Mistake 1

Calculating pipe offsets with the wrong fitting allowance - using centre-to-centre or centre-to-end dimensions interchangeably, or forgetting to subtract the takeout of both fittings when cutting the pipe.

Candidates memorise the offset formulas but practise them with centre-to-centre dimensions, then meet exam items dimensioned centre-to-face or face-to-face. The takeout (fitting allowance) is also different for 45° and 90° elbows and for screwed versus welded fittings, and candidates mix these up under time pressure.

What to do instead

Before calculating, redraw the run and label every dimension as C-C, C-F, or F-F. Convert to a consistent basis first, then apply the correct takeout for each specific fitting type and size. Build a one-page takeout reference table for the sizes and fitting types in the standard and drill ten offset problems per session, checking units at each step.

Mistake 2

Reading isometric drawings without resolving elevation and orientation - treating a line shown as sloping in the isometric as a flat run, or misreading which way a branch goes relative to north.

Isometrics compress three dimensions into two, and candidates who are strong at orthographic views often transfer that habit and read vertical offsets as horizontal. The north arrow and the elevation callouts are the only cues, and they are easy to skip when rushing.

What to do instead

Adopt a fixed reading routine for every isometric: locate the north arrow, then trace each line from the origin and state aloud whether it rises, falls, or stays level, and which compass direction it runs. Convert the isometric into a simple plan and elevation sketch before answering. Practise with isometrics that contain at least two vertical offsets and one rolled offset.

Mistake 3

Using the wrong welding procedure variables - assuming any low-hydrogen electrode works for a given joint, or ignoring preheat and interpass requirements when the exam describes a specific material and thickness.

Candidates remember electrode classifications loosely and apply general rules of thumb instead of the code- or procedure-driven values. Preheating and interpass limits feel like workshop trivia rather than exam material, so they are under-studied.

What to do instead

Learn electrode classification by decoding the digits (position, coating, current type, strength) rather than memorising trade names. For each common base metal group, write down the preheat and interpass ranges and the reason each exists. Practise matching a described joint, material, and thickness to the correct electrode, current, and preheat in one decision sequence.

Mistake 4

Selecting a pipe support type by appearance rather than by function - putting a rigid hanger where guided or spring support is required, or omitting the anchor that absorbs thermal movement.

Support questions look like catalogue recall, so candidates pick the familiar-looking hanger. They miss that the exam is testing whether the candidate understands load, movement, and vibration control as separate functions that each demand a different support.

What to do instead

Classify supports by function first: weight support, guide, anchor, restraint, or spring for expansion. For each, state what movement it permits and what it prevents, then match the described service (hot line, vertical run, vibrating pump discharge) to the function before choosing hardware. Review thermal expansion and how anchors and loops accommodate it.

Mistake 5

Sizing pipe or tubing from a single velocity figure while ignoring the pressure drop and available head - choosing a diameter that meets velocity but exceeds the allowable friction loss over the run.

Velocity limits are the easiest number to remember, so candidates stop there. The exam often gives flow rate, equivalent length, and allowable pressure drop, which requires combining friction loss with fitting equivalents rather than answering from a rule of thumb.

What to do instead

Work every sizing problem through the full chain: flow rate, allowable pressure drop, equivalent length including fitting allowances, then friction loss per unit length, then diameter. Keep a table of equivalent lengths for common fittings and valves. Sanity-check the answer against a velocity limit only as a final step, not as the method.

Mistake 6

Joining dissimilar materials or transitioning between piping systems without accounting for dielectric isolation, expansion difference, or thread compatibility, and then answering as if a direct connection is acceptable.

Candidates focus on whether the joint can be physically made and overlook galvanic corrosion and differential expansion, which are the actual points being tested. Thread standards and material compatibility are learned piecemeal on site rather than systematically.

What to do instead

For any transition question, run three checks in order: galvanic compatibility (does a dielectric union or isolating flange belong here?), differential expansion (does the joint need a flex element or loop?), and thread or connection standard compatibility. Memorise the galvanic series order for the common piping metals and the standard thread types used in the trade.

Mistake 7

Skipping the lockout and isolation sequence in safety questions - describing the repair correctly but leaving out verification of zero energy, depressurisation, or drain-down before work begins.

Candidates treat the technical repair as the real question and the safety steps as preamble, so they answer the 'how do I fix it' part and lose marks on the procedural part. Isolation steps are also easy to compress mentally because they are routine in the field.

What to do instead

Treat every task-based safety item as a sequence question and write the steps in order: identify all energy sources, isolate, lock and tag, relieve stored energy (pressure, steam, spring, thermal), verify zero energy, then work. Practise writing this sequence for steam, hot water, and gas systems separately, since stored-energy sources differ.

Mistake 8

Misapplying the code or standard by citing a clause from memory without checking which edition, scope, or jurisdiction applies to the scenario described.

Candidates learn code content but not code structure, so they recall a number without recalling its scope or the edition it came from. Exam items often hinge on whether a fitting, material, or installation falls inside the scope at all.

What to do instead

Study the code's organisation and scope sections as carefully as its technical clauses. For each practice item, identify which standard governs, which edition the stem implies, and whether the item is inside or outside that scope before answering. Note where provincial or territorial amendments commonly override the model code.

Mistake 9

Answering rigging and hoisting items by load weight alone, ignoring centre of gravity, sling angle, and the resulting tension increase as the angle from horizontal decreases.

The weight is stated plainly in the stem, so candidates use it directly. Sling angle multipliers and centre-of-gravity shifts are the actual calculation being tested, and candidates who have not drilled them default to the obvious number.

What to do instead

For every lift item, calculate sling tension from the angle, not from weight alone - remember that tension rises sharply as the sling approaches vertical from a shallow angle. Locate the centre of gravity before choosing pick points, and check the rated capacity of each sling and shackle against the calculated tension, not the load weight.

Mistake 10

Mismanaging time by dwelling on calculation-heavy items and then rushing the shorter code, safety, and tool questions that carry equal marks.

Calculation items feel productive and candidates want to finish them, so they over-invest. The remaining items are shorter but numerous, and the rush produces avoidable errors on questions the candidate actually knows.

What to do instead

Do a first pass answering every item that can be settled in under a minute, flagging calculations for a second pass. Set a per-item time budget from the total item count and stick to it. On the second pass, show the calculation steps on scratch paper so a wrong answer can be traced, and reserve the last minutes for flagged items rather than re-reading answered ones.