Red Seal Painter & Decorator · Give each week a clear focus.
8 weeks · About 7 hours per week
Work Practices, Safety, and Environmental Protection & Planning, Estimating, and Surface Preparation
Build a one-page hazard-and-controls matrix covering solvents, lead and asbestos disturbance, silica dust, isocyanates, ladders, and confined spaces, writing the control for each rather than only naming the hazard
Explain in writing how WHMIS supplier and workplace labels, safety data sheets, and pictograms drive product selection and site storage decisions
Sequence a full repaint job from client contact to final walkthrough, listing the inspection, moisture testing, substrate repair, priming, and coating steps in correct order with the reason each step cannot be skipped
Calculate surface areas and material quantities for two rooms and one exterior elevation, showing the deduction of openings and the waste allowance you applied
Draft a site-specific waste, VOC, and cleanup plan that names the disposal route for solvent rags, leftover latex, and sanding dust
Your checkpoint
A 2-page job package for a sample repaint: hazard matrix, step-by-step sequence, and quantity take-off with workings shown
Planning, Estimating, and Surface Preparation & Coating Systems and Colour Technology
Diagnose six substrate conditions from written descriptions (chalking, efflorescence, mill scale, laitance, glossy enamel, amine blush) and prescribe the preparation and primer for each
Match primer and topcoat families to substrates and service conditions, justifying each choice by adhesion, permeability, or corrosion protection rather than habit
Explain the difference between solvent-borne, water-borne, high-solids, and two-component products in terms of cure, recoat window, and application limits
Read a technical data sheet and extract pot life, induction time, recoat window, thinning allowance, and dry-film-to-wet-film ratio into a comparison table
Describe how sheen level, hiding power, and tint strength affect coverage estimates and touch-up risk
Your checkpoint
A substrate-to-coating selection chart covering at least eight substrate and service-condition combinations, each with a one-line justification
Coating Systems and Colour Technology & Interior Surface Finishing
Explain tinting, undertone, and metamerism, and describe how to check a colour match under the lighting the client will actually live with
Convert between dry film thickness and wet film thickness and state the spreading-rate adjustment needed to hit a specified DFT
Write the interior sequence for walls, ceilings, trim, and doors, stating why each element is ordered where it is and how cut-in and back-brush fit in
List the acceptance criteria for a level 4 and level 5 drywall finish and the coating implications of each
Describe how to manage lap marks, hatbanding, and flashing on large interior surfaces, including the role of boxed paint and wet edge control
Your checkpoint
A one-page interior room specification: colour rationale, product and sheen per surface, DFT target, coat count, and application sequence
Interior Surface Finishing & Tools, Equipment, and Materials Handling
Select the correct brush, roller cover, and spray tip for six stated scenarios and justify each by coating type, finish standard, and production rate
Explain airless spray setup, tip wear, pressure adjustment, and the safety hazards of injection injury and over-atomization
Describe the care, cleaning, and storage routine for natural-bristle, synthetic, and roller equipment, and how to judge when a tool is worn out
Outline the maintenance and safe operation checks for ladders, scaffolding, and aerial lifts before use
Explain how to protect floors, fixtures, and adjacent surfaces and how masking choice changes with coating and cure time
Your checkpoint
A tool and equipment selection sheet for the week 3 room specification, listing each tool, its size or rating, and the reason for the choice
Exterior Surface Finishing & Work Practices, Safety, and Environmental Protection
Write the exterior sequence for a wood-sided house including washing, scraping, glazing, caulking, spot priming, and finish coats, with the weather window required for each step
Diagnose common exterior failures (blistering, peeling, intercoat delamination, mildew, extractive bleeding) and state the cause and remedy for each
Explain moisture content limits for wood and masonry before coating and how to test for them on site
Identify fall-protection, ladder placement, and weather-stopping criteria that must be met before exterior work begins
Describe how sun exposure, substrate temperature, and wind change open time and recoat decisions during exterior application
Your checkpoint
An exterior failure-and-remedy table with at least eight defects, each with cause, preparation fix, and coating fix
Specialty Finishes, Wallcoverings, and Decorative Techniques & Planning, Estimating, and Surface Preparation
Describe the preparation, priming, and application steps for at least four specialty finishes such as faux wood grain, metallic, limewash, or textured coatings
Explain wallcovering selection by backing, weight, and paste type, and match the correct adhesive and primer to vinyl, paper, and fabric goods
Sequence wallcovering installation including layout, plumb line, booking, matching, trimming, and seam rolling
Explain how to plan around pattern repeat, drop length, and waste when estimating wallcovering rolls
Identify the surface preparation and moisture conditions that make a wall unsuitable for wallcovering and state the fix
Your checkpoint
A wallcovering and specialty finish plan for one feature wall: product, adhesive, primer, layout diagram in words, and roll count with waste
Trade Calculations, Documentation, and Communication & Tools, Equipment, and Materials Handling
Produce a full estimate for a two-room interior and one exterior wall, including labour hours, material, equipment, waste, and contingency
Convert between metric and imperial measurements and calculate coverage, dilution, and mixing ratios accurately
Write a change order and a short client-facing scope statement that a non-trade reader can follow
Explain what belongs in a job file: contracts, SDSs, inspection records, product data, and warranty terms
Describe how to document substrate conditions and pre-existing damage before work starts to limit disputes
Your checkpoint
A complete estimate with labour breakdown and a one-page client scope statement for the sample job
Work Practices, Safety, and Environmental Protection & Planning, Estimating, and Surface Preparation & Coating Systems and Colour Technology & Interior Surface Finishing & Exterior Surface Finishing & Specialty Finishes, Wallcoverings, and Decorative Techniques & Trade Calculations, Documentation, and Communication
Review every weak area identified in earlier weeks using your own notes and rework the items you got wrong
Redo the week 1 hazard matrix and week 5 exterior failure table from memory and compare against your originals
Complete a timed mixed-topic practice set and log each error with the domain and the reason for the miss
Recite the safety and environmental control points that apply to every job, without notes
Confirm exam-day logistics and assemble the reference facts you must hold in memory
Your checkpoint
A one-page personal error log by domain plus a final summary sheet of formulas, ratios, and safety rules