Red Seal Drywall Finisher & Plasterer flashcards
Red Seal Drywall Finisher & Plasterer · Build recall with a focused review session.
36 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Silica exposure limit
- US OSHA 29 CFR 1926.1153 sets an 8-hour TWA permissible exposure limit of 50 µg/m³ for respirable crystalline silica; Table 1 tasks specify engineering controls in place of air monitoring.
- Hierarchy of controls
- Ordered from most to least effective: elimination, substitution, engineering controls, administrative controls, and personal protective equipment. PPE is the last line of defence, not the first.
- Lead paint presumption
- Housing and child-occupied facilities built before 1978 are presumed to contain lead paint; any disturbance triggers lead-safe work practices, containment, and cleaning verification.
- Fall protection threshold
- In general construction, fall protection is required at 3 m (10 ft) or more above a lower level; scaffolds, ladders, and openings have their own specific requirements.
- Setting compound set times
- Setting-type joint compounds are labelled 20, 45, 90, or 210 minutes. They cure chemically rather than by drying, cannot be retempered after set, and shrink less than drying compounds.
- Self-furring metal lath
- Metal lath with dimples or ribs that hold the mesh away from the sheathing, creating a key space so plaster can wrap behind the mesh and lock into place.
- Corner bead types
- Nail-on, screw-on, paper-faced with laminated flanges, and bullnose. Paper-faced bead is preferred for straight corners because it resists cracking better than metal alone.
- Screw spacing on ceilings
- Single-layer board on ceilings uses screws at 300 mm (12 in) on center; fire-rated and water-resistant ceiling assemblies typically require 200 mm (8 in) on center.
- Figured versus scaled dimensions
- Written dimensions govern over measurements scaled from a drawing. Specifications and addenda generally govern over drawings, and large-scale details govern over small-scale plans.
- Fire-resistance rating
- A tested assembly rating in hours, such as 1 h or 2 h. Board type and thickness, fastener spacing, and joint treatment are all part of the tested system and cannot be substituted freely.
- 3-4-5 squaring method
- A triangle with sides in the ratio 3:4:5 has a right angle between the two shorter sides. Used to square a room or establish perpendicular layout lines.
- Finish level 5
- A skim coat is applied over the entire gypsum board surface. Specified where gloss or semi-gloss paint and critical lighting will reveal joints, fasteners, and texture differences.
- Framing tolerance for board
- Studs should not deviate more than about 3 mm (1/8 in) from the plane of adjacent studs. Excess variation is shimmed or sistered before boarding to avoid wavy walls.
- Backing at board edges
- All unsupported board edges, including corners, ceiling perimeters, and opening jambs, require blocking or framing installed before the board is hung.
- Substrate moisture content
- Wood framing should be at or below 19% moisture content before boarding. Concrete and masonry must be dry and free of form release agents before plaster or adhesive.
- Vapour barrier placement
- In cold climates the vapour barrier goes on the warm side of the insulation. In mixed climates a vapour-retarder paint may substitute to allow some drying.
- Screw penetration depth
- Screws must penetrate wood framing at least 16 mm (5/8 in) or pass at least 10 mm (3/8 in) beyond a metal stud flange, with heads dimpled but not torn through.
- Staggered board joints
- Joints on opposite sides of a partition are offset from each other, and end joints are staggered between courses, to reduce cracking and improve fire and acoustic performance.
- Water-resistant board limits
- Water-resistant gypsum board suits tub and shower surrounds but is not a waterproof membrane. Shower pans, steam rooms, and wet floors require a separate waterproofing system.
- Tape embedding
- Paper tape is embedded in a thin bed of compound and excess is squeezed out. Bubbles and blisters must be cut out and re-taped rather than coated over.
- Coat widening rule
- Each successive joint compound coat extends about 50 mm (2 in) per side beyond the previous coat, producing a feathered edge that blends into the board surface.
- Sanding between coats
- Sand lightly between coats and remove dust. Over-sanding fuzzes the paper and exposes tape edges, which show as a halo under paint.
- Raking light inspection
- Inspecting finished joints under a light held at a shallow angle to the surface reveals ridges and hollows that are invisible under direct lighting.
- Three-coat plaster sequence
- Scratch coat, brown coat, and finish coat. The scratch coat is scored to key the brown coat, and the brown coat is floated to establish the plane.
- Grounds and screeds
- Wood or metal strips set at corners, openings, and floor lines to establish plaster thickness and plane. They act as guides for the straightedge and float.
- Stucco curing
- Portland cement stucco must be kept damp for at least 48 hours after each coat and protected from freezing. Rapid drying causes shrinkage cracking and weakens the coat.
- Metal lath lapping
- Lath laps at least 13 mm (1/2 in) at sides and 25 mm (1 in) at ends, fastened about 150 mm (6 in) on center. Correct lapping prevents cracks along seams.
- Veneer plaster
- A thin 2–3 mm (1/16–1/8 in) gypsum finish applied over a special base board. It cures hard and produces a monolithic surface with fewer joints than taped board.
- Knockdown texture
- Thinned joint compound is sprayed or rolled on, allowed to set partially, then flattened with a trowel. The result is a mottled, low-profile texture that hides surface imperfections.
- Crown moulding spring angle
- The angle between the back of the moulding and the wall, commonly 38° and 52°. It determines the mitre and bevel settings; a wrong setting produces open joints.
- Weep screed clearance
- A weep screed at the base of stucco provides drainage and must sit at least 100 mm (4 in) above grade or 50 mm (2 in) above paved surfaces.
- Weather-resistive barrier laps
- Building paper or house wrap is lapped at least 50 mm (2 in) and shingled so water drains outward and downward. Flashing must integrate with the barrier.
- Stucco control joints
- Control joints are spaced no more than about 3 m (10 ft) in each direction and are placed at changes in substrate, at opening corners, and at floor lines.
- Plaster washers
- Perforated washers screwed through existing plaster into framing to reattach areas that have lost their key, allowing repair without full removal of the plaster.
- Lime versus gypsum plaster
- Lime plaster is softer and more vapour-permeable than gypsum. Repairs on historic lime plaster should use compatible lime-based material to avoid trapping moisture.
- Stain-blocking primer
- Shellac or oil-based primer seals water stains and smoke odour before recoating. Water-based primers may not seal tannin or smoke odour adequately.