A seasonal river separates two blocks in north Bihar. During four monsoon months the only crossing is a privately operated ferry, whose operator holds a three-year contract and charges ₹40 per head and ₹300 per bicycle-load of goods. Villagers report that the operator doubles rates during the peak flood weeks and refuses to carry passengers who do not pay extra. A new pontoon bridge was sanctioned two years ago but only 40% of work is complete; the contractor blames delayed payments and a revised design necessitated by a change in the river's course. The District Magistrate must decide whether to (a) wait for the bridge, (b) cap ferry rates administratively, or (c) subsidise the ferry during peak weeks. Meanwhile a school on the far bank has 30% absenteeism in the monsoon, and a primary health centre reports delayed referrals.

1. Evaluate the three options against the constraints described and recommend one.

Read the worked answer

Each option addresses a different layer of the problem:

  • (a) Wait for the bridge: treats a four-month recurring emergency as a temporary inconvenience. With 40% completion, revised design, and payment delays, the bridge is unlikely within the next monsoon. It leaves the health and schooling harms unaddressed.
  • (b) Cap rates: cheap to announce, but a cap on an operator with a live contract and pricing power during peak weeks is hard to enforce without monitoring staff at the ghat. If the cap is set below cost, the operator may simply stop running at peak - the worst outcome.
  • (c) Subsidise peak-week ferry: directly targets the harm (unaffordable crossing during floods) and preserves service. It is enforceable through a written arrangement with the operator, with the subsidy paid against passenger counts certified by the block office.

Recommendation: (c) for the coming monsoon, combined with (b) as a backstop - a published maximum fare tied to the subsidy - and fast-tracking bridge payments so the interim measure ends. The subsidy should be time-bound and reviewed after the season.

2. What should the administration do about the operator's refusal to carry passengers who do not pay extra?

Read the worked answer

This is a contractual and public-service failure, not merely a pricing dispute. The reasoning:

  • The operator holds a contract; terms presumably include an obligation to carry passengers at sanctioned rates. Extracting extra payment breaches that obligation.
  • The affected passengers include schoolchildren and patients - the refusal has direct health and education consequences, which converts it from a private grievance into a public duty issue.

The administration should (i) obtain the contract terms and issue a written notice citing the obligation and penalty clause; (ii) station an enumerator or supervisor at the ghat during peak weeks, since a right without enforcement is illusory; (iii) set up a complaint channel with the Mukhiya so reports are documented; and (iv) if breaches persist, invoke the penalty or termination provisions rather than tolerate them until the contract ends.

3. How should the absenteeism and referral data be used in the decision?

Read the worked answer

The data should shift the decision from a transport question to a service-continuity question:

  • Absenteeism of 30% is a measurable loss of schooling concentrated in four months. It justifies treating the crossing as essential infrastructure for children, not optional travel.
  • Delayed referrals indicate risk to life; the health centre's referral pathway should not depend on a ferry operator's discretion.

Practical use:

  1. Quantify - count affected students and referral cases per week to size the subsidy and justify it in the file.
  2. Prioritise - free or subsidised passage for students and patients during peak weeks, verified by school and PHC lists.
  3. Coordinate - the education and health departments should jointly certify need, so the subsidy is evidence-based rather than a blanket concession.

Without this, the administration risks choosing the cheapest option rather than the one that protects schooling and health.