Red Seal Agricultural Equipment Technician study materials
Red Seal Agricultural Equipment Technician study resources

Planter Section Control Overlap and Skip at Headlands

Red Seal Agricultural Equipment Technician · Put your knowledge to work in context.

All case studies

Planter Section Control Overlap and Skip at Headlands

A 24-row 60-foot planter is pulled by a 300 hp tractor equipped with RTK auto-steer and ISOBUS section control. The operator reports that at headlands and point rows the planter leaves 1.5 m gaps at the start and doubles seed population for about 2 m at the end of each pass. Population on the display is 34,000 seeds/acre target, but the seed monitor shows strips of 60,000. The seed meter calibration is correct, and vacuum is steady at 4.5 in H2O. The RTK correction age occasionally reaches 8 seconds, and the radio link has a 45% signal strength in one field corner. Section control is set to 2-second off delay and 0.5-second on delay. The machine is 60 ft wide, 24 rows at 30 in spacing, and operates at 5.5 mph. The customer wants to finish 800 acres before a forecast rain.

1. Calculate the distance travelled during the section delays and relate it to the observed overlap and gap.

Read the worked answer

At 5.5 mph, the planter travels 5.5 × 5,280 ÷ 3,600 = 8.07 ft/s, or about 2.46 m/s.

  • A 2-second off delay means the section stays on for 2 × 8.07 = 16.1 ft, or 4.9 m, after the command to shut off. That would produce up to 4.9 m of overlap if the valve and seed meter respond instantly at the end of the delay. The operator sees about 2 m of doubled population, which is less than the full calculated distance. That suggests the controller may already have some look-ahead, or the valve closes before the full delay expires, or the overlap is being measured only where the population monitor is sensitive enough to show it.
  • A 0.5-second on delay means the section starts 0.5 × 8.07 = 4.0 ft, or 1.2 m, after the command to turn on. The observed gap is about 1.5 m, so the on-delay accounts for most of the skip. The extra 0.3 m could come from GPS latency, valve response, or the seed meter filling time.
  • RTK correction age of 8 seconds is not the same as an 8-second position lag, but it does mean the correction is stale. At 8.07 ft/s, 8 seconds of travel is 64.5 ft, so if the receiver were simply extrapolating a stale correction, the position error could be large. RTK systems usually hold the last correction and degrade gracefully, but 8 seconds is long enough to reduce accuracy at headlands.

The observed 2 m overlap and 1.5 m gap are consistent with the delay settings plus some latency, not with a meter calibration error.

2. How would you determine whether the remaining error is GPS latency, controller processing, or valve response?

Read the worked answer

I would separate the system into command, position, and mechanical response.

  1. Check the RTK correction age and signal strength in the corner. If the age reaches 8 seconds and the radio strength is 45%, the position solution is suspect. I would record the correction age while the planter is working and compare it with the overlap pattern. If the overlap occurs only in the low-signal corner, radio coverage is a major contributor.
  2. Use a static repeatability test: park the planter, mark a point, and watch the guidance position for several minutes. A drifting position with a steady correction age points to the receiver or base station, not the section valves.
  3. Command a single section on and off manually at a known ground speed and measure the distance from the command to the seed drop. This isolates controller and valve response from GPS. If the measured distance matches the 2-second off delay, the controller is doing what it is told; if it is longer, valve or meter response is slow.
  4. Use the ISOBUS diagnostics or a scope to check the section command signal and the valve current. A valve that is slow to close will show a decaying current or a delayed pressure response.
  5. Compare the seed monitor population strips with the as-applied map. If the double population is behind the actual section boundary, the delay is in the mechanical response; if it is ahead, the controller or GPS is predicting the boundary incorrectly.

I would not change the delay settings until I knew which of these three is dominant.

3. What settings and operational changes would you make, and would you release the planter for the 800 acres?

Read the worked answer

I would first improve the RTK signal, because an 8-second correction age is not acceptable for accurate section control at 5.5 mph. Raising the radio antenna, adding a repeater, or moving the base station to improve line-of-sight in the weak corner is a priority. If the age can be held below 2 seconds, the position error shrinks and the delay settings become meaningful.

Then I would tune the section delays using the measured response:

  • Reduce the off delay from 2 seconds to about 0.8 second to target roughly 2 m of overlap at 5.5 mph, then verify with a seed drop test.
  • Increase the on delay from 0.5 second to about 0.6 second if the measured gap is still 1.5 m, or leave it if the valve response accounts for the difference.
  • Enable any look-ahead or boundary compensation the display offers, and calibrate the section valve response if the controller supports it.
  • Slow down at headlands and point rows; at 4.5 mph the same delay covers less ground.

I would release the planter only after a test pass in the weak-signal corner shows the gap and overlap are within the customer's tolerance, and after documenting the correction age. If the RTK signal cannot be stabilized, I would tell the customer that section control will not be accurate in that corner and recommend manual control or a different pass pattern. The 800-acre deadline is not a reason to plant with an 8-second correction age and uncorrected delays.