CBP BPA study materials
CBP BPA study resources

CBP BPA flashcards

CBP BPA · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

BPMN exclusive gateway
An XOR gateway that evaluates conditions and activates exactly one outgoing sequence flow, used for decision points where only one path can be taken.
BPMN parallel gateway
An AND gateway that splits into all outgoing paths simultaneously and joins by waiting for all incoming tokens before continuing.
BPMN inclusive gateway
An OR gateway that activates one or more outgoing paths based on conditions and waits for all activated incoming paths at a join.
BPMN pool and lane
A pool represents a participant or organization; lanes are sub-partitions within a pool for roles or departments. Sequence flows stay within a pool.
BPMN message flow
A dashed connector showing communication between two separate pools or participants; it cannot connect elements within the same pool.
Process discovery
The act of capturing an as-is process through interviews, observation, document review, or system logs, producing a validated model of current work.
Token simulation
A technique that moves tokens through a process model to verify control flow, gateway behavior, and reachability of end states.
Descriptive vs executable model
A descriptive model communicates the business view at a high level; an executable model contains enough technical detail for a process engine to run it.
Little's Law
WIP equals throughput multiplied by cycle time; it relates the average number of items in a process to arrival rate and time in system.
Bottleneck
The activity or resource with the highest utilization or longest cycle time that limits the overall capacity of the process.
Utilization formula
Utilization equals arrival rate times processing time divided by the number of resources; high utilization causes queueing delays.
Value-added analysis
Classifying each activity as value-adding, business-value-adding, or non-value-adding to identify waste and improvement opportunities.
TIMWOODS wastes
Eight lean wastes: Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, and Skills underutilization.
Process mining
Analyzing event logs to discover process models, check conformance, and measure performance such as waiting times and bottlenecks.
Fishbone diagram
An Ishikawa cause-and-effect diagram that organizes potential root causes into categories such as people, process, technology, and environment.
Pareto analysis
A prioritization technique based on the 80/20 rule, focusing on the few causes that produce most of the effect or defects.
Cycle time
The average time from when an item enters the process until it exits; for a stable process it equals one divided by throughput.
Conformance checking
Comparing an event log to a process model to detect deviations, such as skipped steps or unauthorized paths.
To-be process design
The future-state process model created by applying redesign heuristics to the as-is model and validating it with stakeholders.
DMN decision table
A Decision Model and Notation table that maps input conditions to output decisions, separating business rules from process flow.
Service blueprint
A service design diagram showing front-stage and back-stage actions separated by lines of interaction, visibility, and internal interaction.
RACI matrix
A responsibility assignment chart defining who is Responsible, Accountable, Consulted, and Informed for each process activity.
Segregation of duties
A control principle that separates incompatible tasks among different people to reduce fraud and error risk.
Exception handling design
Modeling error events, compensation, and escalation paths so the process handles deviations, not just the happy path.
RPA suitability
Rule-based, repetitive, high-volume, stable tasks with digital inputs are good candidates; judgment-heavy or unstructured tasks are not.
Process owner
The role accountable for end-to-end process performance, including KPIs, SLAs, governance, and continuous improvement.
ADKAR model
A change management model with five outcomes: Awareness, Desire, Knowledge, Ability, and Reinforcement, used to guide individuals through change.
Kotter's eight steps
A change leadership sequence: urgency, coalition, vision, communication, empowerment, quick wins, consolidation, and anchoring in culture.
Impact/effort matrix
A prioritization tool plotting initiatives by business impact and implementation effort to sequence quick wins and strategic projects.
BPMS
A Business Process Management Suite that supports modeling, execution, monitoring, and optimization of processes across their lifecycle.
Center of Excellence
A centralized team that provides standards, tools, and governance for process transformation and automation initiatives.
Benefits realization
Tracking and verifying that planned transformation benefits, such as cost savings or cycle time reduction, are actually achieved after go-live.