CISA flashcards
CISA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Audit risk model
- Audit risk equals inherent risk multiplied by control risk multiplied by detection risk; detection risk is the only element the auditor controls, and it decreases as substantive testing increases.
- Compliance testing purpose
- Compliance testing determines whether a control exists and operates as designed throughout the period; substantive testing instead verifies the completeness, accuracy and validity of transactions or balances directly.
- Audit evidence sufficiency
- Sufficiency is the quantity of evidence needed to support a conclusion; appropriateness is its relevance and reliability. Evidence obtained directly by the auditor is more reliable than management representations.
- Audit charter
- A board or audit-committee-approved document defining the internal audit function's authority, scope, responsibilities and reporting lines, granting access to records and personnel, and underpinning auditor independence.
- Integrated test facility
- A computer-assisted audit technique that inserts a fictitious entity into a live production system so test transactions are processed alongside real ones and results are compared with expected output.
- Audit finding components
- A finding states the criteria (the standard), condition (what exists), cause, effect or risk, and a recommendation; management then provides a response with an owner and target remediation date.
- Governance versus management
- Governance evaluates, directs and monitors IT on behalf of stakeholders through the board; management plans, builds, runs and monitors IT activities within the direction that governance sets.
- IT steering committee
- A group of senior business and IT executives that prioritizes IT investments, allocates resources, resolves cross-functional issues and monitors project, service and risk performance.
- KGI versus KPI
- Key goal indicators measure whether intended business outcomes were achieved after the fact; key performance indicators measure how well an enabling process is currently performing.
- IT balanced scorecard
- A performance framework with financial, customer, internal process, and learning and growth perspectives, adapted for IT to show IT's contribution to business value and user satisfaction.
- Data owner and custodian
- The data owner, usually a business manager, classifies information and authorizes access; the data custodian, usually in IT, implements and administers the technical safeguards that protect it.
- User acceptance testing
- Testing performed and formally signed off by business users to confirm the system meets documented requirements; the auditor reviews coverage, defect closure and sign-off evidence rather than executing tests.
- Cost performance index
- Earned value divided by actual cost. A CPI below 1 means the project is over budget; a schedule performance index below 1 means the project is behind schedule.
- Critical path
- The longest sequence of dependent project activities, having zero float; any delay to an activity on the critical path delays the entire project completion date.
- Parallel changeover
- Old and new systems run simultaneously for a period and outputs are reconciled. It offers the highest confidence at the highest cost and suits high-risk conversions.
- Developer production access
- Developers should not be able to promote their own code into production; a separate release or operations function moves only tested, independently approved changes into the live environment.
- Post-implementation review
- A structured assessment after the system has stabilized, confirming that project objectives and expected benefits were achieved and identifying remaining issues and lessons learned.
- Recovery time and point objectives
- RTO is the maximum acceptable restoration time; RPO is the maximum acceptable data loss measured in time before the outage. RTO must fall within the maximum tolerable downtime.
- Business impact analysis
- The first continuity planning step: it identifies critical processes, dependencies and the escalating impact of an outage over time, producing recovery priorities, RTOs and RPOs.
- Differential backup
- Copies all files changed since the last full backup and does not reset the archive bit; restoration needs the last full backup plus only the most recent differential.
- Incremental backup
- Copies only data changed since the most recent backup of any type and resets the archive bit; restoration requires the last full backup plus every incremental taken since then, in order.
- Hot site
- A fully equipped alternate processing facility with current mirrored data and ready hardware, providing near-zero recovery time at the highest ongoing subscription cost.
- Full interruption test
- A disaster recovery test that shuts down the primary site and processes work at the alternate site; it is the most realistic and riskiest test and follows simpler tests.
- Incident versus problem management
- Incident management restores normal service as quickly as possible, often through a workaround; problem management then investigates root cause to prevent recurrence.
- Crossover error rate
- The point at which a biometric system's false acceptance rate equals its false rejection rate; a lower crossover error rate indicates a more accurate and better-balanced device.
- Digital signature
- A message hash encrypted with the sender's private key. It provides integrity, origin authentication and nonrepudiation, but because the message stays readable it gives no confidentiality.
- Mandatory access control
- A model in which the system enforces access based on security labels on objects and clearances held by subjects; users cannot change or delegate those permissions themselves.
- Order of volatility
- Evidence collection sequence from most to least volatile: processor registers and cache, RAM, swap and temporary files, disk storage, logs, then backups and archival media.
- Chain of custody
- An unbroken documented record of who collected, handled and analysed evidence, and when and why, required to demonstrate integrity and make evidence admissible in proceedings.
- IDS versus IPS
- An intrusion detection system monitors traffic passively and raises alerts; an intrusion prevention system is deployed inline and can automatically block or drop malicious traffic in real time.
- Asymmetric encryption use
- A public key encrypts and the matching private key decrypts, solving key distribution; because it is slow, it typically wraps a symmetric session key in hybrid encryption.
- Data remanence
- Residual data left on media after deletion or formatting; only clearing, purging such as degaussing, or physical destruction reliably removes it before disposal or reuse.