ANAC Agricultural Pilot Helicopter (PAGH) study plan
ANAC Agricultural Pilot Helicopter (PAGH) · Give each week a clear focus.
8 weeks · About 6 hours per week
Air Law, ANAC Regulations and Agricultural Aviation Rules & Agricultural Application: Products, Equipment and Calibration
Map the ANAC regulatory structure for agricultural aviation, listing which rule sets govern pilot licensing, aerial application operations, and restricted-category airworthiness
Build a one-page reference sheet of the pilot-in-command responsibilities and documentation that must be carried on an agricultural application flight
Define the legal limits on low-level application flying, including minimum heights over congested versus unpopulated areas and the conditions that permit descent below them
Identify the record-keeping and notification duties that apply before, during, and after an application sortie
Your checkpoint
A dated regulatory summary sheet covering licensing, operational limits, and documentation, cross-checked against the current ANAC text with each item's source article noted
Air Law, ANAC Regulations and Agricultural Aviation Rules & Operational Procedures and Helicopter Flight Techniques
Interpret the rules on operating near aerodromes, populated centres, and sensitive areas, and translate them into a pre-flight go/no-go checklist
Outline the crew briefing content required before a spray operation, including hazards, escape routes, and radio calls
Describe the accident and incident reporting chain and the reporting timelines an agricultural pilot must meet
Compare permitted versus prohibited carriage and dropping of products under the applicable regulations
Your checkpoint
A two-page operational compliance checklist for a single application sortie, written so another pilot could use it unaided
Agricultural Application: Products, Equipment and Calibration & Flight Performance, Loading and Mass and Balance
Explain how nozzle type, orifice size, spray pressure, and droplet spectrum interact to set the application rate
Compute the product quantity and water volume needed for a stated swath width, forward speed, and field area
Describe calibration procedures for a helicopter spray system and state the tolerances that trigger recalibration
Calculate basic mass and balance inputs for a spray load, including how the load shifts the centre of gravity as it is discharged
Your checkpoint
A worked calibration and loading worksheet for two hypothetical fields with different swath widths, showing every arithmetic step and the resulting centre-of-gravity check
Flight Performance, Loading and Mass and Balance & Principles of Flight (Helicopter)
Compute density altitude and explain its effect on hover performance, translational lift, and payload decisions
Interpret a helicopter performance chart to determine maximum allowable spray load for stated temperature, pressure altitude, and wind conditions
Explain retreating-blade stall, translational lift, and vortex ring state in terms of the forces acting on the rotor
Apply the mass and balance envelope to decide whether a planned load is legal before departure
Your checkpoint
A closed-book performance and loading problem set of ten questions, scored and reviewed, with every missed item reworked and annotated
Operational Procedures and Helicopter Flight Techniques & Aircraft General Knowledge: Helicopter Structure, Powerplant and Systems
Sequence the phases of an application pass, from the initial approach through the spray run to the breakaway and turn
Describe safe turn direction and escape procedures when obstacles, terrain, or wind shear interrupt a spray run
Trace the fuel, hydraulic, and spray-system circuits on the helicopter and identify the failure indications for each
Explain pre-flight and post-flight inspection items specific to spray equipment and rotor systems
Your checkpoint
An annotated cockpit-flow diagram and emergency drill card covering spray-system failure, engine failure during application, and forced landing
Meteorology & Navigation
Interpret local weather products and identify the wind, temperature, and stability conditions that make spraying unsafe or unlawful
Explain how temperature inversions and drift affect spray deposition and how to detect an inversion before starting a run
Plan a low-level ferry and application route using map, GPS, and visual references, accounting for obstacles and restricted airspace
Convert between heading, track, and wind correction for a low-level crosswind application pass
Your checkpoint
A weather go/no-go decision matrix plus a plotted navigation plan for a multi-field operation, including wind-correction calculations for each leg
Human Performance and Limitations & Communications
Identify the physiological hazards of low-level agricultural flying, including fatigue, dehydration, heat stress, and carbon monoxide exposure
Assess how workload, vibration, and long spray days degrade decision-making, and list personal countermeasures
State standard phraseology for the radio calls used at uncontrolled aerodromes and during low-level operations
Describe the readback and position-reporting discipline expected when sharing airspace with other agricultural aircraft
Your checkpoint
A personal fatigue and fitness-for-duty checklist plus a scripted radio-call card covering departure, spray-run entry, and return-to-base calls
Air Law, ANAC Regulations and Agricultural Aviation Rules & Agricultural Application: Products, Equipment and Calibration
Review every domain's weak points identified in earlier weeks and rank them by remaining risk
Rehearse mixed-topic questions under timed conditions across all ten domains
Reconcile any regulatory or calibration notes that conflict with the current ANAC publications
Confirm that all deliverables from weeks one through seven are complete and corrected
Your checkpoint
A timed 60-question mixed mock exam, scored by domain, with a written remediation list for any domain scoring below 80 percent
Milestones
Week 2: Recite the licensing, documentation, and low-level operating limits from memory and pass a ten-question regulatory quiz at 80 percent or better
Week 4: Complete the ten-question performance and loading set closed-book with all calculations shown and no more than one arithmetic error
Week 5: Walk through the emergency drill card aloud for three scenarios without referring to notes
Week 6: Produce a weather go/no-go decision for three sample days and justify each call against the matrix
Week 8: Score 80 percent or better overall on the mock exam with no domain below 70 percent, and have a dated remediation list for every weak area