BD Second Class Boiler Attendant flashcards
BD Second Class Boiler Attendant · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Second Class Boiler Attendant
- A certified operator allowed to attend boilers up to a specified capacity, often 500 m² heating surface, under the supervision of a First Class attendant.
- Boiler certificate validity
- A boiler certificate is typically valid for one year and must be renewed after external inspection; internal inspection is required every two years.
- Logbook requirement
- The boiler attendant must record pressure, water level, blowdown, fuel used, and any abnormalities in the logbook every shift.
- Fire-tube boiler
- A boiler where hot combustion gases pass through tubes surrounded by water; limited to about 25 bar due to shell stress.
- Water-tube boiler
- A boiler where water circulates inside tubes with hot gases outside; suitable for high pressures above 100 bar.
- Fusible plug
- A safety device made of low-melting alloy that melts at about 230°C to release steam and warn of low water in a fire-tube boiler.
- Water-wall
- A furnace lining made of tubes carrying water, increasing radiant heating surface and protecting refractory walls from high temperatures.
- Stoichiometric air
- The minimum air required for complete combustion of a fuel; for coal it is about 7-8 kg air per kg coal.
- Three T's of combustion
- Time, Temperature (above 800°C), and Turbulence (mixing) are essential for complete and efficient combustion.
- Chain-grate stoker
- A mechanical stoker with a moving chain grate that feeds coal uniformly and removes ash continuously, used in solid-fuel boilers.
- Atomisation
- The process of breaking fuel oil into fine droplets (under 100 µm) using pressure or steam/air to ensure efficient combustion.
- Warm-up period
- Large boilers require slow warming over 1-2 hours to avoid thermal stress; air vents remain open until steam appears.
- Blowdown procedure
- Open the blowdown valve slowly, hold for 10-30 seconds, then close; repeat to control dissolved solids and conductivity.
- Emergency shutdown
- Trip fuel, close main steam stop valve, and manually open safety valve if pressure continues rising after fuel cut-off.
- Low-water condition
- When water level falls below the safe limit, immediately cut fuel; do not feed water until the boiler has cooled to avoid damage.
- Scale
- Deposits of calcium and magnesium salts on heating surfaces that reduce heat transfer and can cause tube overheating.
- Deaeration
- Removal of dissolved oxygen from feed water by heating to boiling point, often in a deaerator, to prevent corrosion.
- Conductivity blowdown
- Blowdown is controlled by measuring boiler water conductivity; typical limit for shell boilers is 3000-4000 µS/cm.
- Economiser
- A heat exchanger that recovers heat from flue gas to preheat feed water, improving boiler efficiency by 5-10%.
- Saturated steam
- Steam at the boiling point for its pressure; at 10 bar gauge, its temperature is about 184°C.
- Superheated steam
- Steam heated above its saturation temperature at the same pressure, improving efficiency and reducing condensation in pipes.
- Steam trap
- A device that removes condensate and air from steam lines while preventing steam escape; types include thermodynamic, thermostatic, and mechanical.
- Water hammer
- A pressure surge caused by condensate slugs accelerated by steam; prevented by proper trapping and drainage.
- Safety valve
- A valve that automatically releases pressure when it exceeds the set point, typically at or below the boiler design pressure.
- Low-water cut-out
- A protective device that automatically cuts fuel when the water level falls below the safe limit; must be tested regularly.
- Boiler explosion causes
- Low water, overpressure, defective safety valve, or scale-induced overheating can lead to catastrophic boiler failure.
- Burn first aid
- Cool the burn with running water for at least 10 minutes, cover with sterile dressing, and do not apply ointments.
- Hydrostatic test
- A test where the boiler is filled with water and pressurised to 1.5 times design pressure for 30 minutes to check for leaks.
- Steam test
- A test at full operating pressure to verify safety valve lifting and overall integrity, typically after major repairs.
- Internal inspection
- Examination of firebox, tubes, and shell for scale, corrosion, and cracks; requires cooling and cleaning of the boiler.
- Boiler efficiency
- Ratio of heat output in steam to heat input in fuel, expressed as a percentage; calculated by direct or indirect method.
- Heat balance
- An accounting of heat input distributed to steam, stack losses, radiation, blowdown, and unaccounted losses.