- Regulated electrical work
- Work that the Electrical Safety Standards Act and its regulation define as requiring a permit and a qualified person, including installation, alteration, and repair of electrical equipment.
- Electrical contractor licence
- An authorization issued under the Act permitting a business to offer or undertake regulated electrical work, subject to a qualified person being responsible for the work.
- Electrical permit
- A document authorizing specified regulated electrical work at a stated location; it must be obtained before work begins and requires inspections at mandated stages.
- Field safety officer authority
- Powers granted by the Act to inspect installations, issue compliance orders, order disconnection of unsafe equipment, and recommend suspension or cancellation of certificates.
- Compliance order
- A written direction from a field safety officer requiring a specified deficiency to be corrected within a stated time, enforceable through further regulatory action.
- Declared electrical equipment
- Equipment that must bear certification from a recognized testing agency before it may be sold, offered for sale, or installed in the province.
- Incident reporting duty
- The obligation to notify the safety authority of electrical incidents causing injury or fire, or of electrical contact, within the prescribed time and manner.
- Certificate of qualification
- A credential issued under the Act confirming that the holder has met the qualification requirements to perform regulated electrical work within a defined scope.
- Canadian Electrical Code Part I
- The installation standard adopted by regulation in the province, setting minimum requirements for electrical installations and supplemented by provincial amendments and bulletins.
- Approved equipment meaning
- A defined code term meaning equipment acceptable to the authority having jurisdiction, typically evidenced by certification from a recognized testing agency.
- Ampacity correction factors
- Multipliers applied to table conductor ampacity to account for ambient temperature and conductor bundling, applied together to determine the permitted current-carrying capacity.
- Bonding definition
- A permanent low-impedance connection between metal parts ensuring electrical continuity and the capacity to conduct fault current safely to the source.
- Grounding electrode system
- The set of electrodes and conductors connecting the electrical system to earth, governed by code rules on type, installation, and connection to the service neutral.
- Overcurrent device rating
- The current rating and interrupting capability of a fuse or breaker, which must protect conductors at their ampacity and withstand available fault current.
- Raceway fill limits
- Code table limits on the proportion of a conduit's cross-section occupied by conductors, calculated from conductor area and raceway internal area.
- Code amendment precedence
- The rule that provincial amendments and published bulletins modify or supersede the base code text where the two differ, and the more restrictive applies.
- Demand load calculation
- A method that applies code-permitted demand factors to connected loads to determine the service or feeder load used for sizing conductors and protection.
- Two-wire voltage drop
- Calculated as VD = 2 × L × I × R, using one-way length, load current, and conductor resistance per unit length at operating temperature.
- Three-phase voltage drop
- For a balanced load, VD = √3 × L × I × R, where L is one-way length, I is line current, and R is conductor resistance per unit length.
- Motor branch circuit sizing
- Conductors and short-circuit protection are sized from code motor full-load current tables rather than nameplate current, with separate overload protection rules.
- Available fault current
- The prospective short-circuit current at a point in the system, which must not exceed the interrupting rating of devices or withstand rating of equipment.
- Working space clearance
- The code-required clear area in front of electrical equipment, maintained for safe operation and maintenance and free of storage or obstruction.
- Fault path impedance
- The total impedance of the bonding and grounding path during a fault, which determines whether the overcurrent device clears the fault within the required time.
- Service conductor sizing
- Selection of service conductors with corrected ampacity at least equal to the calculated demand load and coordinated with the service overcurrent protection rating.
- Lockout verification
- The process of isolating all energy sources, applying personal locks, and testing for absence of voltage with an instrument verified on a known source.
- Energized work authorization
- A document permitting work on energized equipment where de-energization is infeasible, recording hazard assessment, required PPE, and qualified supervision.
- Arc flash risk assessment
- An evaluation establishing incident energy or PPE category and shock approach boundaries for a task before energized work is permitted to proceed.
- Electrical safety program
- A documented set of hazard identification, risk assessment, written procedures, training, and audit activities governing electrical work by the contractor.
- Incident root cause analysis
- A structured investigation identifying the underlying cause of an electrical incident, the corrective action taken, and the records supporting regulatory reporting.
- Compliance audit
- A comparison of site practice against permit conditions, code requirements, and written safety procedures, used to identify and correct deficiencies before enforcement.
- Qualification scope matching
- The principle that assigned duties must fall within the worker's certified trade scope and documented supervised experience, verified through training records.
- Record retention period
- The length of time permits, inspection results, maintenance logs, and incident reports must be kept, as specified by the regulation and permit conditions.