OBC Plumbing All Buildings study materials
OBC Plumbing All Buildings study resources

OBC Plumbing All Buildings study plan

OBC Plumbing All Buildings · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Drainage Systems, Traps and Cleanouts & Venting Systems and Venting Methods

  • Map the drainage-system layout logic by tracing a fixture drain from trap to building drain and labeling every fitting type encountered

  • Distinguish between trap seal protection requirements and prohibited trap configurations by writing a two-column comparison

  • Identify the code conditions that require a cleanout and state the maximum spacing and size rules from memory

  • Classify each venting method by its allowable application and produce a one-page decision tree for selecting a vent type

Your checkpoint

A hand-drawn riser diagram of a two-bathroom house with every trap, cleanout, and vent labeled by type and code basis

Week 2

Drainage Systems, Traps and Cleanouts & Venting Systems and Venting Methods

  • Calculate fixture-unit loads for a sample multi-story building and verify drain and vent sizing against the applicable tables

  • Explain wet venting limits and common venting rules in writing without consulting notes

  • Diagnose five hypothetical venting defects and cite the specific corrective action for each

  • Compare stack venting, circuit venting, and island venting on cost, complexity, and code acceptance

Your checkpoint

A worked sizing packet for a three-story, six-unit building showing fixture units, drain sizes, and vent sizes with justifications

Week 3

Water Supply and Water Distribution Systems & Plumbing Fixtures, Fixture Fittings and Fixture Requirements

  • Size a water service and distribution system for a sample building using demand-load and pressure-loss methods

  • List the minimum fixture clearances, spacing, and installation height rules for the common fixtures

  • Identify backflow prevention devices and state where each is required

  • Match each fixture type to its required trap size, water supply connection, and vent requirement

Your checkpoint

A fixture schedule for a mixed-use building listing every fixture, its supply demand, trap size, and required clearances

Week 4

Water Supply and Water Distribution Systems & Health, Safety and Water Quality Requirements

  • Explain thermal expansion control and pressure-regulating valve requirements in a short written summary

  • Identify the cross-connection hazards in a commercial kitchen and specify the correct protection for each

  • State the water quality, disinfection, and testing requirements for potable water systems

  • Describe the material restrictions that apply to potable water piping and fittings

Your checkpoint

A cross-connection survey of a sample commercial kitchen with each hazard paired to a specific backflow protection device

Week 5

Plumbing Fixtures, Fixture Fittings and Fixture Requirements & Storm Drainage Systems

  • Compute roof drain sizing from rainfall intensity and roof area for three different building footprints

  • Distinguish primary, secondary, and overflow storm drainage requirements and when each is mandatory

  • Identify the code rules for indirect waste receptors, air gaps, and air breaks

  • Explain the trap primer and trap seal maintenance requirements for floor drains and special fixtures

Your checkpoint

A storm drainage calculation sheet for three roof areas showing rainfall intensity, drain count, leader sizing, and overflow provisions

Week 6

Special Plumbing Systems, Interceptors and Special Wastes & Plumbing Facilities for Persons with Disabilities and Barrier-Free Design

  • Classify each type of interceptor and separator by the waste stream it serves and its sizing basis

  • Design the grease interceptor sizing calculation for a sample restaurant and show the formula steps

  • List the accessibility requirements for plumbing fixtures including clear floor space, grab bar placement, and control location

  • Compare the accessibility rules for water closets, lavatories, and bathing fixtures in a side-by-side table

Your checkpoint

A restaurant special-waste plan showing grease interceptor sizing, venting, and location plus an accessible restroom layout checklist

Week 7

General Requirements, Definitions and Administration & Inspection, Testing, Maintenance and Certification Requirements

  • Summarize the permit, inspection, and approval sequence from application through final sign-off

  • State the testing procedures for drainage, water supply, and storm systems including pressures and durations

  • Identify the qualifications and responsibilities of the responsible managing employee or license holder

  • List the record-keeping and maintenance documentation requirements for special systems

Your checkpoint

A one-page inspection and testing checklist covering each system type with required test method and acceptance criteria

Week 8

General Requirements, Definitions and Administration & Plumbing Fixtures, Fixture Fittings and Fixture Requirements & Drainage Systems, Traps and Cleanouts & Venting Systems and Venting Methods & Water Supply and Water Distribution Systems & Special Plumbing Systems, Interceptors and Special Wastes & Health, Safety and Water Quality Requirements & Storm Drainage Systems & Plumbing Facilities for Persons with Disabilities and Barrier-Free Design & Inspection, Testing, Maintenance and Certification Requirements

  • Complete two full-length timed practice exams and score each by domain

  • Re-study the two weakest domains using targeted drills until accuracy exceeds 80 percent

  • Recite the key numeric thresholds for sizing, spacing, and testing from memory

  • Review every missed question and write the correct code principle behind each

Your checkpoint

A domain-by-domain score report from both practice exams with a written remediation log for every missed item

Milestones

Week 2: Score at least 75 percent on a 25-question drainage and venting drill without notes

Week 4: Correctly size a water distribution system and identify all backflow protections in a sample scenario with no reference errors

Week 6: Produce a complete special-waste and accessibility package that passes a self-review against a code checklist

Week 8: Achieve 80 percent or higher overall on two timed practice exams with no domain below 70 percent