ESA study materials
ESA study resources

ESA cheat sheet

ESA · Keep the key ideas within reach.

Quick reference

Regulatory Framework and Environmental Law

  • CERCLA §107 imposes strict, joint and several, and retroactive liability on current owners/operators, past owners/operators at disposal time, arrangers, and transporters.

  • CERCLA §101(20)(A) defines a vessel or facility owner/operator; the security interest exemption protects lenders who hold indicia of ownership primarily to protect a security interest without participating in management.

  • The bona fide prospective purchaser (BFPP) defense under CERCLA §101(40) requires all appropriate inquiries, no affiliation with liable parties, and continuing obligations including reasonable steps and cooperation.

  • The innocent landowner defense under §101(35) requires AAI before acquisition plus post-acquisition reasonable steps and full cooperation with response actions.

  • RCRA Subtitle C regulates hazardous waste from cradle to grave via generator, transporter, and TSDF requirements; Subtitle D governs nonhazardous solid waste landfills.

  • The Clean Water Act §404 program (USACE) governs dredge and fill material discharge into waters of the US; §402 NPDES permits govern point source discharges.

  • SARA Title III (EPCRA) requires reporting under §302/311/312 (hazardous chemicals) and §313 Toxics Release Inventory for facilities above threshold quantities.

  • The Clean Air Act regulates stationary sources through New Source Review and NESHAP/MACT; the Brownfields Revitalization Act (2002) funds assessment and cleanup and clarifies federal liability protections.

Quick reference

Phase I Environmental Site Assessment Process (ASTM E1527)

  • ASTM E1527-21 defines the Phase I scope: records review, site reconnaissance, interviews, and a written report; the goal is identifying RECs, CRECs, and HRECs.

  • AAI under 40 CFR Part 312 requires the assessment be conducted or updated within one year prior to acquisition, with specified components (interviews, records, site visit) completed within 180 days.

  • Standard historical sources include aerial photographs, fire insurance maps (Sanborn), city directories, topographic maps, and recorded land title records.

  • The regulatory database search uses ASTM standard radii; for example, NPL sites are searched at a 1-mile minimum radius and RCRA generators at a 1/8-mile radius (ASTM E1527-21).

  • A REC is the presence or likely presence of hazardous substances or petroleum products indicating a release or threat of release; a CREC is a REC that has been addressed but controls may be required.

  • An HREC is a historical REC where a past release has been addressed to unrestricted use without controls; it does not require action but must be disclosed.

  • The environmental professional must meet education, experience, and licensure criteria in 40 CFR 312.10 and must declare the assessment meets AAI standards.

  • A Phase I is not a guarantee of no contamination; the standard does not include sampling, and data gaps must be identified and evaluated in the report.

Quick reference

Recognized Environmental Conditions (RECs) and Historical Research

  • REC findings must be documented with a rationale linking the identified condition to a release or potential release of hazardous substances or petroleum products.

  • Historical uses most likely to produce RECs include dry cleaners, auto repair, gas stations, metal plating, printing, and manufacturing with solvent use.

  • Sanborn fire insurance maps can show past USTs, gasoline tanks, dry cleaning operations, and industrial uses not visible in current conditions.

  • City directories provide year-by-year occupancy data useful for corroborating historical uses when photographs or maps are unavailable.

  • A business environmental risk (BER) is a condition that may present a business risk but does not meet the REC definition; it is reported separately.

  • A de minimis condition is a release that does not pose a threat to human health or the environment and does not meet the REC threshold.

  • A controlled REC requires an evaluation of whether the engineering or institutional control remains effective and whether it limits current or future use.

  • Vapor intrusion potential from contaminated groundwater or soil beneath a building should be evaluated as a potential REC if the site is in a known vapor-affected area.

Quick reference

Phase II Environmental Site Assessment and Sampling

  • A Phase II is a sampling and analysis investigation designed to evaluate RECs identified in the Phase I; it is not a regulatory cleanup or a guarantee of closure.

  • A conceptual site model (CSM) identifies sources, release mechanisms, exposure pathways, and receptors to guide sampling locations and analytes.

  • Soil boring and monitoring well locations should target suspected source areas, downgradient groundwater, and migration pathways identified in the CSM.

  • A sampling and analysis plan (SAP) should document objectives, analytes, methods, detection limits, QA/QC, and data quality objectives.

  • Quality assurance includes field duplicates, trip blanks, equipment blanks, matrix spikes, and chain-of-custody documentation for defensible data.

  • Low-flow (low-stress) groundwater sampling minimizes turbidity and produces representative dissolved-phase concentrations compared with high-flow purging.

  • Field screening tools (PID, FID, OVA) provide real-time volatile organic compound indications to guide sample selection but are not definitive analytical results.

  • Data validation and comparison to applicable regulatory screening levels (e.g., EPA RSLs, state standards) support conclusions and recommendations for further action.

Quick reference

Contaminants, Fate and Transport, and Risk Assessment

  • Common contaminants include chlorinated solvents (PCE, TCE), petroleum hydrocarbons (BTEX, TPH), heavy metals (lead, arsenic), PCBs, and pesticides.

  • Dense non-aqueous phase liquids (DNAPLs) such as PCE and TCE sink below the water table and can act as long-term continuing sources.

  • Light non-aqueous phase liquids (LNAPLs) such as gasoline float on the water table and spread laterally with groundwater flow.

  • Fate and transport processes include advection, dispersion, sorption, volatilization, biodegradation, and abiotic transformation.

  • The risk assessment paradigm (EPA) includes hazard identification, dose-response assessment, exposure assessment, and risk characterization.

  • The hazard quotient equals the exposure dose divided by the reference dose; a value greater than 1 indicates potential concern for noncarcinogens.

  • Carcinogenic risk is estimated as exposure dose times the cancer slope factor (or inhalation unit risk), with target risk ranges typically 1E-06 to 1E-04.

  • The vapor intrusion pathway is evaluated using the Johnson and Ettinger model, comparing indoor air concentrations to risk-based screening levels.

Quick reference

Report Writing, Documentation, and Professional Standards

  • A Phase I report must include the environmental professional's declaration, site description, records review, interviews, site reconnaissance, findings, and conclusions.

  • Findings must distinguish RECs, CRECs, HRECs, de minimis conditions, and BERs, with an opinion on whether the property qualifies for liability protections.

  • Data gaps must be identified, and the report must state whether each gap affects the ability to identify RECs and whether it was resolved.

  • The report should document the ASTM E1527 version used, the date of the site visit, and the date of the report.

  • The environmental professional's qualifications and signature are required; a report without a signed declaration does not satisfy AAI.

  • Documentation should be clear, objective, and free of unsupported conclusions; each finding should be traceable to a source (records, interviews, or observations).

  • Retention of supporting documentation (maps, photographs, database reports, correspondence) is essential for defensibility and potential future litigation.

  • Professional standards include following applicable state licensing requirements and avoiding conflicts of interest that could compromise objectivity.

Quick reference

Due Diligence, Liability, and Transactional Considerations

  • Due diligence should be tailored to the transaction type, the property's historical use, the buyer's risk tolerance, and the lender's requirements.

  • The Phase I must be completed or updated within one year prior to acquisition, with specified components within 180 days, to satisfy AAI.

  • The BFPP defense requires that the purchaser conduct AAI, not be affiliated with a liable party, and take reasonable steps to prevent or limit exposure.

  • Lender liability protection depends on the security interest exemption; participating in management can forfeit that protection.

  • Environmental insurance (pollution legal liability, cost cap, and remediation stop-loss) can transfer risk identified during due diligence.

  • Purchase price adjustments, escrows, indemnities, and representations and warranties allocate environmental risk between buyer and seller.

  • State voluntary cleanup programs (VCPs) can provide liability relief and closure letters, but the scope and protections vary by state.

  • Continuing obligations after acquisition include complying with land use restrictions, maintaining institutional controls, and responding to agency information requests.