Blue Prism Technical Architect study materials
Blue Prism Technical Architect study resources

Blue Prism Technical Architect cheat sheet

Blue Prism Technical Architect · Keep the key ideas within reach.

Quick reference

Blue Prism Architecture and Infrastructure

  • Blue Prism separates the interactive client, the runtime resource (bot), the application server, and the database; sessions are brokered by the connection layer, not by peer-to-peer calls.

  • Supported relational back ends are Microsoft SQL Server (primary) and Oracle; the database holds process definitions, work queues, logs, and credentials, so it is the single source of truth.

  • A runtime resource executes published processes only; it cannot edit process logic, which enforces separation between build and run environments.

  • Application Server runs as a Windows service and exposes a WCF-based endpoint; clients and resources connect to it by host name and port, so firewall rules must allow that port from both tiers.

  • Blue Prism Hub and Interact are separate web applications with their own IIS and database prerequisites; they are not installed by the core Blue Prism installer.

  • Each runtime resource needs a Windows interactive session because UI automation requires a desktop; running as a service without an interactive session breaks most surface automations.

  • Licensing is enforced per runtime resource plus per interactive client; a resource without an available licence cannot be started even if a session is connected.

  • High availability is achieved at the database and application server tiers; a single runtime resource is not clustered, so resilience comes from multiple resources and retry logic.

Quick reference

Robotic Operating Model (ROM) and Governance

  • ROM is structured around foundational components: vision and strategy, organisation, processes, technology, people, and governance; each component has defined roles and artefacts.

  • Core roles include the Process Analyst, Solution Designer, Developer, Test Analyst, and Controller; the Controller owns queue health and incident triage at run time.

  • The Centre of Excellence owns standards, reusable assets, and change control; business units own process selection and benefit realisation.

  • Process selection uses a pipeline scoring model weighing volume, standardisation, exception rate, data quality, and regulatory exposure before build begins.

  • A change advisory gate applies to any process already in production; changes are raised as a controlled release, never edited directly on a production resource.

  • Benefit tracking compares pre-automation effort baselines against post-automation handling time and exception rework, reviewed at a fixed cadence.

  • Segregation of duties requires that the person who builds a process is not the sole approver of its production release.

Quick reference

Solution Design

  • A Process Design Instruction (PDI) is produced before build and captures process steps, inputs, outputs, systems touched, exception paths, and volume profile.

  • Decompose work into a driver process that owns queue items and one or more business object actions; keep the driver thin and put reusable logic in objects.

  • Design for restartability: every queue item must be independently processable, and partial completion must be recorded before the next irreversible step.

  • Prefer a queue-driven, producer-consumer pattern over long linear processes; producers create items, consumers process them with controlled concurrency.

  • Identify the process's natural transaction boundary; the queue item is usually that boundary, and its status transitions define the recovery model.

  • Data flow should be explicit: define what is read, transformed, written, and logged, so that rework after an exception is bounded.

  • Non-functional requirements (throughput, peak concurrency, latency, availability window) must be agreed in design, because they drive infrastructure sizing.

Quick reference

Process Definition and Process Studio Standards

  • Naming conventions: processes and objects use a consistent prefix or business-domain naming, and every stage carries a description of its purpose.

  • No hard-coded values in stages; environment-specific values belong in Environment Variables, and business constants belong in a controlled data store.

  • Every loop must have an explicit termination condition and a page-level recovery path; unbounded loops are a defect.

  • Use the Block stage with a recover/resume pair for any group of stages that must be retried as a unit, and rethrow after the last attempt.

  • Exception handling follows a layered pattern: local recover for expected errors, page-level recover for retryable faults, and process-level escalation to the queue.

  • Keep pages small and single-purpose; deep nesting and very long pages raise defect rates and slow review.

  • Use the standard stages for their intended purpose: Calculation for expressions, Decision for branching, Multi-Calc for batch assignment, Collection Manipulation for data shaping.

  • Every process should expose clear start-up inputs and a defined end state, so it can be invoked by a scheduler or by another process.

Quick reference

Object Studio

  • Business objects expose actions; the calling process never touches UI directly, so interface changes are contained inside the object.

  • Separate the object into pages by concern: launch, attach, read, write, close, and utility pages for parsing.

  • Object actions should be idempotent where possible; a repeated write must not duplicate a record, so check-before-write patterns are standard.

  • Use the object's internal work queue or input/output parameters for data exchange; avoid passing large collections through many nested calls.

  • Attach and detach logic must handle the case where the target application is already running, already logged in, or has crashed.

  • Read actions return a collection or a defined output parameter; never rely on screen state being visible to the caller.

  • Clean up in a finally-style path: close windows the object opened, release application handles, and reset the object's internal state.

Quick reference

Application Modelling and Integration

  • Application modeller entries define launch parameters, attach mode (by process name, window title, or handle), and the element tree used by the object.

  • Prefer API or database integration over UI automation when the target system exposes a stable interface; UI is the last resort, not the default.

  • Match on stable element attributes (automation ID, name, class) rather than screen coordinates or ordinal position, which break on layout change.

  • Spy modes differ by technology: Win32 for classic Windows controls, UIA for modern frameworks, browser modes for HTML, and region or image modes as fallbacks.

  • For web targets, keep the browser version and driver aligned with the supported matrix; mismatches are a common source of intermittent attach failures.

  • Terminate the modelled application cleanly after use; orphaned processes accumulate and degrade the resource over long unattended runs.

  • Use wait stages with timeouts for asynchronous screens instead of fixed sleeps, which inflate cycle time and still fail under load.

Quick reference

Data Management

  • Work queues are the primary data structure: each item has a key, a priority, tags, data, status, and attempt count, and status transitions are auditable.

  • Item statuses progress through New, In Progress, Exceptioned, and Completed; deferred items return to the queue after a defined interval.

  • Queue retention settings control how long completed and exceptioned items remain; set them to satisfy audit needs without unbounded growth.

  • Encrypt sensitive fields at the queue level; data at rest in the database is otherwise readable to anyone with database access.

  • Collections are in-memory and are lost on session termination; persist anything that must survive a restart to a queue or an external store.

  • Bulk data operations should be batched; per-row database calls across thousands of items dominate cycle time.

  • Data quality checks belong at the producer stage, so bad items are rejected before they consume consumer capacity.

Quick reference

Security and Credential Handling

  • Credentials are stored in the Blue Prism credential store, never in process logic, text files, or environment variables in plain text.

  • A credential has a name, a username, and a password; processes reference it by name and retrieve the password only at the point of use.

  • Access rights are role-based: users and roles are granted permissions per folder or process, and least privilege applies to both designers and controllers.

  • Audit logging records logins, changes to process definitions, and credential access; the log is the evidence trail for regulatory review.

  • Service accounts used by runtime resources should be dedicated, non-interactive where possible, and excluded from broad domain admin groups.

  • Rotate credentials on a defined schedule and after any staff change; rotation must not require editing process logic.

  • Network traffic between tiers should be encrypted, and database access restricted to the application server and authorised administrators.

Quick reference

Exception Handling, Resilience and Recovery

  • Classify exceptions: business exceptions (data invalid, stop and mark item) versus system exceptions (transient fault, retry then escalate).

  • Retry with a bounded attempt count and a backoff interval; unlimited retries hide defects and saturate the queue.

  • Wrap each queue item in a recover block so that one failure does not terminate the whole session; mark the item exceptioned with the reason.

  • Preserve the exception detail and the current stage name in the item's data, so triage does not require re-running the process.

  • Use the process's clean-up path to close applications and release resources even when the item fails.

  • A crashed resource leaves items In Progress; a recovery routine must detect stale in-progress items and return them to the queue.

  • Alerting thresholds (consecutive failures, queue age, exception rate) trigger controller intervention before service levels are breached.

Quick reference

Deployment, Release Management and Environment Promotion

  • Promote releases through development, test, and production environments; never build directly in production.

  • A release is a packaged set of processes, objects, and dependent resources exported from one environment and imported into the next.

  • Environment variables hold the per-environment differences (URLs, credentials references, file paths), so the same process logic moves unchanged.

  • Version processes and record the version in a release note; a rollback plan must identify the prior known-good package.

  • Change control requires approval, a test evidence record, and a deployment window agreed with the business.

  • Compare the source and target environment before import to catch missing dependencies such as objects, credentials, or environment variables.

  • Post-deployment verification runs a smoke test against the live systems before the scheduler is enabled at full volume.

Quick reference

Performance, Scalability and Capacity Planning

  • Throughput per resource = available run seconds / average handling time per item; total capacity = throughput per resource multiplied by the number of licensed resources.

  • Measure handling time on a representative sample under realistic data volumes; pilot timings on small batches understate contention.

  • Concurrency is bounded by the target application's tolerance, licence terms, and database contention, not only by the number of bots.

  • Queue priority and tags let high-value work pre-empt bulk work without building separate processes.

  • Identify the bottleneck tier (UI interaction, database, API rate limit, network) before adding resources; adding bots to a saturated back end reduces throughput.

  • Account for non-processing time: login, application start-up, scheduled maintenance windows, and retry overhead all reduce effective capacity.

  • Plan headroom for peak volume and for rework of exceptioned items, typically a margin above the average daily workload.