BTEB Masonry study materials
BTEB Masonry study resources

BTEB Masonry study plan

BTEB Masonry · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Masonry (trade theory and practical)

  • Define the core masonry terms (brick, block, mortar, bond, course, wythe) in your own words and write a one-line definition for each in a personal glossary.

  • Identify the common masonry units used in your region and list their nominal versus actual dimensions, noting where the difference matters for setting out.

  • Explain the purpose of mortar in a masonry wall and distinguish between mortar and concrete in terms of composition and function.

  • Sketch and label a simple stretcher-bond wall elevation showing courses, joints, and a quoin.

Your checkpoint

A hand-written glossary of at least 25 masonry terms with a labelled stretcher-bond sketch.

Week 2

Masonry (trade theory and practical)

  • Describe the correct procedures for storing and handling bricks and blocks on site to prevent damage and moisture uptake.

  • Explain how to set out a rectangular building corner using a 3-4-5 method and describe how to check squareness.

  • List the personal protective equipment and site safety controls required for basic masonry work and justify each item.

  • Demonstrate (or describe step by step) mixing a small batch of mortar to a workable consistency and state the signs of a correct mix.

Your checkpoint

A written method statement for setting out a rectangular corner, including a labelled diagram and safety notes.

Week 3

Masonry (trade theory and practical)

  • Compare the main mortar types (cement-lime, lime, and factory-made) by their constituents, typical uses, and limitations.

  • Explain the function of each tool in a standard mason's kit and match each tool to the task it performs.

  • Describe how to build a level first course on a foundation, including bedding, plumbing, and checking with a spirit level.

  • Identify the causes of common early defects such as uneven bed joints and out-of-plumb corners, and state one correction for each.

Your checkpoint

A one-page tool-to-task reference sheet plus a short written explanation of how to lay and check a first course.

Week 4

Masonry (trade theory and practical)

  • Explain the purpose of bonds and compare stretcher, English, and Flemish bond in terms of appearance and structural behaviour.

  • Describe how to form a half-brick wall corner and a return, including the sequence of laying.

  • Calculate the number of bricks required for a given wall area using a stated allowance for wastage.

  • Interpret a simple masonry drawing to extract wall thickness, opening positions, and unit type.

Your checkpoint

A worked brick-quantity calculation for two wall areas plus a sketch of English and Flemish bond elevations.

Week 5

Masonry (trade theory and practical)

  • Describe the sequence for constructing a block wall with an opening, including lintel provision and keeping the work plumb.

  • Explain how to build and use a line and pins to keep courses level along a wall.

  • State the purpose of wall ties and movement joints and describe where each is required.

  • Identify the causes of damp penetration in masonry walls and list the design and workmanship measures that prevent it.

Your checkpoint

A step-by-step construction sequence for a block wall with one opening, including lintel and ties.

Week 6

Masonry (trade theory and practical)

  • Explain the principles of cavity wall construction and describe the role of each component in the cavity.

  • Describe how to install insulation and wall ties correctly within a cavity and list the common installation errors.

  • Explain how to form and position a damp-proof course and damp-proof membrane at the correct levels.

  • Describe how to finish joints (pointing and striking) and explain why finish affects weather resistance.

Your checkpoint

A labelled cross-section drawing of a cavity wall identifying every component and its function.

Week 7

Masonry (trade theory and practical)

  • Describe the correct methods for cutting, drilling, and fixing into masonry and match the fixing to the unit type.

  • Explain how to protect finished masonry work from frost, rain, and site damage until handover.

  • List the quality checks a supervisor would make on a completed masonry wall and state an acceptable tolerance for plumb and level.

  • Work through at least 40 practice questions across the whole syllabus and record every wrong answer with the reason.

Your checkpoint

A completed error log of at least 40 practice questions with a written reason for each mistake.

Week 8

Masonry (trade theory and practical)

  • Re-test yourself on the topics in your error log and confirm each weak area is now answered correctly.

  • Summarise the whole syllabus into a single revision sheet of key facts, dimensions, and sequences.

  • Complete two timed full-length practice papers under exam conditions and record your scores.

  • Review any remaining weak areas and write a short note on what you will check first in the exam.

Your checkpoint

Two timed practice-paper scores recorded plus a one-page final revision sheet.

Milestones

Week 2: Can define at least 25 core terms and correctly describe corner setting-out without notes.

Week 4: Can sketch three bonds and complete a brick-quantity calculation accurately.

Week 6: Can label a cavity wall cross-section from memory and explain each component's function.

Week 8: Scores at least 75% on both timed practice papers and has cleared every item in the error log.