CMRP · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Overall Equipment Effectiveness
OEE equals Availability times Performance times Quality. Availability compares operating time to planned production time; Performance compares actual output to theoretical; Quality compares good units to total units produced.
Return on Investment
ROI equals gain from an investment minus its cost, divided by that cost. It lets managers rank competing reliability projects on a common percentage basis.
Life-cycle cost
The total cost of an asset across acquisition, installation, operation, maintenance, and disposal. It reveals that a low purchase price can be outweighed by high operating cost.
Process capability index Cpk
Cpk equals the smaller distance from the process mean to either specification limit, divided by three sigma. It falls when a process is off-center even if its spread is acceptable.
Poka-yoke
An error-proofing device or design that prevents a mistake from being made or makes it immediately obvious. Examples include fixtures that only accept correct orientation and gauges that block out-of-spec parts.
Statistical process control
Using control charts to separate common-cause variation from special-cause variation. A process must be in control before capability indices are meaningful for predicting defects.
Mean time between failures
Total operating time divided by the number of failures over a defined period. It applies to repairable assets and requires a clear definition of what counts as a failure.
Bathtub curve
A failure-rate curve with three regions: decreasing infant mortality, constant random failures during useful life, and increasing wear-out failures. It guides whether replacement or condition monitoring makes sense.
Weibull shape parameter
The beta value in a Weibull distribution. Beta below one indicates infant mortality, near one indicates random failures, and above one indicates wear-out, which supports age-based replacement.
Reliability block diagram
A model of how component reliability combines at the system level. Series paths multiply reliabilities and reduce system reliability; parallel redundant paths increase it.
Root cause analysis
A structured method such as 5 Whys, fishbone, or fault tree used to find physical, human, and latent system causes of a failure, rather than stopping at the symptom.
Span of control
The number of direct reports assigned to one supervisor. Wide spans lower overhead cost but reduce coaching time and can dilute accountability for asset performance.
Change management
A structured approach to moving an organization from current to desired practice. It typically includes building a guiding coalition, communicating the reason, and locking in gains.
Reliability culture
The shared behaviors and priorities that determine whether reliability is protected when schedule pressure appears. It is evidenced by decisions and metrics, not by slogans or posters.
Work order lifecycle
The sequence from request through screening, planning, scheduling, execution, and closeout. Closeout must capture labor, parts, and failure codes so history stays useful.
Schedule compliance
The percentage of scheduled jobs completed in the week they were scheduled. It measures whether planning and scheduling are respected and is a common leading indicator.
Maintenance backlog
The amount of ready, approved work waiting to be scheduled, usually expressed in crew-weeks. A backlog of roughly two to four weeks absorbs variation without hiding problems.
Work order priority
A ranking based on consequence to safety, environment, production, and cost. It should be assigned by defined rules rather than by who requests the work most loudly.
Predictive maintenance
Condition-based maintenance that measures equipment parameters such as vibration, temperature, oil chemistry, or ultrasound, and triggers work when a limit or trend indicates developing failure.
P-F interval
The time between the first detectable potential failure and functional failure. Inspection frequency for condition monitoring should be a fraction of this interval.
Vibration analysis
A condition-monitoring technique that identifies imbalance, misalignment, looseness, and bearing defects from measured frequency signatures. Trending against a baseline matters more than a single reading.
PM optimization
A review that removes preventive tasks that do not address a credible failure mode. It reduces over-maintenance, which otherwise consumes capacity and can introduce infant mortality.
Economic order quantity
EOQ equals the square root of two times annual demand times order cost, divided by annual holding cost per unit. It balances ordering cost against inventory holding cost.
Safety stock
Extra inventory held to cover variation in demand and lead time. Higher target service levels require larger safety stock, which raises holding cost.
ABC inventory classification
A ranking of stocked items by annual usage value. A items justify tight control and frequent counting; C items can use simple periodic review.
Cycle counting
Counting a small number of inventory items frequently instead of one annual wall-to-wall count. High-value A items are counted most often to keep records accurate.
Training needs analysis
A comparison of required competencies to current capability at organization, job, and individual levels. It targets training investment where the performance gap is largest.
Kirkpatrick evaluation levels
Four levels of training evaluation: reaction, learning, behavior, and results. Only behavior and results demonstrate that training changed on-the-job performance.
Hierarchy of controls
A ranking of hazard controls from most to least effective: elimination, substitution, engineering controls, administrative controls, and personal protective equipment last.
Lockout tagout
A procedure that isolates all energy sources, verifies zero energy, and applies a personal lock for each worker before maintenance begins on the equipment.
Total recordable incident rate
Recordable cases multiplied by 200,000, divided by total hours worked. The 200,000 factor normalizes the rate to a standard base of one hundred full-time workers.
PDCA cycle
Plan, Do, Check, Act. The Act step standardizes the successful change so the improvement is sustained rather than eroding after the project ends.
Value stream mapping
A visual map of process steps that separates value-added from non-value-added activity. It quantifies total lead time against actual process time to expose waiting and inventory.