Red Seal Boilermaker study materials
Red Seal Boilermaker study resources

Red Seal Boilermaker: Welding and Joining Processes

Red Seal Boilermaker · Work through your exam, one topic at a time.

All guide sections

Welding and Joining Processes

Process selection on the job

  • SMAW with E7018 remains the workhorse: 70 = 70 ksi minimum tensile, 1 = all positions, 8 = low-hydrogen iron-powder coating, usable on AC or DCEP.
  • FCAW and GMAW give higher deposition for long seams; GTAW for stainless and small-bore roots; SAW for straight longitudinal and circumferential seams; stud welding for waterwall and shear studs.
  • Polarity and amperage come from the WPS. Never substitute a rod because it happens to be in the oven.

Qualification chain

WPS → PQR → welder performance qualification, under ASME Section IX, CSA W47.1 or CSA W59 as the contract requires. Welder qualification is specific to process, position and often joint type and thickness range. A welder qualified for flat GMAW is not qualified for vertical-up SMAW.

Preheat, interpass and heat input

  • Preheat slows cooling so hydrogen escapes and hard martensite does not form; it is set by material, thickness and code.
  • Interpass temperature has an upper limit as well as a lower one: excess heat input coarsens the heat-affected zone and drops toughness.
  • Heat input: HI (kJ/mm) = (V × A × 60) ÷ (1000 × travel speed in mm/min).

Worked example: heat input

25 V, 200 A, 250 mm/min travel. HI = (25 × 200 × 60) ÷ (1000 × 250) = 300 000 ÷ 250 000 = 1.2 kJ/mm. If the welder slows to 150 mm/min, HI rises to 2.0 kJ/mm - a 67% increase from identical settings. That alone can push the work outside its qualified range.

Traps that cost marks

  • Reading E7018 as a position code rather than a tensile and coating designation.
  • Leaving low-hydrogen electrodes in an open can or skipping the rebake the manufacturer requires.
  • Arc strikes and careless tacks outside the joint: stress raisers that must be ground out and inspected.
  • Assuming a qualified welder is automatically qualified for the procedure - each is qualified separately.