Grade-2 Cost Engineer (China) cheat sheet
Grade-2 Cost Engineer (China) · Keep the key ideas within reach.
Integrated built-environment foundations
Define scope and measurement rules before calculating or pricing.
Distinguish markup, margin, cash movement and expense.
Use dependencies and real prerequisites when reviewing a schedule.
Separate measured work from contractual entitlement.
State the system boundary and assumptions before calculation.
Units, sign conventions and uncertainty are part of the answer.
Verification against a specification differs from validation for an intended use.
Drawings need a declared convention and controlled revision.
Classroom models do not authorize physical operation or structural approval.
R=d/λ uses thickness in metres; total resistance includes the model’s surfaces and layers.
U=1/R_total is a steady-state element model, not the complete building energy demand.
Permanent, occupancy, wind and snow actions require the stated design framework.
Moisture, airtightness and intended ventilation must be considered together.
Example tie spacing is supplied data, not a code rule.
Clarify actual responsibility, approved drawings and change authority.
Hazards require task-specific controls, not one universal PPE recipe.
Inspect concealed requirements before they become inaccessible.
Separate net quantities, stated allowances and unresolved handover issues.