Grade-2 Cost Engineer (China) · Keep the key ideas within reach.

Quick reference

Integrated built-environment foundations

  • Define scope and measurement rules before calculating or pricing.

  • Distinguish markup, margin, cash movement and expense.

  • Use dependencies and real prerequisites when reviewing a schedule.

  • Separate measured work from contractual entitlement.

  • State the system boundary and assumptions before calculation.

  • Units, sign conventions and uncertainty are part of the answer.

  • Verification against a specification differs from validation for an intended use.

  • Drawings need a declared convention and controlled revision.

  • Classroom models do not authorize physical operation or structural approval.

  • R=d/λ uses thickness in metres; total resistance includes the model’s surfaces and layers.

  • U=1/R_total is a steady-state element model, not the complete building energy demand.

  • Permanent, occupancy, wind and snow actions require the stated design framework.

  • Moisture, airtightness and intended ventilation must be considered together.

  • Example tie spacing is supplied data, not a code rule.

  • Clarify actual responsibility, approved drawings and change authority.

  • Hazards require task-specific controls, not one universal PPE recipe.

  • Inspect concealed requirements before they become inaccessible.

  • Separate net quantities, stated allowances and unresolved handover issues.