Registered Electrical Engineer - Supply & Distribution (China) - independent technical foundations study materials
Registered Electrical Engineer - Supply & Distribution (China) - independent technical foundations study resources

Registered Electrical Engineer - Supply & Distribution (China) - independent technical foundations cheat sheet

Registered Electrical Engineer - Supply & Distribution (China) - independent technical foundations · Keep the key ideas within reach.

Quick reference

Phasors, complex power and three-phase engineering models

  • Identify RMS, phase connection, balance and waveform assumptions.

  • Add impedances as complex quantities rather than add their magnitudes.

  • Complex power uses the conjugate of the current phasor.

  • Displacement-factor correction does not eliminate every harmonic issue.

  • Convert per-unit quantities to a consistent stated base.

Quick reference

Transformers, machines and distribution-system reasoning

  • Demand assumptions and nameplate totals describe different quantities.

  • Real transformers require losses, impedance and actual ratings.

  • State whether a speed formula uses poles or pole pairs.

  • An additional source changes fault and operating conditions as well as reliability.

  • Evaluate lifecycle behavior rather than one component efficiency or initial cost.

Quick reference

Fault models, protective coordination and earthing concepts

  • Separate prospective fault current, load current and device rating.

  • Use the proper balanced or unbalanced fault model.

  • An RCCB alone is not overcurrent protection.

  • Nominal device ratios do not by themselves prove selectivity.

  • Earthing does not guarantee zero touch voltage.

Quick reference

Installation planning, measurement and evidence of compliance

  • Cable selection needs installation conditions and several distinct checks.

  • Control drawing revisions and review material field changes.

  • Continuity, insulation, polarity and protection tests are not interchangeable.

  • An indicator or switch label does not prove absence of every source.

  • Record actual evidence, limitations and unresolved defects.

Quick reference

Measurement, feedback, PLC and automation

  • Sensitivity = Δoutput/Δinput; resolution = smallest detectable change

  • Closed-loop error compares reference and measurement; integral action can remove appropriate steady-state error only under suitable stability and operating assumptions.

  • PLC scan: read inputs → run program → update outputs

  • 4–20 mA live zero: (I − 4)/16 of the span

  • Repeatability ≠ accuracy, resolution ≠ sensitivity

  • Robot DOF come from its joints; workspace is the reachable volume

Quick reference

Lighting models, metering and building-control integration

  • Lumens, lux, luminance and watts are different quantities.

  • A lumen-method calculation uses the explicitly stated factors.

  • Compare energy measures with a defined operating baseline.

  • A command and a verified physical state are different evidence.

  • Ordinary BMS integration does not create life-safety approval.

Quick reference

Engineering models, drawings, evidence and project decisions

  • State the system boundary and assumptions before calculation.

  • Units, sign conventions and uncertainty are part of the answer.

  • Verification against a specification differs from validation for an intended use.

  • Drawings need a declared convention and controlled revision.