Red Seal Ironworker (Generalist) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Common occupational skills, drawings, and layout

  • Match current revisions, piece marks, datums, grids, and offsets.

  • Practice unit conversion, interval counting, area, volume, and diagonal calculations.

Your checkpoint

A checked layout worksheet identifying every reference and unit.

Week 2

Rigging, hoisting, positioning, and cranes

  • Calculate stated static shares and sling-angle tensions.

  • Review hardware configuration, inspection, communication, and landing controls.

Your checkpoint

A rigging review that separates calculation from equipment rating and lift authorization.

Week 3

Rigging, hoisting, positioning, and cranes

  • Use the actual configuration and defined chart deductions.

  • Check operating radius, effective bearing area, underground conditions, and blind-lift communication.

Your checkpoint

A lift-planning checklist with a worked gross-load and bearing-pressure example.

Week 4

Fabrication and placement of reinforcing materials

  • Interpret bar marks, materials, cover, spacing, laps, and cut quantities.

  • Review supports, couplers, coatings, openings, and cage stability.

Your checkpoint

A placement inspection sheet and independently checked quantity takeoff.

Week 5

Prestressing and post-tensioning

  • Compare pretensioning, bonded systems, and unbonded protection.

  • Check readiness, calibration, force/elongation, sequence, grouting, and stored energy.

Your checkpoint

A stressing-discrepancy review using measured data rather than guessed acceptance.

Week 6

Structural, ornamental, and equipment installation

  • Distinguish snug-tight, pretensioned, and slip-critical requirements.

  • Review fit-up, WPS variables, defects, bracing, bridging, and load transfer.

Your checkpoint

A connection hold-point checklist covering both bolts and welds.

Week 7

Structural, ornamental, and equipment installation

  • Review bearing pads, movement joints, timber connectors, anchors, soft foot, and alignment.

  • Practice stated stair, weld, and thermal-movement calculations.

Your checkpoint

A system comparison showing which installation checks serve support, movement, or durability.

Week 8

Maintenance, repair, upgrading, and dismantling

  • Analyze retained load paths and temporary support through removal stages.

  • Review corrosion measurement, recurring defects, isolation, inspection, and as-built closeout.

Your checkpoint

A mixed practice error log and an authorized-repair sequence for a worked case.

Milestones

Week 4: Complete drawing, rigging, and reinforcing calculations with units and independent arithmetic checks.

Week 8: Explain connection, prestressing, and dismantling choices using system requirements rather than answer-position memory.