Red Seal Boilermaker · Give each week a clear focus.
8 weeks · About 7 hours per week
Occupational Skills and Safety & Layout and Pattern Development
List the ten highest-frequency hazard classes in boiler shop and field work (confined space, hot work, suspended loads, stored energy, silica and fume exposure, pinch points, hand and power tool hazards, arc flash, hydrostatic test energy, working at height) and write the control measure you would apply to each
Walk through the lockout/tagout and confined-space entry sequence for a vessel repair step by step, naming who authorizes, who tests atmosphere, who attends, and what triggers an evacuation
Demonstrate the parallel line and perpendicular bisector constructions on paper with dividers and trammel points, then explain how each is used to establish a true centerline on a plate
Compute circumference, chord length, and arc length from a given diameter and included angle without a reference sheet, showing each formula you used
Your checkpoint
A one-page hazard-to-control matrix covering at least ten hazard classes plus a worked sheet of five layout calculations (chord, arc, circumference, bisector, parallel offset) with all arithmetic shown
Layout and Pattern Development & Cutting, Forming, and Fabrication
Develop a full flat pattern for a truncated cone and for a square-to-round transition using radial line and triangulation methods, labeling every station line and true-length line
Calculate bend allowance, setback, and bend deduction for 90-degree and non-90-degree bends in 10 mm and 6 mm plate, then verify against a physical test bend
Lay out and cut a hole pattern on scrap plate using dividers, a trammel, and a center punch, checking square and center-to-center distances with a tape and a square
Identify the correct allowance for a rolled cylinder seam and explain how plate thickness and rolling direction change the finished diameter
Your checkpoint
Two dimensioned flat pattern drawings (truncated cone and square-to-round) with development lines, true lengths, and a bend allowance calculation sheet that matches a verified test bend within 2 mm
Cutting, Forming, and Fabrication & Welding and Joining Processes
Describe the setup and operating limits of plate rolls, press brake, and ironworker, and state the safety interlock and pinch-point checks before each is energized
Explain the effect of heat input, preheat, interpass temperature, and cooling rate on distortion and hardness in carbon steel and low-alloy steel, and state when preheat is required
Match the SMAW electrode classification (E7018, E6010, E6013, E11018) to its intended service, position capability, and storage or reconditioning requirement
Set up a root pass, hot pass, fill, and cap sequence for a groove weld on plate and state the defect each pass is most likely to produce if run wrong
Your checkpoint
A forming-and-welding process card for one job: material, thickness, preheat and interpass limits, electrode selection and storage, pass sequence, and the distortion control method, with each choice justified in one sentence
Welding and Joining Processes & Rigging, Hoisting, and Load Handling
Calculate weld metal volume and deposition rate for a given joint, then convert to arc time and total labor hours using an operating factor
Identify weld discontinuities from written descriptions (porosity, slag inclusion, lack of fusion, undercut, crater crack, lamellar tear) and state the process or handling cause and the correction
Compute the tension in each sling leg for a two-leg and four-leg bridle at a stated included angle, and state the capacity loss at 60, 90, and 120 degrees
Select shackles, hooks, and slings for a given load with the correct working load limit derating, and identify the inspection rejection criteria for each
Your checkpoint
A rigging and welding calculation package: one weld deposition and arc-time estimate, one four-leg sling tension calculation with a sketch, and a written rejection list for slings, shackles, and hooks
Rigging, Hoisting, and Load Handling & Pressure Vessels, Tanks, and Boilers
Plan a lift from scratch: determine load weight including rigging, locate the center of gravity, choose the hitch, verify crane capacity at radius, and list the exclusion zone and tagline plan
Explain the difference between a fired pressure vessel, unfired pressure vessel, and a power boiler in terms of code jurisdiction, inspection interval, and the fittings each must carry
Trace the water and steam path through a firetube and a watertube boiler and state the failure mode each design is prone to (overheating from low water, tube sheet cracking, caustic embrittlement, scale)
Identify the safety valve, relief valve, gauge glass, low-water cutoff, and try-cock functions and state the test each receives
Your checkpoint
A lift plan for one real or realistic load with weight, center of gravity, hitch, capacity check at radius, and exclusion zone, plus a labeled boiler component diagram naming at least eight fittings with their function and test
Pressure Vessels, Tanks, and Boilers & Structural Steel and Platework
Compute the required thickness of a cylindrical shell and a hemispherical head for given design pressure, allowable stress, joint efficiency, and corrosion allowance, and state the formula basis for each
Explain postweld heat treatment: when it is required by thickness and material, how temperature is measured and controlled, and what happens if the soak or cooling rate is wrong
Lay out and fit a beam-to-column connection and a stiffener plate using a tape, square, and level, and state the tolerance for square, plumb, and camber
Identify the structural shapes (W, S, C, HSS, angle, channel) and state how each is oriented for strong-axis bending and how holes are located from a gauge line
Your checkpoint
A pressure vessel shell and head thickness calculation with all inputs cited, plus a structural fit-up checklist covering at least eight tolerance and alignment checks for a beam-to-column connection
Structural Steel and Platework & Piping, Tanks, and Industrial Systems
Describe the sequence for erecting a structural bay: anchor bolts, column plumb, beam fit, temporary bracing, final bolt torque, and when temporary bracing may be removed
Explain pipe schedule, nominal size versus actual outside diameter, and how to select the correct flange rating, gasket, and bolt grade for a given service
Trace a piping system from source to use and identify where expansion loops, guides, anchors, and supports belong and why
State the alignment tolerances for a flange joint and the bolt tightening sequence for a four-bolt and an eight-bolt flange
Your checkpoint
A piping and structural package: a labeled isometric-style sketch of one system showing supports, anchors, and expansion provision, plus a flange make-up procedure with bolt sequence and torque values
Inspection, Testing, and Quality Control & Occupational Skills and Safety
Explain radiographic, ultrasonic, magnetic particle, dye penetrant, and visual testing in terms of what each detects, its limitations, and when each is specified
Describe a hydrostatic test: fill, vent, pressurize in steps, hold time, temperature requirement, inspection points, and the safe distance and barricade rule
Build a quality control hold-point list for a vessel job from material receiving through final test, naming the record produced at each hold point
Rehearse the safety and code content of the two heaviest domains under timed conditions and correct every missed item with a written explanation
Your checkpoint
A one-page hold-point and inspection plan for a vessel job covering material identification, fit-up, weld inspection method per joint, hydrostatic test, and final documentation, plus a corrected list of every missed item from the timed rehearsal
Milestones
Week 2: You can develop a truncated cone and a square-to-round pattern unaided and your bend allowance prediction matches a physical test bend within 2 mm
Week 4: You can compute sling leg tension at any included angle and estimate weld arc time from joint volume and deposition rate without notes, scoring at least 80 percent on a self-made 20-question set
Week 6: You can state the shell and head thickness formulas from memory, cite each input correctly, and list at least eight structural fit-up tolerances
Week 8: You score at least 80 percent on a full timed mixed-domain rehearsal and can explain every missed item in writing without referring back to the source