The Cisco Designing Cisco Data Center Infrastructure (DCID) 300-610 exam is a concentration exam within the Cisco Certified Network Professional (CCNP) Data Center certification track. It validates the skills required to design Cisco data center solutions, including network, compute, storage network, network services, and infrastructure automation. This exam is intended for data center engineers, solution designers, and architects who translate business requirements into validated designs using Cisco technologies such as Cisco Nexus switches, Cisco UCS, and Cisco ACI. The exam covers five domains: Data Center Network Design (25%), Data Center Compute Design (20%), Data Center Storage Network Design (20%), Data Center Network Services Design (15%), and Data Center Infrastructure and Automation Design (20%). The Cisco DCID 300-610 case studies are 5 cases and about 2,501 words.
1EVPN Multi-Site Jumbo Frame Drops After Border Leaf Addition
An enterprise operates two data centers: DC-A with 24 Nexus 9336C-FX2 leaf switches in 12 vPC pairs and DC-B with 12 leaf switches in 6 pairs. Both sites use OSPF underlay and eBGP EVPN overlay; each site has two border gateways.
520 words, about 3 min2UCS Fabric Failover and Uplink Oversubscription in a 32-Blade Cluster
A company runs 32 Cisco UCS B200 M6 blades in four 5108 chassis, managed by two Fabric Interconnects in cluster mode. Each blade has a VIC 1440 with two 25-GbE ports to the FIs.
615 words, about 3 min3Slow-Drain and ISL Oversubscription in a Core-Edge Fibre Channel SAN
A financial services firm runs two independent SAN fabrics, A and B. Each fabric has two Cisco MDS 9396S core switches and four edge switches.
445 words, about 2 min4Stateful Firewall Insertion with Asymmetric Return Traffic in ACI
A media company runs a Cisco ACI fabric with three spines and six leaves. A three-tier web application is being migrated from a legacy VLAN design.
468 words, about 2 min5Zero-Touch Provisioning with POAP, NX-API, and Config Compliance
A service provider is deploying 40 Cisco Nexus 93180YC-FX leaf switches in a new pod. The current process uses a spreadsheet and manual console configuration.