BD Marine Engineer Class 1 (Chief Engineer) flashcards
BD Marine Engineer Class 1 (Chief Engineer) · Build recall with a focused review session.
43 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Indicated power formula
- For a four-stroke engine, IP = (P_m × L × A × n × N) / 60,000, where P_m is mean effective pressure in bar, L and A are stroke and piston area in cm, n is number of cylinders, and N is rpm.
- Brake mean effective pressure
- BMEP = (2π × T × n_r) / V_s, where T is brake torque, n_r is revolutions per power stroke, and V_s is swept volume. It is a measure of an engine's ability to produce work per cycle.
- Specific fuel consumption
- SFC is the fuel mass flow rate divided by brake power, usually expressed in g/kWh. Large two-stroke diesels typically have SFC of 160–180 g/kWh; medium-speed four-strokes 180–210 g/kWh.
- Scavenge air pressure
- The pressure of air supplied to the cylinders by the turbocharger. A rise in scavenge pressure without a rise in exhaust temperature may indicate a fouled air cooler or turbine nozzle ring.
- Fuel injection timing
- The moment fuel injection begins relative to top dead centre. Advancing injection raises peak cylinder pressure and NOx; retarding reduces NOx but raises exhaust temperature and fuel consumption.
- Three-phase power formula
- P = √3 × V_L × I_L × cos φ, where V_L is line voltage, I_L is line current, and cos φ is power factor. For a 440 V, 100 A load at 0.8 power factor, P ≈ 61 kW.
- Insulation resistance minimum
- The minimum acceptable insulation resistance for motors and generators is 1 MΩ at 500 V DC. A reading below 0.5 MΩ requires investigation before running the machine.
- Generator synchronisation
- The incoming generator must match the busbar in voltage, frequency, phase angle and phase sequence before the breaker is closed. It is then loaded by increasing governor speed setting.
- Load sharing
- kW load is shared between parallel generators by governor speed droop; reactive kVA load is shared by automatic voltage regulator droop or cross-current compensation.
- Earth fault detection
- On an unearthed system, a single earth fault is detected by an insulation monitoring device or earth-fault lamps. The fault must be cleared before a second fault causes a short circuit.
- Planned maintenance system
- A system that schedules maintenance jobs by running hours or calendar interval. The chief engineer ensures jobs are carried out and recorded, and reports overdue items to the superintendent.
- Vibration monitoring
- Overall velocity in mm/s RMS per ISO 10816. For Class II machines, alarm at 4.5 mm/s and trip at 7.1 mm/s; a rising trend indicates bearing wear, misalignment or imbalance.
- Wear debris analysis
- Spectrometric oil analysis detects dissolved wear metals in ppm; ferrography and magnetic chip detectors detect larger particles. A sudden rise in iron indicates scuffing or gear wear.
- Thermography
- Infrared scanning of electrical panels and bearings to detect hot spots. A temperature rise of more than 10 °C above similar components indicates a loose connection or failing bearing.
- Non-destructive testing
- Dye penetrant detects surface-breaking defects; magnetic particle detects surface and near-surface defects in ferromagnetic materials; radiography and ultrasonic testing detect internal defects.
- Metacentric height
- GM = KM − KG. Positive GM gives stable equilibrium; negative GM gives an unstable loll condition. GM is reduced by adding weight high or by free surface effect.
- Free surface effect
- FSC = (i × ρ) / Δ, where i is the second moment of area of the free surface about its centreline. Longitudinal subdivision reduces the free surface effect.
- Angle of loll
- A ship with negative GM lists to an angle where GZ = 0 and may flop to the other side. Corrective action is to lower G by filling double bottom tanks or removing deck weight.
- Load line marks
- The Plimsoll marks indicate the minimum freeboard assigned by class. The deck line and load line marks are surveyed; overloading beyond the assigned load line is a statutory offence.
- Damage stability
- SOLAS requires subdivision and damage stability calculations so that the ship survives a specified number of compartments flooded. Cross-flooding and watertight doors are part of the design.
- SOLAS chapters
- Chapter I surveys and certificates; II-1 construction and stability; II-2 fire protection; III life-saving appliances; IV radio; V safety of navigation; IX ISM Code; XI-1 special measures.
- MARPOL annexes
- Annex I oil; II noxious liquid substances; III harmful substances in packaged form; IV sewage; V garbage; VI air pollution. The ship must hold the relevant certificates and record books.
- Port State Control
- Inspectors may detain a ship for deficiencies that make it unseaworthy. Common detainable deficiencies are in fire safety, life-saving appliances, and ISM implementation.
- ISM Code
- Requires a Safety Management System, a designated person ashore, master's responsibility and authority, and procedures for reporting non-conformities and accidents. Internal audits and management reviews are required.
- STCW rest hours
- A minimum of 10 hours rest in any 24-hour period and 77 hours in any 7-day period. Rest may be divided into no more than two periods, one of at least 6 hours.
- Oil water separator
- MARPOL Annex I prohibits discharge of oily bilge water except through 15 ppm equipment with alarm and automatic stopping device. The discharge must be recorded in the Oil Record Book.
- MARPOL Annex VI sulphur
- Sulphur limit is 0.50 % m/m outside ECAs and 0.10 % m/m inside ECAs. The ship must hold an International Air Pollution Prevention Certificate and comply with NOx Tier limits.
- Garbage record book
- MARPOL Annex V requires a garbage record book and garbage management plan. Discharge of plastics is prohibited; food waste may be discharged outside special areas at ≥12 nm from land.
- SOPEP
- Shipboard Oil Pollution Emergency Plan, required for ships of 400 GT and above. It includes procedures for reporting, containment and cleanup, and a list of coastal state contacts.
- Fire triangle
- Fuel, oxygen and heat. Removing any one extinguishes the fire. Closed spaces can be smothered by CO2 or foam; water cools and displaces oxygen by steam.
- Fire classes
- A solid combustibles (water, foam); B flammable liquids (foam, CO2, dry powder); C gases (dry powder, CO2); D metals (special dry powder); electrical fires use CO2 or dry powder, never water.
- CO2 fixed system
- Engine room CO2 system must have a pre-discharge alarm and a delay of at least 20 seconds. The space must be sealed and ventilation stopped before discharge.
- Emergency generator
- Must start automatically on loss of main power and supply emergency lighting, navigation lights, radio and steering gear. It must be tested weekly and run under load monthly.
- Enclosed space entry
- A permit is required. Atmosphere must be tested for oxygen (20.9 %), hydrocarbons and toxic gases. Ventilation and a standby person outside are mandatory, with rescue equipment at the entrance.
- Engine room watch
- The watchkeeper must not leave the engine room unattended unless relieved by a qualified person. Unmanned machinery space operation requires alarms and safety devices to be operational.
- Bridge/engine resource management
- Effective communication, assertiveness, leadership and situational awareness. The chief engineer ensures the engine room team understands the plan and contingencies.
- Watch handover
- The watchkeeper must not hand over if in doubt about the new watchkeeper's competence or fitness. The relieving officer must be fully briefed on machinery state and ongoing operations.
- Engineering budget
- Covers spares, stores, lubricants, repairs, surveys and dry-docking. The chief engineer prepares the annual budget and monitors expenditure against it, reporting variances to the superintendent.
- Requisition procedure
- A requisition is raised by the chief engineer, approved by the technical superintendent, and processed by purchasing. The ship confirms receipt and inspects goods against the order.
- Dry-docking specification
- Prepared by the chief engineer with the superintendent, listing all defects and repairs. The chief engineer supervises the work and signs off completed items before the ship sails.
- Standard Marine Communication Phrases
- Standardised phrases for external communication, especially distress, urgency and safety. They avoid ambiguity and are used in bridge-to-bridge and ship-to-shore communications.
- Engine room log book
- Entries must be made in ink, with date, time and signature. Corrections are made by a single line and initials, not by erasure or correction fluid.
- Handover report
- The outgoing chief engineer provides a comprehensive report covering the state of the machinery, outstanding defects, spare gear and ongoing operations.