BPI QCI flashcards
BPI QCI · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Inspection definition
- A conformity evaluation by observation and judgment, with or without measurement, against specified requirements. It yields an accept or reject decision rather than a diagnosis of cause.
- Test uncertainty ratio
- The ratio of the tolerance being judged to the measurement uncertainty. A ratio of at least four to one is the common threshold for a measurement to be considered adequate for the decision.
- Hold point
- A designated stage in the work where the contractor may not proceed until the inspector has performed the required verification and recorded formal sign-off.
- Witness point
- A designated stage where the contractor notifies the inspector before proceeding. Work may continue if the inspector does not attend or object.
- Nonconformance disposition
- The formal decision on nonconforming work: rework, repair, use-as-is with justification, or reject. Each disposition requires documented authority and follow-up verification of effectiveness.
- First article inspection
- A full verification of the first produced unit or assembly against all requirements, used to validate the process before volume work proceeds under sampling surveillance.
- Calibration traceability
- An unbroken chain of comparisons linking the field instrument through working and reference standards to a national or international standard, each link with documented uncertainty.
- Critical defect
- A defect that creates an unsafe condition or renders the item unfit for its intended use. A single occurrence typically rejects the entire lot or installation.
- Blower door reference pressure
- Enclosure leakage is compared at 50 pascals, about 0.2 inches of water column. Natural leakage is often estimated by dividing the cfm50 result by roughly 15 to 20.
- Normalized leakage
- Leakage at the reference pressure divided by conditioned floor area or by envelope area. Comparisons require the same metric, reference pressure, and building type.
- Zone pressure test
- A measurement of pressure differential between conditioned space and an attached zone such as a garage, attic, or crawlspace, used to confirm separation and air barrier continuity.
- Duct leakage to outside
- The portion of total duct leakage that escapes to unconditioned space, found by subtracting the pressurized-house test result from the total leakage test result.
- Thermal imaging delta T
- Infrared surveys need a steady temperature difference across the assembly, commonly at least 10 degrees Fahrenheit, plus low solar gain and low wind for interpretable results.
- Wood moisture content
- The mass of water in wood expressed as a percentage of oven-dry mass. Readings above roughly 20 percent support conditions for decay and mold growth.
- Worst-case draft test
- A spillage or draft check performed with all exhaust fans running and interior doors positioned to maximize depressurization, confirming appliances vent properly under the harshest normal condition.
- Sensible heat airflow equation
- Airflow in cubic feet per minute equals sensible load divided by 1.08 times the temperature difference, for standard air near sea level.
- Static pressure budget
- The sum of pressure drops across the filter, coil, and duct system compared with the air handler's rated external static pressure, confirming the fan can deliver design airflow.
- Scope verification references
- Installed work is compared to the contract or work order, the approved drawings and specifications, and the applicable code, with the most stringent requirement governing.
- Undocumented substitution
- A material or method installed without prior written approval. It is nonconforming even if it performs well, because the approved scope was not delivered.
- Double counting measures
- Crediting the same improvement under both a prescriptive allowance and a performance-path calculation. A measure may be claimed once, on one path only.
- Insulation coverage check
- Verification of R-value, installed thickness, percentage of cavity filled, and contact with the air barrier. Compressed or gapped insulation fails despite a correct label rating.
- Air barrier continuity
- Confirmation that the air control layer is unbroken across transitions, penetrations, and framing intersections, and that it aligns with the insulation boundary to control condensation.
- Delivered ventilation airflow
- Measured airflow of the installed ventilation fan at its actual static pressure, compared with the design value. Rated nameplate airflow alone does not demonstrate compliance.
- Code edition citation
- Identifying the year and section of the adopted code edition that applies. The same assembly can be compliant in one edition and noncompliant in another.
- Documented equivalency
- A written determination by an engineer or program administrator that an alternative material or method meets the intent of the requirement. Field judgment alone is insufficient.
- Report minimum content
- What was inspected, the standard applied, the method and instrument used, the result with units, and the disposition. Omitting any element makes the finding contestable.
- Evidence-grade photograph
- An image that is dated, identified by location and orientation, and explicitly linked to the finding it supports. Unlabeled photographs do not constitute evidence.
- Record traceability
- A unique report identifier, inspector identity and credentials, date and time, and revision history showing what changed and why across the record's life.
- Instrument record
- Documentation of the instrument serial number, calibration date, and calibration due date. Results from instruments past due are flagged rather than accepted.
- Corrective action closure
- Retirement of a finding only after objective evidence of re-inspection or retest confirms the correction. A verbal assurance from the installer is not sufficient closure.
- Client data confidentiality
- Client information is disclosed only as authorized by the program agreement, and records are retained for the period the program specifies.
- Invoice reconciliation
- Matching billed quantities and measures against verified installed scope and test results, so payment reflects documented work rather than contractor claims.