Red Seal Landscape Horticulturist study plan
Red Seal Landscape Horticulturist · Give each week a clear focus.
8 weeks · About 7 hours per week
Soil, Growing Media, and Plant Nutrition & Maintenance and Cultural Practices
List the components of soil (mineral particles, organic matter, pore space, soil water, soil air, organisms) and state the approximate volume fraction of each in a productive loam
Classify a soil sample by hand texturing into sand, sandy loam, loam, clay loam, or clay, and record the field-observed drainage class and depth to any restricting layer
Convert a soil test report (pH, organic matter %, P, K, Mg, Ca, CEC) into a written interpretation naming the two most limiting factors for turf or shrub growth
Explain how cation exchange capacity and pH interact to affect phosphorus and micronutrient availability, using iron chlorosis at high pH as the worked example
Describe the difference between soluble, slow-release, and controlled-release nitrogen sources and state one landscape situation where each is appropriate
Your checkpoint
A one-page soil profile and fertility summary for a real or described site, including hand-texture class, drainage class, pH, CEC, and two prioritized amendment or fertilizer recommendations with rates and rationale
Maintenance and Cultural Practices & Soil, Growing Media, and Plant Nutrition
Calculate the amount of amendment needed to raise organic matter in a planting bed of stated area and depth, showing unit conversions
Identify the primary, secondary, and micronutrient deficiency symptoms in common landscape plants and match each symptom to a corrective strategy
Sequence the annual maintenance calendar for a mixed shrub and perennial border, ordering tasks by season and justifying each timing decision
Explain how to take a representative soil sample (depth, number of subsamples, sampling pattern, tools) and describe three errors that invalidate a sample
Distinguish between fertilizer burn, salt accumulation, and true nutrient deficiency from described symptom patterns and site history
Your checkpoint
A completed amendment calculation worksheet plus a 12-month maintenance calendar for one planting bed, with each task tied to a plant or soil reason
Plant Identification, Selection, and Use & Planting and Installation
Identify 40 landscape trees, shrubs, and perennials by their Latin binomial, common name, and one diagnostic feature (bark, bud, leaf arrangement, or fruit)
Group the identified plants by light, moisture, and soil pH requirements and flag any that are invasive or problematic in the local region
Explain the correct planting procedure for containerized, balled-and-burlapped, and bare-root stock, including root flare depth and staking decisions
Describe proper handling and storage of nursery stock from delivery to installation, including protection of roots and timing of planting windows
Select plants for a described site (exposure, soil, mature size, function) and justify each choice against the site constraints
Your checkpoint
A 40-plant identification log with Latin name, common name, diagnostic feature, and cultural requirement, plus a written planting specification for one tree covering hole dimensions, depth, backfill, mulch, and staking
Plant Identification, Selection, and Use & Planting and Installation & Soil, Growing Media, and Plant Nutrition
Produce a planting plan for a described site that specifies spacing based on mature spread and accounts for soil preparation and drainage
Explain the establishment-year water requirement for newly installed trees and shrubs and describe how to monitor and adjust irrigation
Diagnose three described transplant failures (girdling roots, planted too deep, drought stress) and state the corrective action for each
Describe soil volume and quality requirements for raised beds and planters, including drainage and weight considerations for rooftop or balcony installations
Explain how to amend backfill correctly and refute the practice of heavily amending only the planting hole
Your checkpoint
A site-specific planting plan with a plant schedule, spacing rationale, soil preparation notes, and a first-season watering schedule
Plant Health and Integrated Pest Management & Maintenance and Cultural Practices
Describe the integrated pest management decision sequence from monitoring and identification through threshold, treatment selection, and evaluation
Identify 15 common landscape pests and diseases by host plant, damage symptom, and life stage, and name one cultural, one biological, and one chemical control for each
Explain pesticide label elements (signal word, PPE, re-entry interval, pre-harvest interval, rate, target pest) and how to read a label before application
Calculate a pesticide mix rate and sprayer volume for a stated area and demonstrate correct calibration arithmetic
Describe the environmental and legal constraints on pesticide use near water, on windy days, and around pollinators
Your checkpoint
A pest and disease reference table for 15 organisms with host, symptom, life cycle timing, and a three-tier control plan, plus a completed sprayer calibration calculation
Occupational Skills and Safety & Tools and Equipment
Identify the required PPE for each major landscape task and state the applicable regulation or standard behind it
Describe the safe operating procedure for a chainsaw, string trimmer, and walk-behind mower, including kickback causes and the correct stance
Explain lockout, pre-use inspection, and the reporting chain for a damaged tool or equipment defect
Describe safe trenching and excavation practices near buried utilities, including the locate request process and hand-exposure requirements
Demonstrate the correct use and maintenance of hand tools (pruning saw, loppers, spade, rake) and identify the sharpening or replacement criteria for each
Your checkpoint
A job hazard analysis for one landscape task listing hazards, controls, required PPE, and emergency response, plus a written pre-use inspection checklist for three pieces of equipment
Site Assessment and Planning & Hardscape and Landscape Construction
Conduct a site inventory covering topography, drainage patterns, sun and wind exposure, existing vegetation, utilities, and access, and record findings in a standard format
Interpret a grading plan and calculate slope, cut and fill volumes, and the finished grade for a described site
Explain the construction sequence for a paver patio and a segmental retaining wall, including base preparation, compaction, and drainage
Describe the drainage requirements for hardscape, including surface slope, subsurface drainage, and the consequences of a missing base layer
Identify the local permitting, setback, and utility clearance requirements that affect landscape construction
Your checkpoint
A site assessment report for one property with a sketch plan, slope calculation, drainage notes, and a construction sequence for one hardscape element
Communication, Documentation, and Customer Relations & Plant Health and Integrated Pest Management & Maintenance and Cultural Practices
Write a client-facing estimate and scope of work that separates labor, materials, equipment, and disposal
Explain the components of a contract, change order, and warranty statement and describe how each protects both parties
Describe how to document an IPM inspection, an application record, and a follow-up visit so the file is defensible
Handle three described client scenarios (a disputed plant death, a budget reduction, a request outside the contract) with a professional written response
Complete a timed mixed-domain practice set and review every missed item against its source domain
Your checkpoint
A complete client package for one project: scope of work, itemized estimate, change-order template, and a written response to one dispute scenario, plus a scored practice set with a written review of misses
Milestones
Week 2: Can read a soil test report unaided and produce a defensible amendment recommendation with rates and units shown correctly
Week 4: Can identify 40 plants by Latin name and diagnostic feature, and write a planting specification that would survive review by a journeyperson
Week 6: Can complete a job hazard analysis and a sprayer calibration calculation without reference notes, scoring at least 80% on a self-made quiz of both
Week 8: Can produce a full client package and score at least 75% on a timed mixed-domain practice set, with every missed item traced to a domain and a re-study action