- Roofing square
- A roofing square equals 100 square feet of roof surface. Contractors use squares to estimate shingles, underlayment, and labor quantities.
- Asphalt shingle slope limit
- Asphalt shingles generally require a minimum roof slope of 2:12. Slopes from 2:12 up to 4:12 need double underlayment under the shingles.
- Low-slope roof
- A roof with a slope of 3:12 or less. It typically uses membranes such as modified bitumen, EPDM, TPO, or built-up roofing rather than shingles.
- Underlayment side lap
- Asphalt-saturated felt underlayment commonly laps 2 inches at side seams and 4 inches at end seams for No. 15 felt; always follow the manufacturer's printed instructions.
- Roof ventilation ratio
- IRC generally requires 1 square foot of net free ventilation per 150 square feet of attic floor area; balanced vents and a vapor retarder may allow 1 per 300.
- Step flashing
- L-shaped metal flashing installed at a roof-to-sidewall intersection, woven with each shingle course, to direct water onto the roof surface and prevent wall penetration.
- Cool roof rating
- The Cool Roof Rating Council rates roof products for solar reflectance and thermal emittance. California Title 24 compliance often requires CRRC-listed products meeting climate-zone values.
- Roof slope ratio
- Slope is vertical rise divided by horizontal run, usually written as rise per 12 inches of run. A 6:12 roof rises 6 inches for every 12 inches horizontal.
- Slope factor
- For a roof with rise r per 12 inches of run, the slope factor is the square root of 1 plus (r/12) squared. Multiply footprint area by it.
- Roof live load
- The load from occupancy, snow, and maintenance personnel on a roof. Residential code commonly sets a 20 psf minimum, subject to code reductions and local amendments.
- Collar tie
- A horizontal framing member connecting opposing rafters in the upper third of the attic. It helps resist rafter separation and uplift but is not a substitute for proper rafter ties.
- Ridge beam
- A structural beam at the roof peak that carries rafter loads to posts or walls. Unlike a ridge board, it is designed by a qualified person for bending and deflection.
- Truss modification rule
- Roof trusses may not be cut, notched, or altered without approval from a licensed engineer or the truss manufacturer. Field modifications can void the truss design and compromise safety.
- Plan scale
- A drawing scale such as 1/4 inch equals 1 foot converts measured drawing distances to real dimensions. Verify the stated scale before scaling any plan.
- Roof area takeoff
- Calculate horizontal footprint area, multiply by the slope factor, then add waste and penetrations. Convert the result to roofing squares by dividing by 100.
- Waste factor
- Extra material allowance for cuts, overlaps, and damaged pieces. Simple gable roofs often use 5 to 10 percent; complex hip and valley roofs may need 10 to 15 percent.
- Shingle bundle coverage
- Three-tab asphalt shingles commonly cover about one-third of a square per bundle, so three bundles cover one square. Architectural shingle coverage varies by manufacturer.
- Addendum
- A written modification to bid documents issued before the bid deadline. Bidders must acknowledge it, and it becomes part of the contract documents.
- Change order
- A written agreement signed after contract execution that changes scope, price, or schedule. It should be signed before the changed work proceeds to avoid disputes.
- Markup versus margin
- Markup is profit divided by cost. Margin is profit divided by selling price. A 20 percent markup yields a 16.7 percent margin, so do not confuse the two.
- Cal/OSHA fall trigger
- California construction employers generally must provide fall protection when employees are exposed to falls of 7.5 feet or more. Always follow the current Title 8 standard.
- Ladder setup angle
- Extension ladders should be set at about a 4:1 ratio, meaning 1 foot out for every 4 feet of working height, and extend 3 feet above the landing.
- Guardrail height
- A standard guardrail has a top rail about 42 inches above the walking surface, a midrail, and toe boards where required. Openings must not allow a fall.
- Hot work permit
- A written authorization for welding, grinding, or torch work that specifies fire precautions, a fire watch, and clearance from combustibles. It helps prevent roof fires.
- Personal fall arrest
- A system using a full-body harness, lanyard, and anchor rated at 5,000 pounds or engineered equivalent. It must limit free fall and include prompt rescue planning.
- Asphalt kettle safety
- Keep roofing asphalt kettles covered, temperature-controlled, and away from combustibles. Provide a fire extinguisher and train workers to avoid burns and fume exposure.
- License threshold
- California generally requires a contractor license for projects of $500 or more in labor and materials. The threshold applies to the combined contract price, not labor alone.
- Down payment limit
- On California home improvement contracts, the down payment may not exceed 10 percent of the contract price or $1,000, whichever is less.
- Preliminary lien notice
- A contractor generally must serve a preliminary notice on the owner and lender within 20 days after first furnishing labor or materials to preserve mechanic's lien rights.
- Workers compensation
- California employers must carry workers' compensation insurance for employees. A contractor may need to provide a certificate or exemption before starting work.
- Bid bond
- A bond submitted with a bid, often 10 percent of the bid amount, guaranteeing the bidder will enter the contract if awarded.
- Conditional lien release
- A document stating that a progress or final payment is conditioned on receipt of funds. It releases lien rights only when the payment actually clears.