Red Seal Sheet Metal Worker flashcards
Red Seal Sheet Metal Worker · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Lockout/Tagout
- Procedure to isolate and secure energy sources before maintenance; prevents accidental startup. Use locks and tags on disconnects and valves.
- Hazard Communication
- Requires labeling and Safety Data Sheets for hazardous chemicals; workers must be trained on risks and safe handling.
- Fall Protection Threshold
- In general industry, fall protection is required at heights of 3 m (10 ft) or more; use guardrails, nets, or personal fall arrest.
- Third-Angle Projection
- Orthographic projection where top view is above front view and right side view is to the right; common in North American drawings.
- Hidden Lines
- Short dashed lines representing edges not visible in the current view; help interpret internal features.
- Title Block
- Drawing area containing project name, drawing number, revision, scale, date, and approvals; always verify latest revision.
- True Length
- Actual length of a line in space, found by rotating it parallel to a reference plane in an auxiliary view; used in pattern development.
- Parallel Line Development
- Pattern development method for prisms and cylinders; stretch-out length equals circumference or perimeter of base.
- Bend Allowance
- Length of neutral axis arc in a bend; formula BA = (π/180) × angle × (inside radius + K × thickness), where K is K-factor.
- Bend Deduction
- Amount subtracted from sum of flange lengths to obtain flat pattern; BD = 2 × OSSB − BA, where OSSB is outside setback.
- Galvanized Steel
- Steel coated with zinc for corrosion resistance; coating weight measured in g/m² or oz/ft²; avoid welding without removing zinc and ventilation.
- Stainless Steel Contamination
- Carbon steel particles embedded in stainless cause rust; use dedicated tools and non-contaminating brushes.
- Sheet Metal Gauge
- Standard thickness measure; U.S. Standard Gauge for steel (e.g., 24 ga = 0.024 in); aluminum uses Brown & Sharpe gauge.
- Aviation Snips
- Hand shears with compound leverage; color-coded: left (red), right (green), straight (yellow); used for cutting curves and straight lines.
- Shear Blade Clearance
- Gap between blades; typically 5–10% of material thickness; too much clearance causes burrs and edge cracking.
- Springback
- Elastic recovery of metal after bending; compensate by overbending; increases with higher yield strength and thinner material.
- Minimum Bend Radius
- Smallest inside radius that can be bent without cracking; depends on material and temper; for mild steel typically 1× thickness.
- Deburring
- Removing sharp edges and burrs after cutting or shearing; use file, deburring tool, or grinder to prevent injury and improve fit.
- Rivet Diameter Selection
- Rivet diameter should be at least 3 times the thickness of the thickest sheet; hole size matches rivet diameter; grip length covers total thickness.
- Pittsburgh Seam
- Interlocking seam used for rectangular duct; formed by folding edges and locking together; provides strength and air tightness.
- Self-Drilling Screws
- Fasteners with drill point that tap their own hole; select length for at least 3 full threads engagement; avoid overdriving.
- Galvanic Corrosion
- Corrosion when dissimilar metals contact in presence of electrolyte; isolate with tape or gasket, especially aluminum and steel.
- Flashing Lap
- Minimum overlap for roof flashing is 75 mm (3 in); lap joints in direction of water flow and seal laps.
- Rain Screen Principle
- Building envelope design with drainage plane, air barrier, and ventilation behind cladding to manage moisture and improve durability.
- Thermal Movement
- Expansion and contraction due to temperature changes; allow with slotted holes or clips; typical 1 mm/m for steel, 2.4 mm/m for aluminum over 100°C range.
- Duct Seal Class
- SMACNA classification for duct leakage; Seal Class A is highest, requiring sealing of all joints and seams.
- Duct Hanger Spacing
- Support spacing per SMACNA: 2.4 m (8 ft) for rectangular duct, 3 m (10 ft) for round duct; support at joints.
- Fire Damper Installation
- Installed at fire-rated penetrations to prevent spread of fire; must be inspected and tested after installation.
- Pitot Tube Traverse
- Method to measure airflow: measure velocity pressure at points across duct; average and convert to velocity using V = 1096 × √VP (ft/min).
- Air Balancing Tolerance
- Adjust dampers to achieve design airflow within ±10%; measure with anemometer or pitot tube.
- Duct Leakage Test
- Pressurize duct and measure leakage per SMACNA; allowable leakage depends on seal class; ensures energy efficiency.
- Commissioning Report
- Document verifying installation against design, test results, and equipment operation; required for building handover.