SGI Class 1 study materials
SGI Class 1 study resources

Twelve steel pipes, minus -28 °C, and the Lumsden descent

SGI Class 1 · Put your knowledge to work in context.

All case studies

Twelve steel pipes, minus -28 °C, and the Lumsden descent

It is 05:00 in January, -28 °C with light snow. Nadia is loading twelve steel pipes onto her 48-foot flatbed in Regina. Each pipe is 12.2 m long and weighs 900 kg. She has four 3/8-inch grade-70 chains with lever binders; the tags show a working load limit of 2,300 kg each. One chain has a cracked link and a bent hook, so she sets it aside and uses the remaining three. Two of those three run directly over pipe edges with no edge protection, and the forward end of the pipes sits 1.4 m back from the front of the deck. Her route is Highway 11 north through the Qu'Appelle Valley near Lumsden, a long descent into and out of the valley. She plans to hold 100 km/h downhill using the engine brake, with the service brakes as needed. She has not drained the air tanks since November. Dispatch wants her out by 05:30.

1. Is the load legal to move as secured? Show the securement math and list each defect.

Read the worked answer

Work it in three parts: aggregate strength, tiedown count, and how the tiedowns are applied.

  • Aggregate working load limit. Cargo weight = 12 × 900 kg = 10,800 kg. Required aggregate WLL is at least 50% = 5,400 kg. Three chains at 2,300 kg = 6,900 kg, so the strength test is met - but only by using three chains, and the count test fails.
  • Tiedown count. The working rule is a minimum of one tiedown for each 3.04 m of article length, with at least two, placed as close as practical to the ends. A 12.2 m pipe therefore needs four tiedowns. She has three. The load is short one tiedown before any other defect is considered.
  • Defects in application. (1) The cracked-link, bent-hook chain is unusable and must be removed from service, not "set aside" for later. (2) Chains running over sharp pipe edges without edge protection concentrate load and can be cut or deformed; edge protectors are required. (3) The forward end sits 1.4 m back, outside the 1.2 m end-tiedown placement, so the front is not effectively restrained against forward movement. (4) Round pipes must be blocked, wedged or otherwise immobilized against rolling - tiedowns alone do not stop a pipe from rotating out of the stack.

Verdict: not legal to move as secured.

2. Assess her winter descent plan and the air system issue.

Read the worked answer

Two separate problems are stacked here.

The air system. Air tanks must be drained regularly, and in a Saskatchewan January moisture in the system freezes. Ice in a line or a frozen drain cock can cause delayed brake application, a dragging brake, or a pressure loss exactly when the service brakes are needed. Not draining since November on a vehicle parked outside is a defect waiting to happen. The pre-trip should include draining the tanks and a full air brake test - build-up, leak-down and low-pressure warning - before the unit leaves the yard.

The descent. Holding 100 km/h downhill on snow at -28 °C is not a plan; it is a hope. Correct technique is to select a gear low enough that engine braking holds a controlled speed before entering the descent, keep the engine brake on the drive axles but be aware that on a slippery surface it can lock the drives and start a jackknife, use service brakes in short, firm applications rather than riding them, and keep a long following distance so there is room to stop if the vehicle ahead spins. If speed builds beyond control, the answer is a lower gear, not more brake. A loaded combination descending the valley should be well below highway speed at the crest.

3. What should Nadia do before departure, and where does the carrier's responsibility lie?

Read the worked answer

Before departure she should:

  • obtain a serviceable fourth chain and remove the cracked one from the truck entirely;
  • fit edge protectors at every contact point and add blocking or wedges so the pipes cannot roll;
  • re-place the forward tiedown within 1.2 m of the pipe ends, and re-check tension after a short distance and again later in the trip;
  • drain the air tanks, complete the air brake test, and do a full pre-trip in the cold before moving;
  • make a realistic plan for the descent - lower gear, reduced speed, increased spacing - and build in a stop to re-check the load and the brakes.

The carrier's responsibility sits with dispatch as much as with the driver. The company must supply serviceable securement equipment and edge protection, allow time for a proper pre-trip in extreme cold, and not push a 05:30 departure at the cost of either. Nadia has a right - and a duty - to refuse to move an improperly secured load or a vehicle with a known brake-system defect; the 05:30 target is not a defence at a roadside inspection or after a collision, and the resulting out-of-service order and safety-profile damage land on the carrier as well as the driver.