Blue Prism Installation Engineer study materials
Blue Prism Installation Engineer study resources

Blue Prism Installation Engineer study plan

Blue Prism Installation Engineer · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Infrastructure Planning and Prerequisites

  • Inventory every prerequisite category (OS, database engine, .NET/runtime components, IIS or web host role, certificate services, service accounts) and record the minimum supported version for each in a single checklist

  • Size the target deployment by estimating concurrent interactive clients, unattended digital workers, and peak transaction throughput, then convert those numbers into CPU, memory, and disk allocations

  • Draft the network topology showing application servers, database servers, load balancer, and required port directions between each tier

  • Identify the service account model (per-component vs shared) and list the OS-level rights each account will need

Your checkpoint

A one-page infrastructure readiness checklist plus a labeled topology diagram with port matrix, reviewed against at least three explicit assumptions you wrote down

Week 2

Infrastructure Planning and Prerequisites & Database Setup and Configuration

  • Configure the database server instance settings (collation, compatibility level, max degree of parallelism, tempdb sizing) required before any Blue Prism schema is created

  • Provision the empty database and dedicated SQL login, then verify the login has only the rights the installer needs

  • Confirm storage layout for data, log, and backup files and set a growth strategy that avoids autogrowth thrashing

  • Test connectivity from the prospective application server to the database using the same authentication mode the install will use

Your checkpoint

A database pre-build worksheet documenting instance settings, database name, collation, login, and a successful connectivity test result

Week 3

Database Setup and Configuration

  • Walk through the schema creation process end to end in a lab, capturing each prompt and the value you supplied

  • Verify the resulting schema objects, required roles, and connection string parameters against your worksheet

  • Practice granting and revoking the runtime database permissions the application server account needs, then confirm the app still connects

  • Document a rollback path that returns the database to its pre-install state

Your checkpoint

A repeatable, step-numbered database build runbook with a tested rollback section and screenshots replaced by written expected results

Week 4

Application Server and Component Installation

  • Install the core application server component in the lab and record every prerequisite check the installer performs

  • Add at least one additional component (interactive client or unattended runtime) and confirm it registers correctly against the same database

  • Configure the connection settings for each component and verify they point to the intended environment

  • Capture service startup order and dependency behavior after a host reboot

Your checkpoint

A component installation matrix listing each component, its host, its service account, and its verified connection target, all confirmed working in the lab

Week 5

Application Server and Component Installation & Authentication, Security, and Access Control

  • Configure the authentication mode for the environment and map directory groups to application roles with least privilege

  • Create role assignments for administrator, developer, and runtime accounts, then test each by logging in and attempting a permitted and a forbidden action

  • Enable transport security with a valid certificate and confirm clients reject an untrusted connection

  • Record where credentials for service accounts are stored and who can retrieve them

Your checkpoint

An access control matrix (role x permission x tested result) plus evidence that an untrusted TLS connection is refused

Week 6

Environment Validation and Troubleshooting

  • Build a post-install validation script or checklist covering service health, database connectivity, license state, and component version parity

  • Deliberately break three things (stop a service, revoke a permission, expire a certificate) and record the exact symptom and the fix for each

  • Collect and interpret the primary log locations for installer, application, and database errors

  • Time how long a full validation pass takes so future maintenance windows can be sized

Your checkpoint

A troubleshooting playbook with at least three symptom-cause-fix entries reproduced in the lab and a timed validation checklist

Week 7

Upgrades, Migration, and Maintenance & Database Setup and Configuration

  • Perform a backup and restore of the database into a staging environment and verify the application connects to the restored copy

  • Execute a version upgrade in the lab, recording the required order of database upgrade versus component upgrade

  • Document a migration sequence for moving the application server to new hardware with minimal downtime

  • Write the maintenance calendar covering backups, log truncation, certificate renewal, and patch cadence

Your checkpoint

An upgrade and migration runbook with a completed lab rehearsal, including measured downtime for each phase

Week 8

Environment Validation and Troubleshooting & Upgrades, Migration, and Maintenance & Infrastructure Planning and Prerequisites

  • Rebuild the entire environment from your runbooks alone, without referring to vendor documentation, and log every gap you hit

  • Update the runbooks to close each gap found during the rebuild

  • Run a timed mock exam weighted toward domains 1 through 3 and review every missed item against your notes

  • Produce a final readiness summary listing residual risks and open questions for a senior engineer

Your checkpoint

A clean-room rebuild completed from runbooks only, with revised runbooks and a scored mock exam result above your target threshold

Milestones

Week 2: You can explain, without notes, why each database instance setting matters and what breaks if it is wrong

Week 4: Two components are running against one database and survive a host reboot in the correct startup order

Week 6: You diagnose three injected failures in under 15 minutes each using only logs and your playbook

Week 8: A full environment rebuild is completed from your own runbooks with zero undocumented steps