Red Seal Concrete Finisher flashcards
Red Seal Concrete Finisher · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Silica exposure limit
- The permissible exposure limit for respirable crystalline silica is often 0.025 mg/m³ over an 8-hour shift; wet cutting and dust collection are required to stay below this.
- Concrete burn first aid
- Wet cement is alkaline and can cause severe burns; immediately wash affected skin with clean water, remove contaminated clothing, and seek medical attention for persistent irritation.
- Trench shoring threshold
- Trenches deeper than 1.2 m (4 ft) generally require shoring, sloping, or a trench box; spoil piles must be kept at least 1 m (3 ft) from the edge.
- Washout water disposal
- Concrete washout water must be contained in a designated pit or tank and never discharged to storm drains; neutralize pH before disposal according to local sewer bylaws.
- Vibrator head selection
- Choose a vibrator head diameter of 25–40 mm for thin walls and 50–75 mm for mass concrete; frequency should be 10,000–15,000 vpm, and never use it to move concrete laterally.
- Bull float purpose
- A bull float is used immediately after screeding to open the concrete surface, embed aggregate, and remove high spots; keep the tool flat and avoid overworking the surface.
- Groover depth rule
- Control joints should be cut to a depth of at least 1/4 of the slab thickness, with a minimum of 25 mm, to ensure cracking occurs at the joint.
- Power trowel blade pitch
- Adjust blade pitch from flat for floating to angled for burnishing; increased pitch and speed produce a denser, smoother finish but can cause delamination if overdone.
- Subgrade compaction tolerance
- Slab subgrade should be compacted to typically 95% Standard Proctor density and finished to ±10 mm (3/8 in) tolerance; proof-roll to detect soft spots.
- Control joint spacing
- Space control joints at 24–36 times the slab thickness (e.g., 100 mm slab → 2.4–3.6 m); keep panel aspect ratio ≤1.5:1 and align joints with re-entrant corners.
- Vapor barrier thickness
- Under interior slabs, use 10–15 mil (0.25–0.38 mm) polyethylene vapor barrier; lap joints 150 mm and tape; seal all penetrations to prevent moisture migration.
- Formwork lateral pressure formula
- For normal concrete, lateral pressure can be estimated as p = 72 + 7800R/(T+18) kPa, where R is pour rate (m/h) and T is concrete temperature (°C); use ACI 347 for design.
- Form removal timing
- Side forms can typically be removed after 24–48 hours when concrete can resist damage; soffit forms and shores must remain until concrete reaches design strength, often 70–100% of f'c.
- Form tie spacing
- Form ties are typically spaced 600–900 mm (2–3 ft) on center both horizontally and vertically, depending on lateral pressure; ensure ties are tight and washers are in place.
- Rebar size 15M area
- A 15M metric rebar has a nominal diameter of 15 mm and a cross-sectional area of 200 mm²; it is roughly equivalent to a #5 imperial bar (area 200 mm²).
- Typical slab cover
- For slabs on grade not exposed to weather, typical concrete cover over reinforcement is 20 mm (3/4 in); increase to 40–50 mm for surfaces exposed to earth or weather.
- Tension lap splice length
- For Grade 420 (60 ksi) rebar in normal-weight concrete, tension lap splices are often 40 bar diameters; stagger laps and verify with CSA A23.3 or ACI 318.
- Vibrator insertion spacing
- Insert the vibrator vertically at spacing not exceeding 1.5 times its radius of action (typically 400–600 mm), and penetrate the previous layer by 100–150 mm.
- Concrete free-fall limit
- To prevent segregation, limit free fall of concrete to 1.5 m (5 ft) unless using a chute or tremie; place in horizontal layers of 300–500 mm.
- Hot weather placement limit
- Avoid placing concrete when ambient temperature exceeds 30°C (86°F) if possible; use chilled water or ice, and cure immediately to prevent plastic shrinkage cracking.
- Cold weather protection
- Maintain concrete temperature above 5°C (40°F) during placement and curing; use heated enclosures or insulated blankets, and never place concrete on frozen subgrade.
- Curing duration
- Cure normal Portland cement concrete for at least 7 days; use 3 days for high-early strength cement; extend to 14 days for cold weather or blended cements per project specifications.
- Curing compound application
- Apply liquid membrane-forming curing compound immediately after finishing when the surface is no longer glossy, usually within 30 minutes; follow manufacturer coverage rate, often 5 m²/L.
- Plastic sheeting curing
- Cover concrete with 0.1 mm (4 mil) polyethylene sheeting, overlap edges and seal with tape; secure against wind and avoid wrinkles that can puddle water.
- Exposed aggregate process
- Apply surface retarder after screeding; after concrete sets (4–24 hours), scrub with a brush and water to remove mortar and expose aggregate; keep aggregate size and color consistent.
- Polished concrete grit sequence
- Use progressively finer diamond abrasives (e.g., 30, 50, 100, 200, 400, 800, 1500 grit); apply densifier between passes and finish with a high-speed burnisher for gloss.
- Acid stain neutralization
- After applying acid stain to cured concrete, neutralize the acid with an ammonia solution, then rinse and allow to dry before applying a sealer.
- Sealer types
- Film-forming sealers (acrylic, polyurethane) form a surface coating and can be slippery when wet; penetrating sealers (silane, siloxane) soak in and are breathable; choose per exposure.
- Epoxy crack injection
- Inject epoxy into structural cracks wider than 0.3 mm to restore strength; clean crack with compressed air, seal surface, and inject under pressure until epoxy exits adjacent ports.
- Spall repair procedure
- Remove loose concrete to sound substrate, chip edges to 25 mm depth, clean, apply bonding agent, place repair material with similar thermal expansion, and cure properly.
- Hydrodemolition pressure
- Hydrodemolition uses high-pressure water (up to 300 MPa) to remove deteriorated concrete without damaging rebar; contain and treat runoff water.
- Surface profile CSP
- Abrasive blasting achieves a Concrete Surface Profile (CSP) typically CSP 3–6 for coatings; verify with replica tape and clean dust before applying repair material.