Takt time
Available production time divided by customer demand for the same period. It sets the pace the process must meet, independent of machine capability or staffing.
Little's Law
Lead time equals work in process divided by throughput. At constant throughput, cutting WIP is the fastest way to shorten lead time.
Three Ms of waste
Muda (non-value-adding activity), mura (unevenness in volume or mix), and muri (overburden of people or equipment). Mura and muri typically create muda.
Jidoka
Automation with a human touch: the process detects an abnormality and stops, so the problem is fixed at the source instead of passing downstream.
Heijunka
Leveling production by volume and by product mix over time. It is the foundation that lets just-in-time and jidoka work without firefighting.
Value stream map
A visual map of material and information flow from customer to supplier, with process boxes, inventory triangles, and a timeline ladder showing lead time.
Rolled throughput yield
The product of first-pass yields at each step in a process. Five steps at 95 percent each give about 77 percent overall yield.
Process cycle efficiency
Value-added time divided by total lead time. Service and office streams commonly run below five percent, exposing queue time as the main loss.
Pacemaker process
The most downstream process that can be scheduled. It sets the pace for the whole value stream, and everything upstream is pulled from it.
Future state map
A map of the intended flow after improvement. It answers takt time, where continuous flow applies, where supermarkets pull, and where the pacemaker sits.
Kaizen versus kaikaku
Kaizen is incremental, participative, low-capital improvement; kaikaku is radical redesign. Both follow PDCA but differ in scope and cycle time.
Five Whys
Repeatedly asking why a problem occurs until a systemic cause is reached. Each answer must move deeper into the mechanism, not toward blaming a person.
Overprocessing waste
Work the customer would not pay for: tighter tolerances than needed, redundant approvals, duplicate data entry, and reports nobody acts on.
Overproduction
Making more, earlier, or faster than the next process needs. It is considered the worst waste because it hides the other six and consumes capacity.
Countermeasure verification
Comparing a before and after measure at the same point in the process. Without a measure, a change is an opinion rather than an improvement.
Kanban rules
The downstream process withdraws; upstream produces only what was withdrawn; no kanban means no production; a kanban always travels with its part.
FIFO lane
A capacity-limited sequence lane between processes. It caps inventory physically and preserves order, used where a supermarket is not justified.
Heijunka box
A scheduling board with time slots and kanban slots that levels both volume and mix. It protects upstream processes from demand spikes.
SMED
Single-minute exchange of die: separate internal from external setup, convert internal to external, then streamline both. Single minute means under ten minutes.
Minimum station count
Total work content divided by takt time, rounded up. It is the theoretical minimum number of stations for a balanced line.
Andon
A visual signal that calls for help and can stop the line when an abnormality occurs. Stopping is expected behavior, not a failure.
Poka-yoke
Error proofing that prevents a mistake from being made or from passing to the next step. Contact, fixed-value, and motion-step devices are the main types.
Containment versus corrective action
Containment protects the customer immediately by sorting and quarantining; corrective action removes the root cause and updates the standard.
Three root cause levels
Occurrence (why it happened), detection (why it escaped), and systemic (why the system allowed it). Each level needs its own countermeasure.
SDCA cycle
Standardize, do, check, act. It stabilizes a process before the next PDCA improvement turn, so gains are held rather than lost.
Standard work elements
Takt time, work sequence, and standard in-process stock. All three are required; a document missing one is not a valid standard.
Standard work combination sheet
A chart plotting manual, machine, and walking time for each step against takt time, used to see imbalance and waiting within a cycle.
Five S
Sort, set in order, shine, standardize, sustain. The first three change the physical workplace; the last two are the management system that holds it.
Visual management rule
The normal condition must be visible at a glance, and any deviation must be obvious without asking anyone. Every signal needs a defined response.
Leader standard work
An explicit, auditable routine for leaders, such as gemba walks, huddles, and problem reviews. It is the mechanism that prevents improvement gains from decaying.
Catchball
Iterative give-and-take between management levels while plans are formed. It aligns targets with reality and builds ownership before execution begins.
Hoshin kanri
Strategy deployment that links long-term direction to annual targets to daily management. The X-matrix records objectives, targets, priorities, and owners in one view.
A3 thinking
A one-page problem or proposal format covering background, current state, goal, analysis, countermeasures, plan, and follow-up. The page limit forces clear thinking.
OEE
Overall equipment effectiveness equals availability times performance times quality. Measuring the three factors separately shows where the loss occurs.
Inventory turns
Cost of goods sold divided by average inventory value. Days of inventory equals 365 divided by turns.