CIMA P1 study materials
CIMA P1 study resources

CIMA P1 key terms

CIMA P1 · Get comfortable with the vocabulary.

Absorption costing

A costing method that assigns both variable costs and a share of fixed production overhead to each unit produced, using a predetermined absorption rate based on labour hours, machine hours or another activity base.

Related: Overhead absorption rate, Marginal costing, Over- and under-absorption
Marginal costing

A costing approach that charges only variable production costs to units, treating fixed production overhead as a period cost written off in full against contribution in the period incurred.

Related: Contribution, Absorption costing, Throughput accounting
Overhead absorption rate

The rate used to spread budgeted production overhead across units, calculated as budgeted overhead divided by budgeted activity such as direct labour hours, machine hours or units.

Related: Absorption costing, Over- and under-absorption, Activity-based costing
Over- and under-absorption

The difference between overhead actually absorbed into production using the predetermined rate and overhead actually incurred; over-absorption means too much was charged, under-absorption means too little.

Related: Overhead absorption rate, Absorption costing
Activity-based costing

A costing system that assigns overhead to products via cost pools and cost drivers reflecting the activities that consume resources, rather than a single volume-based absorption rate.

Related: Cost driver, Overhead absorption rate
Cost driver

A factor that causes a change in the cost of an activity, such as number of set-ups, orders or machine hours, used as the basis for allocating costs in activity-based systems.

Related: Activity-based costing, Cost pool
Cost pool

A grouping of individual cost items or overhead costs collected together before being allocated or apportioned to products, departments or activities on a consistent basis.

Related: Cost driver, Activity-based costing
Contribution

Sales revenue less variable costs. It measures the amount each unit or product line contributes towards covering fixed costs and then generating profit.

Related: Marginal costing, Break-even point, Limiting factor
Break-even point

The level of sales activity at which total revenue equals total cost, so the business makes neither profit nor loss; often expressed in units or revenue.

Related: Contribution, Margin of safety, Cost-volume-profit analysis
Margin of safety

The amount by which budgeted or actual sales exceed the break-even level, expressed in units, revenue or as a percentage of sales, indicating how far sales can fall before losses arise.

Related: Break-even point, Cost-volume-profit analysis
Cost-volume-profit analysis

A technique examining how changes in volume, selling price, variable cost and fixed cost affect profit, often using break-even charts and contribution per unit calculations.

Related: Break-even point, Contribution, Margin of safety
Standard costing

A control system that sets predetermined costs and revenues for products and compares them with actual results to identify and investigate variances.

Related: Variance analysis, Standard cost, Flexible budget
Standard cost

A planned unit cost built from expected quantities and prices of materials, labour and overhead, used as the benchmark against which actual performance is measured.

Related: Standard costing, Variance analysis
Variance analysis

The process of calculating differences between budgeted or standard figures and actual figures, then breaking them into price and quantity elements to explain performance.

Related: Standard costing, Flexible budget, Planning and operational variances
Planning and operational variances

A split of total variance into the part caused by revising the original standard or budget (planning) and the part caused by actual operating performance against the revised standard (operational).

Related: Variance analysis, Standard cost
Flexible budget

A budget adjusted to the actual level of activity achieved, so that variable costs reflect actual volume and comparisons with actual costs isolate genuine price and efficiency variances.

Related: Variance analysis, Fixed budget, Budgetary control
Fixed budget

A budget prepared for one specific planned level of activity, remaining unchanged when actual activity differs, which limits its usefulness for performance evaluation.

Related: Flexible budget, Budgetary control
Budgetary control

The use of budgets to plan operations, communicate targets, monitor actual performance against plan and take corrective action where significant differences arise.

Related: Flexible budget, Variance analysis, Responsibility accounting
Incremental budgeting

A budgeting approach that starts from the previous period's budget or actual figures and adjusts them for expected changes, inflation or known developments, rather than building from zero.

Related: Zero-based budgeting, Rolling budget
Zero-based budgeting

A method where every activity and cost must be justified from a nil base each budget cycle, typically through decision packages ranked for funding, rather than relying on prior spending.

Related: Incremental budgeting, Budget slack
Rolling budget

A budget continually updated by adding a new period as the current one expires, so the planning horizon always extends a fixed number of periods into the future.

Related: Incremental budgeting, Budgetary control
Budget slack

The deliberate inflation of budgeted costs or understatement of budgeted revenues by managers to make targets easier to achieve, reducing the budget's usefulness for planning and control.

Related: Zero-based budgeting, Budgetary control
Responsibility accounting

A system that assigns revenues and costs to individual managers or centres accountable for them, so performance is judged only on items within that manager's control.

Related: Budgetary control, Controllable cost
Controllable cost

A cost that a particular manager can influence or decide upon within a given period, and which is therefore appropriate to include when evaluating that manager's performance.

Related: Responsibility accounting, Variance analysis
Relevant cost

A future cash cost or benefit that differs between the alternatives being considered; costs that are sunk, committed or identical across options are excluded from the decision.

Related: Opportunity cost, Sunk cost, Incremental analysis
Opportunity cost

The contribution or benefit forgone by using a scarce resource in one way rather than in its next best alternative use; it is relevant to decision making even without a cash outflow.

Related: Relevant cost, Limiting factor
Sunk cost

A cost already incurred, or a committed outlay that cannot be changed by the decision, and which is therefore irrelevant to choosing between future alternatives.

Related: Relevant cost, Opportunity cost
Incremental analysis

A decision technique comparing only the additional revenues and additional costs arising from a proposed change, ignoring amounts unaffected by the choice.

Related: Relevant cost, Make-or-buy decision
Limiting factor

The scarce resource, such as machine hours, skilled labour or materials, that restricts output and therefore determines the ranking of products by contribution per unit of that resource.

Related: Contribution, Opportunity cost, Throughput accounting
Make-or-buy decision

A choice between producing a component or service internally and purchasing it externally, based on comparing relevant internal costs with the external purchase price and any lost contribution.

Related: Relevant cost, Incremental analysis, Opportunity cost
Shut-down decision

A short-term judgement on whether to cease an activity, usually comparing the contribution lost against the fixed costs saved and considering whether closure is temporary or permanent.

Related: Contribution, Relevant cost
Throughput accounting

A constraint-focused approach measuring throughput as sales revenue less material cost, then ranking products by throughput per unit of the bottleneck resource rather than by contribution.

Related: Limiting factor, Marginal costing
Pricing strategy

The approach a business takes to setting prices, such as cost-plus, market-based, penetration, skimming or price discrimination, chosen to meet commercial and competitive objectives.

Related: Relevant cost, Target costing
Target costing

A pricing-led approach where the allowable cost is derived by subtracting the required profit margin from a market-determined selling price, and the product is designed to meet that cost.

Related: Pricing strategy, Life-cycle costing
Life-cycle costing

The accumulation of all costs associated with a product over its entire life from design and development through production to withdrawal and disposal, supporting pricing and design decisions.

Related: Target costing, Relevant cost
Risk

The possibility that actual outcomes differ from expected outcomes, where the range of possible results and their probabilities are known or can be estimated.

Related: Uncertainty, Expected value, Sensitivity analysis
Uncertainty

A situation where possible outcomes or their probabilities cannot be reliably identified or assigned, so decision makers must rely on judgement, ranges or scenario reasoning.

Related: Risk, Scenario analysis, Sensitivity analysis
Expected value

The probability-weighted average of the possible outcomes of a decision, calculated by multiplying each outcome by its probability and summing the results.

Related: Risk, Decision tree
Decision tree

A diagram mapping sequential decisions, possible outcomes and their probabilities, used to evaluate alternatives by rolling back expected values from the end nodes.

Related: Expected value, Risk
Sensitivity analysis

A technique that tests how far one input variable, such as price or volume, can change before a decision's outcome or break-even position is altered.

Related: Risk, Uncertainty, Scenario analysis
Scenario analysis

The examination of several coherent alternative futures, such as best, worst and most likely cases, to assess the range of possible outcomes and their implications for decisions.

Related: Uncertainty, Sensitivity analysis, Risk
Maximin and maximin criteria

Decision rules under uncertainty: maximin selects the alternative with the best worst-case outcome, while maximax selects the alternative with the highest possible payoff.

Related: Uncertainty, Expected value
Value at risk

A statistical measure of the maximum loss expected over a defined period at a given confidence level, used to express exposure to adverse movements in a single figure.

Related: Risk, Sensitivity analysis