CETP-AUD · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Audit Planning, Scoping, and Risk Assessment

  • Map each element of a risk-based audit scope (entities, systems, data categories, regulatory drivers) to a written scoping memo for a fictional organization

  • Draft a risk register that scores at least eight audit-relevant risks on likelihood and impact, and justify each score in one sentence

  • Sequence audit activities across planning, fieldwork, and reporting so that dependencies and resource needs are explicit

  • Identify the evidence each planned test will require before fieldwork begins

Your checkpoint

A 2-3 page audit planning and scoping memo with an attached risk register of at least eight scored and justified risks

Week 2

Audit Planning, Scoping, and Risk Assessment & Privacy and Trust Governance, Policies, and Accountability

  • Convert the week-1 risk register into a testable audit program with objectives, procedures, and evidence sources for each high risk

  • Build a responsibility matrix that assigns accountability for privacy outcomes to named roles rather than departments

  • Evaluate whether a sample privacy policy set contains enforceable, measurable commitments or only aspirational language

  • Trace three policy statements to the controls that would demonstrate they operate in practice

Your checkpoint

An audit program covering the top five risks, plus a one-page accountability (RACI-style) matrix with policy-to-control traceability for three commitments

Week 3

Data Subject Rights and Consent Management

  • Classify a set of processing activities by lawful basis and flag those where the stated basis is unsupported

  • Design a consent capture and withdrawal workflow that records timestamp, scope, version, and channel for each consent event

  • Evaluate whether a subject access request process meets statutory timelines under load, and identify bottlenecks

  • Draft test procedures that verify consent records actually reconcile to downstream processing systems

Your checkpoint

A subject rights and consent test plan containing at least ten procedures, each with a pass/fail criterion

Week 4

Data Lifecycle, Retention, and Disposal Controls & Security Safeguards and Technical Control Testing

  • Build a data inventory for one business function spanning collection through disposal, and mark where retention clocks start

  • Test sample records against the retention schedule to detect over-retention and premature deletion

  • Select technical safeguards (encryption, access control, logging, key management) and write a test step for each that produces observable evidence

  • Distinguish control design deficiencies from operating effectiveness failures using two worked examples

Your checkpoint

A data lifecycle and technical control test workbook with a completed sample test of ten records and three safeguard test procedures

Week 5

Security Safeguards and Technical Control Testing & Third-Party and Vendor Risk Auditing

  • Execute the safeguard test procedures drafted in week 4 against a mock environment and record results with evidence references

  • Design a vendor risk tiering model and assign at least six vendor types to tiers with rationale

  • Draft pre-contract due diligence questions and ongoing monitoring requirements matched to each vendor tier

  • Identify the contract clauses needed to preserve audit rights, breach notification timing, and subprocessor oversight

Your checkpoint

A vendor risk assessment package: tiering model, six assigned vendor types, and a due diligence and monitoring checklist

Week 6

Third-Party and Vendor Risk Auditing & Incident Response, Breach Notification, and Monitoring

  • Assess a mock vendor's breach notification commitment against the organization's own incident response timelines

  • Construct an incident response timeline for a hypothetical breach, marking detection, containment, assessment, and notification triggers

  • Determine notification obligations to regulators and individuals using a decision tree keyed to data type and jurisdiction

  • Design monitoring metrics and log review cadences that would have detected the hypothetical incident earlier

Your checkpoint

An incident response and notification runbook excerpt with a decision tree and a post-incident monitoring metric set

Week 7

Regulatory Frameworks and Cross-Border Data Transfers & Audit Evidence, Sampling, and Documentation

  • Compare the core obligations of two regulatory frameworks and note where a single control satisfies both

  • Map a cross-border data transfer scenario to an appropriate transfer mechanism and document the residual risk

  • Build a sampling plan that states population, method, sample size rationale, and tolerable error rate

  • Assemble an evidence log that links each finding to a document, system extract, or interview record

Your checkpoint

A cross-border transfer assessment plus an evidence and sampling log covering every finding gathered so far

Week 8

Reporting, Remediation, and Continuous Improvement & Audit Evidence, Sampling, and Documentation

  • Write findings in a condition-criteria-cause-effect structure and rate each by severity

  • Produce remediation recommendations with owners, target dates, and validation criteria

  • Consolidate the prior weeks' artifacts into a single audit report with a clear opinion or conclusion

  • Define two continuous improvement measures that would show remediation is durable rather than cosmetic

Your checkpoint

A complete mock audit report with rated findings, a remediation tracker, and two continuous improvement metrics

Milestones

Week 2: Can explain, without notes, how each high risk in the register maps to a specific audit procedure and evidence source

Week 4: Can distinguish a design deficiency from an operating effectiveness failure in two unfamiliar scenarios and state the correct audit response for each

Week 6: Can walk through the breach decision tree end to end and correctly name the notification recipients and deadlines for a given scenario

Week 8: The consolidated report contains at least five findings, each traceable to logged evidence and paired with an owned remediation action