are corrected, but even then, the valves are not certified for capacity. The boiler should be taken out of service until the safety valves are compliant.