Floorcovering Installer (Red Seal) flashcards
Floorcovering Installer (Red Seal) · Build recall with a focused review session.
34 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Hearing conservation threshold
- An 8-hour exposure at or above 85 dBA requires a hearing conservation program; each 3 dB increase halves the permitted exposure time.
- Respirable crystalline silica
- Dust from cutting concrete or tile; wet cutting or dust extraction plus an N95 respirator is required, and the OSHA PEL is 50 µg/m³ as an 8-hour TWA.
- Asbestos in flooring
- Pre-1990 vinyl sheet, vinyl asbestos tile, and mastic may contain asbestos; test before sanding or demolition and stop work if suspect material is disturbed.
- Ladder angle rule
- Set ladders at a 4:1 angle, maintain three-point contact, and never stand on the top two rungs; fall protection is required at 3 m in construction.
- Calcium chloride test
- Measures moisture vapor emission rate in lb/1000 ft²/24 h from a concrete slab; it is not the same as an in-situ relative humidity probe.
- Trowel notch and coverage
- A 1/16 in square notch spreads about 30-35 ft²/gal, while a 1/4 in × 3/8 in notch spreads about 60-70 ft²/gal for large-format tile.
- Power stretcher
- Reaches the 1-2 % stretch required for most carpet; a knee kicker is for positioning and stairs only and cannot achieve the required tension.
- Adhesive open time
- The window after spreading before the adhesive skins over; adhesive that has skinned must be removed and re-spread, not wetted.
- Subfloor flatness tolerance
- The standard is 3 mm in 3 m (1/8 in in 10 ft) for most resilient and tile products, checked with a 3 m straightedge.
- Concrete cure period
- Standard concrete needs 28 days before moisture testing; lightweight or fast-track concrete needs manufacturer-specific testing before covering.
- 3-4-5 squaring method
- A triangle with sides in a 3:4:5 ratio establishes a right angle; use it to set centerlines and verify border widths at opposite walls.
- Tile deflection requirement
- Ceramic tile requires L/360 or stiffer and stone requires L/720; check joist span tables before installing stone.
- Perimeter expansion gap
- Leave 6-10 mm (1/4-3/8 in) at walls and at every 6-9 m in large fields for tile and laminate; cover with baseboard or shoe molding.
- In-situ RH probe
- Measures relative humidity inside a concrete slab; typical limits are 75-80 % for resilient and 65 % for wood products.
- Uncoupling membrane
- Isolates tile from slab movement; a crack-isolation membrane bridges existing cracks up to about 3 mm (1/8 in) wide.
- Thin-set selection
- Modified thin-set for plywood and most tile, unmodified for some large-format porcelain over membranes, and epoxy for food service and chemical exposure.
- Primer purpose
- Applied to porous or dusty slabs before patching or adhesive; without it the adhesive may fail or flash off too fast.
- Heat-welded vinyl seam
- Standard for commercial sheet vinyl; residential and some vinyl composition tile use a chemical weld or seam sealer instead.
- VCT quarter-turn pattern
- A basket-weave layout for vinyl composition tile; the pattern must be established before spreading adhesive so the field stays aligned.
- LVP floating installation
- Click-system luxury vinyl plank is not glued down; it needs a 6-10 mm expansion gap at walls and a level subfloor.
- Roller weight for sheet goods
- A 100 lb roller passes over the field and seams after sheet vinyl installation to remove trapped air and set the adhesive.
- Tackless strip placement
- Pins angle toward the wall, with a gap equal to the carpet thickness plus about 6 mm (1/4 in) from the wall.
- Carpet seam placement
- Cut seams along the carpet grain and place them away from high-traffic areas and out of direct light to reduce visible wear.
- Carpet tile pattern
- Installed in a quarter-turn or monolithic pattern with consistent direction, then rolled with a 75-100 lb roller.
- Carpet pad selection
- Use a pad rated for the carpet and traffic; a pad that is too thick or too soft shortens carpet life and voids some warranties.
- Hardwood acclimation
- Solid hardwood typically needs 3-7 days in the room at 18-24 °C and 35-55 % RH; engineered and laminate may need 24-48 hours.
- Blind nailing hardwood
- Fasteners go through the tongue at a 45° angle, spaced about 200-300 mm (8-12 in) and closer at board ends.
- Wood moisture content match
- Wood subfloor moisture content should be within 2-4 % of the flooring; concrete slabs need a vapor barrier and a moisture test.
- Laminate end-joint stagger
- Floating laminate planks are clicked together and staggered at least 200 mm (8 in) at end joints to distribute load.
- Thin-set slake time
- Mix to the manufacturer's water ratio, let it slake for 10 minutes, then remix; pot life is typically 2-4 hours.
- Mortar coverage minimum
- Achieve at least 80 % mortar coverage in dry areas and 95 % in wet areas; back-butter large-format tile.
- Tile lippage limits
- Allowable lippage is typically 1 mm (1/32 in) for stone and 1.5 mm (1/16 in) for ceramic, measured with a straightedge.
- Grout curing and sealing
- Do not grout until thin-set has cured, typically 24 hours; seal grout after it cures, typically 72 hours, with a penetrating sealer.
- Transition molding fastening
- Reducers, T-moldings, and thresholds must be fastened to the subfloor, not through the floating floor, at floor height changes.