CIMA E2 - independent subject foundations study materials
CIMA E2 - independent subject foundations study resources

CIMA E2 - independent subject foundations cheat sheet

CIMA E2 - independent subject foundations · Keep the key ideas within reach.

Quick reference

Business strategy

  • A business model connects customer value, delivery, resources, costs and revenue; its assumptions require evidence.

  • Porter's generic strategies require a clear basis for competitive advantage.

  • Expected value weights outcomes by probability but ignores risk attitude.

  • Suitability, acceptability and feasibility structure strategy evaluation.

  • Implementation fails when culture, structure and resources are misaligned.

Quick reference

Human resource management

  • Turnover uses average employees; absenteeism uses possible working days.

  • Job description = duties; person specification = candidate attributes.

  • Herzberg separates hygiene factors from motivators; pay alone is hygiene.

  • Leadership style should be matched to task, workforce skill and time pressure.

  • Redundancy and dismissal have different legal and motivational implications.

Quick reference

Operations management

  • Capacity utilisation = actual output ÷ maximum output × 100.

  • Break-even = fixed costs ÷ contribution per unit; margin of safety = current sales − break-even.

  • JIT cuts holding costs but raises supply-chain vulnerability.

  • TQM is preventive and company-wide; quality control is inspection-based.

  • Critical path is the longest route through the network and sets project duration.

Quick reference

Project scope, people, risk and supplied performance models

  • Decompose actual scope and trace requirements to acceptance evidence.

  • Critical-path and float calculations require stated network assumptions.

  • CPI=EV/AC and SPI=EV/PV under the supplied earned-value model.

  • Choose forecast assumptions and authorization paths explicitly.

  • Quality = meeting requirements; grade = feature category. Low grade is acceptable, low quality is not.

  • Managing quality is process-focused; controlling quality inspects deliverables.

  • Pareto chart prioritises the vital few causes.

  • Control limits differ from specifications; use the stated chart and run-rule procedure to investigate signals.

  • External failure can be costly, but compare actual consequences rather than assume one universal ordering.

  • RACI: exactly one accountable owner per activity.

  • Tuckman: forming, storming, norming, performing, adjourning.

  • Herzberg: pay and conditions are hygiene factors; achievement and recognition motivate.

Quick reference

Business models, digital value and organizational change

  • Separate value proposition, operating capability and revenue mechanism.

  • Evaluate network effects and subscriptions through actual costs, retention and cash.

  • Use change models as lenses rather than deterministic laws.

  • Review realized benefits after a project delivers its output.