Owner's Construction Manager flashcards
Owner's Construction Manager · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Design-Bid-Build
- Delivery method where the owner contracts separately with a designer and, after competitive bidding on complete documents, with a builder. It is linear, so duration is longest and design-construction coordination risk stays with the owner.
- Construction Manager at Risk
- Delivery method where a CM holds a guaranteed maximum price and subcontracts the trades while the owner retains the designer. The CM bears cost risk above the GMP and provides constructability input during design.
- Agency Construction Manager
- Delivery method where the CM acts as the owner's advisor, holds no trade contracts, and bears no construction cost risk. It is used to add schedule and constructability expertise to a traditional contract structure.
- Integrated Project Delivery
- Collaborative delivery using a multi-party agreement that aligns risk and reward among owner, designer, and builder. Liability waivers and shared savings pools are common features requiring legal review.
- Progressive Design-Build
- Delivery method where the owner selects a design-builder on qualifications, then develops design and price jointly in phases. The contract converts to a fixed price or GMP at a defined design milestone.
- Multiple Prime Contracts
- Structure where the owner contracts directly with several trade contractors instead of one general contractor. The owner assumes coordination responsibility, and performance guarantees must be coordinated across contracts.
- Guaranteed Maximum Price
- Contract ceiling above which the contractor absorbs cost overruns, subject to defined allowances and owner-directed changes. Savings above the GMP may be shared or returned per the contract terms.
- Net-to-Gross Efficiency Ratio
- Ratio of net usable area to gross building area, typically 0.65 to 0.85 depending on building type. Gross area equals net usable area divided by this ratio.
- Life-Cycle Cost Analysis
- Method comparing options by discounting initial cost plus future operations, maintenance, energy, and replacement costs to present value. It supports decisions where first cost and operating cost diverge.
- Owner's Project Requirements
- Document recording measurable performance and functional targets for the facility, used as the basis for design and later for commissioning verification. It complements rather than replaces the design contract documents.
- Project Charter
- Document fixing scope, budget, schedule, success criteria, and key roles at project authorization. It serves as the baseline against which changes and performance are measured.
- Feasibility Screening
- Pre-design check of zoning, floor-area ratio, parking ratios, utility capacity, and entitlement timeline. Findings can reduce site capacity and must be resolved before design funding is committed.
- Risk Register
- Log recording each identified risk with probability, impact, owner, and mitigation action. It is reviewed at stage gates and updated as the project moves through phases.
- Best-Value Procurement
- Selection approach scoring technical merit and price together rather than awarding to the lowest bidder. Published evaluation weights and methodology reduce protest exposure and improve outcome alignment.
- Two-Step Procurement
- Process issuing a request for qualifications to shortlist firms, followed by a request for proposals from shortlisted firms. It is used where qualifications matter more than price alone.
- Bid Responsiveness
- Determination that a bid includes required forms, bonds, and acknowledgment of all addenda. A nonresponsive bid must be rejected regardless of price.
- Bid Leveling
- Normalization of competing bids by adjusting for alternates, unit rates, qualifications, and exclusions. It allows comparison on equivalent scope before award recommendation.
- Addendum
- Written modification issued to all bidders before bid opening that clarifies or changes the solicitation documents. It is the only binding method for pre-bid clarifications.
- Unit Price Contract
- Contract paying fixed rates per unit of measured quantity, used where quantities are uncertain. The owner bears quantity risk while the contractor bears unit rate risk.
- Request for Information
- Formal contractor query about document ambiguity or conflict, answered by the designer within a stated turnaround. Responses become part of the contract documentation.
- Construction Change Directive
- Written owner instruction to proceed with changed work before price agreement is reached. Cost is later resolved by negotiation or force-account accounting methods defined in the contract.
- Substantial Completion
- Stage at which the work is sufficiently complete for its intended use, starting warranty periods and stopping liquidated damages. Punch list items remain until final completion.
- Retainage
- Percentage withheld from each progress payment until specified milestones or final completion. It provides owner leverage for incomplete work and unresolved claims.
- Commissioning
- Verification process confirming that systems are installed, function, and perform per the owner's project requirements. It concludes with documented acceptance before occupancy.
- Cost Performance Index
- Earned value divided by actual cost. A value below 1.0 means work is costing more than planned, and it is used to forecast estimate at completion.
- Schedule Performance Index
- Earned value divided by planned value. A value below 1.0 indicates less work completed than scheduled for the reporting date.
- Estimate at Completion
- Forecast of total project cost, often budget at completion divided by the cost performance index when current efficiency is expected to continue. It is recalculated at each reporting period.
- To-Complete Performance Index
- Remaining budget divided by remaining work, computed as (BAC minus EV) divided by (BAC minus AC). Values above 1.0 require better efficiency than achieved to date.
- Critical Path Float
- Difference between late start and early start for an activity. Activities with zero total float lie on the critical path and delay the project completion if slipped.
- Management Reserve
- Funds held outside the approved cost baseline for unidentified scope and unforeseen risk. Release requires management approval and a formal baseline change.
- Time Impact Analysis
- Delay analysis inserting a fragnet representing changed work into the accepted schedule to measure the resulting completion shift. It supports entitlement to time extension.
- Liquidated Damages
- Pre-agreed amount per day of delay representing a genuine estimate of owner loss. Amounts structured as penalties unrelated to actual loss are generally unenforceable.