Sling angle factor

A multiplier applied to a load's weight to account for the increased tension in sling legs as the angle between the legs and horizontal decreases; commonly the load divided by the sine of the vertical angle.

Related: Tension in sling legs, Working load limit
Tension in sling legs

The actual force carried by each sling leg, which rises as legs move away from vertical; two-leg lifts at 60 degrees from horizontal carry about 0.58 of the load per leg.

Related: Sling angle factor, Bridle hitch
Working load limit

The maximum mass or force a rigging component, sling, or attachment is rated to support in a specified configuration, as determined by its manufacturer and marked on the item.

Related: Proof load, Sling angle factor
Proof load

A test load applied to rigging hardware or a crane component to verify strength without permanent deformation, typically a multiple of the working load limit set by the manufacturer or standard.

Related: Working load limit, Periodic inspection
Bridle hitch

A rigging arrangement using two or more slings joined at a common point to lift a load, often used to keep the load level or to attach at separated lifting points.

Related: Tension in sling legs, Load moment
Load moment

The product of a load's weight and its horizontal distance from the crane's tipping axis or slew centre, used to compare against the crane's rated capacity at that radius.

Related: Rated capacity, Load radius
Load radius

The horizontal distance from the crane's rotation centre to the vertical line through the centre of gravity of the suspended load, measured with the boom or jib in the working position.

Related: Load moment, Rated capacity
Rated capacity

The maximum load a crane configuration may lift at a given radius and boom length, as published in the manufacturer's load chart, after all applicable deductions and deratings are applied.

Related: Load chart, Load moment
Load chart

The manufacturer-supplied table or graph that states rated capacities for defined boom lengths, radii, and configurations, including notes on outrigger spread, counterweight, and permissible duties.

Related: Rated capacity, Deductions from gross capacity
Deductions from gross capacity

The subtraction of the weight of rigging, hook block, and other suspended attachments from the gross load chart value to determine the net payload that may be lifted safely.

Related: Rated capacity, Load chart
Outrigger spread

The distance between the extended outrigger pads or floats, which determines the crane's effective support base and which load chart column applies to the lift.

Related: Ground bearing pressure, Rated capacity
Ground bearing pressure

The force per unit area transmitted through outrigger pads, crawler tracks, or wheels into the supporting ground, which must not exceed the soil's verified capacity.

Related: Outrigger spread, Matting
Matting

Timber, steel, or composite pads placed under outriggers or tracks to spread load over a larger area, reducing ground bearing pressure and improving stability on soft or uneven surfaces.

Related: Ground bearing pressure, Levelling
Levelling

The process of adjusting a crane's supports so the base is horizontal within the manufacturer's tolerance, verified with a bubble level or inclinometer before any lift is made.

Related: Matting, Outrigger spread
Anti-two-block device

A safety system that detects when the hook block approaches the boom tip or jib sheave and stops hoisting or lowering to prevent rope damage and load loss.

Related: Limit switch, Pre-operational inspection
Limit switch

An electromechanical or proximity device that interrupts a crane motion at a set travel point, such as maximum hoist, boom lower, or trolley travel, to prevent structural or rope damage.

Related: Anti-two-block device, Moment limiter
Moment limiter

An overload protection system that continuously compares actual load moment with the rated value for the current configuration and stops hazardous motions before the crane is overloaded.

Related: Rated capacity, Load moment
Pre-operational inspection

The documented check of crane structures, ropes, brakes, safety devices, and fluid levels performed before each shift and before any lift, with defects reported and the crane taken out of service if unsafe.

Related: Periodic inspection, Anti-two-block device
Periodic inspection

A more thorough examination of the crane at intervals set by the manufacturer, standard, or jurisdiction, including non-destructive testing of critical welds and structural components where required.

Related: Pre-operational inspection, Proof load
Wire rope lay

The pattern in which strands and wires are twisted into a rope, such as regular lay or lang lay, which affects abrasion resistance, flexibility, and resistance to rotation under load.

Related: Wire rope inspection criteria, Dead end
Wire rope inspection criteria

The published limits for broken wires, wear, corrosion, kinking, and diameter reduction beyond which a rope must be removed from service and replaced.

Related: Wire rope lay, Pre-operational inspection
Dead end

The non-load-bearing end of a wire rope that is secured to a drum or anchor point, often with wedges or clamps, as distinct from the live end that spools onto the drum.

Related: Wire rope lay, Drum spooling
Drum spooling

The way rope winds onto the hoist drum, with correct wraps and fleet angle preventing slack, cross-winding, and rope damage that could cause load loss.

Related: Dead end, Wire rope inspection criteria
Counterweight

Ballast mounted on the rear of the upper structure to balance the load moment, whose mass and configuration must match the load chart in use.

Related: Load moment, Rated capacity
Climbing

The process of raising a tower crane's mast by adding sections using a climbing frame and hydraulic rams, following a defined sequence and with the crane in a specified balanced condition.

Related: Climbing frame, Tie-in
Climbing frame

The structural collar and hydraulic apparatus that supports the crane's upper works during mast section insertion or removal, and which must be inspected and correctly pinned before climbing.

Related: Climbing, Tie-in
Tie-in

A structural connection anchoring a tower crane mast to a building or other support at defined heights to increase stiffness and permitted free-standing height.

Related: Climbing, Free-standing height
Free-standing height

The maximum mast height a tower crane may reach without wall ties or other lateral support, as specified by the manufacturer and affected by foundation and wind conditions.

Related: Tie-in, Climbing
Slewing

Rotation of the crane's upper structure about its vertical axis, controlled by the slewing mechanism and brake, which must be operated smoothly to control load swing.

Related: Load swing control, Slew brake
Slew brake

The brake or lock that holds the upper structure against rotation or controls its deceleration, used with care because sudden stops can cause load swing and structural shock.

Related: Slewing, Load swing control
Load swing control

The technique of accelerating and decelerating hoist, trolley, and slew motions smoothly and timing movements so the suspended load does not swing beyond safe limits.

Related: Slewing, Tag line
Tag line

A rope attached to a load and controlled by a person on the ground to restrain rotation and swing, kept clear of the load's path and never wrapped around a hand or body part.

Related: Load swing control, Blind lift
Blind lift

A lift where the operator cannot see the load or landing area directly and relies entirely on a designated signaller, requiring agreed signals and a planned communication method.

Related: Tag line, Hand signals
Hand signals

Standardized arm and hand movements used by a designated signaller to direct crane motions, which must be understood by operator and signaller before work begins and used only by one person at a time.

Related: Blind lift, Radio communication protocol
Radio communication protocol

Agreed channel, call signs, and phraseology for crane operations, including a dedicated channel and a clear stop command that overrides all other instructions.

Related: Hand signals, Blind lift
Lift plan

A documented assessment of a specific lift covering load weight and centre of gravity, rigging, crane configuration, ground conditions, hazards, roles, and contingency measures, approved before work starts.

Related: Critical lift, Rigging study
Critical lift

A lift that exceeds defined risk thresholds, such as a high percentage of rated capacity, tandem lifting, lifting personnel, or lifting over occupied areas, requiring a formal engineered plan and additional controls.

Related: Lift plan, Exclusion zone
Exclusion zone

A marked area beneath and around the lift path where unauthorised people are kept out, established so that a dropped load or swinging crane cannot injure workers.

Related: Critical lift, Lockout
Lockout

The procedure of isolating and securing energy sources, such as electrical supply or hydraulic pressure, with locks and tags before maintenance or repair work begins.

Related: Exclusion zone, Pre-operational inspection
Centre of gravity

The point at which a load's weight is considered concentrated; its position relative to the hook determines load tilt and must be identified before rigging.

Related: Load moment, Bridle hitch