OBC Building Services flashcards
OBC Building Services ยท Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Building services scope
- The mechanical, electrical, plumbing, fire protection and vertical transport systems that make a building safe, comfortable and functional, plus the coordination needed among them.
- Occupancy classification
- The code category assigned to a building or portion based on its use, which sets egress, fire protection, ventilation and plumbing fixture requirements.
- Sensible heat ratio
- Sensible load divided by total load (sensible plus latent). The cooling coil must be selected to match the space ratio or humidity control will drift.
- Airflow sensible heat formula
- Cfm equals Btu per hour divided by 1.08 times the temperature difference. The constant 1.08 accounts for air density, specific heat and 60 minutes per hour.
- Equal friction duct sizing
- A duct design method that selects sizes so pressure loss per unit length is constant along the run, simplifying fan calculation and balancing.
- Static pressure per foot
- Water exerts about 0.433 psi per foot of vertical rise, so pump pressure must cover elevation plus friction losses in the piping.
- Fixture units
- A code-weighted value assigned to plumbing fixtures reflecting probable simultaneous demand, used to size water supply and drainage piping.
- Three-phase power formula
- Power in watts equals the square root of three times voltage times current times power factor for a balanced three-phase load.
- Voltage drop limits
- Common design targets cap branch circuit drop near 3 percent and total feeder plus branch near 5 percent to keep equipment voltage within tolerance.
- Ground fault circuit interrupter
- A device that trips when current leaks to ground, required in wet, outdoor and other specified locations to reduce electric shock hazard.
- Means of egress components
- Exit access, the exit itself, and exit discharge. Each component has its own width, travel distance and protection requirements under the code.
- Egress width calculation
- Required width equals occupant load multiplied by the code width factor per occupant, with stairways typically using a different factor than level corridors.
- Travel distance limit
- The maximum permitted distance from the most remote point to an exit, varying with occupancy and whether the building is sprinklered.
- Fire-resistance rating
- The time in hours a building assembly resists fire, applied to structure, shaft enclosures and separations between different occupancies.
- Sprinkler design density
- The water flow rate in gallons per minute per square foot applied over a defined remote area, selected according to the occupancy hazard classification.
- Standpipe system
- Piping with hose connections at specified locations that gives firefighters a pressurized water supply within the building during an incident.
- Stair pressurization
- A smoke control approach that supplies air to stairwells to maintain positive pressure and keep escape stairs free of smoke.
- Firefighter elevator service
- A control mode, activated by a key switch or alarm signal, that recalls elevators and allows trained use during a fire emergency.
- Elevator pit and overhead
- The pit depth, buffer space and overhead clearance required by elevator code so the car, counterweight and safety devices operate safely.
- Commissioning
- A documented quality process that verifies installed systems meet design intent through functional performance testing before acceptance and handover.
- As-built drawings
- Record documents showing actual installed locations and sizes of systems, used as the baseline for maintenance and future alterations.
- Concealed work inspection
- In-process code inspection of work that will be hidden by finishes, such as piping in walls or ductwork above ceilings, before it is covered.
- Heating load calculation
- A room-by-room estimate of heat loss through envelope surfaces plus infiltration and ventilation, used to size heating equipment.
- Cooling load calculation
- An estimate of sensible and latent heat gains from envelope, occupants, lighting and equipment at design conditions, used to size cooling equipment.
- Ventilation rate procedure
- A code method that sets minimum outdoor air per person and per floor area, adjusted for zone population and system ventilation efficiency.
- Duct velocity and noise
- Air speed limits in ducts and at diffusers control regenerated noise; main trunks commonly stay near 1,200 to 1,500 feet per minute.
- Domestic water recirculation
- A pumped or gravity loop that keeps hot water near fixtures, reducing wait time, water waste and scald risk at points of use.
- Panel schedule load balance
- Distribution of branch circuits across phases so that phase currents and neutral current stay within limits and breakers are not overloaded.
- Fire alarm sequence of operations
- The documented cause-and-effect matrix describing what happens when each initiating device activates, including recall, notification and suppression actions.
- Smoke compartmentation
- Dividing a building with smoke-resistant barriers and closures so smoke spread is limited, supporting both egress and firefighting operations.
- Mixed-use building services
- A building with multiple occupancy classifications must satisfy the most restrictive applicable requirements and provide required separations between uses.
- Equipment service clearance
- The code-required working space and access around mechanical and electrical equipment so it can be inspected, maintained and replaced safely.