Equipment Supervision Engineer flashcards
Equipment Supervision Engineer · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Young's modulus
- Ratio of tensile stress to tensile strain in the linear elastic region of a stress–strain curve; it measures material stiffness and is the slope of that linear segment.
- Yield strength
- Stress at which a material begins permanent plastic deformation, determined by the 0.2% offset method when no distinct yield point appears on the curve.
- Weld joint efficiency
- Factor applied to allowable stress in pressure equipment design to account for reduced strength at welded seams; its value depends on the extent of radiographic examination.
- RSS tolerance stack-up
- Statistical tolerance accumulation computed as the square root of the sum of squared individual tolerances, assuming independent random deviations; gives a smaller allowance than worst-case summation.
- Supervision plan
- Overall document prepared by the chief supervision engineer and approved by the supervising entity's technical director before work starts, defining scope, organization, and control measures.
- Supervision implementation rules
- Detailed document written by the specialized supervision engineer for high-risk or specialized works, approved by the chief supervision engineer, and specifying control points and inspection methods.
- Hold point
- A designated stage where the contractor may not proceed until the supervisor has inspected and signed off; proceeding without sign-off is a reportable violation.
- Work suspension order
- Formal instruction halting work for serious quality or safety hazards, reported to the owner and lifted only after verified rectification of the stated cause.
- Mandatory standards precedence
- Compulsory code clauses for equipment and pressure systems override conflicting contract terms; any agreement below the mandatory minimum is void and unenforceable.
- Supervisor signature liability
- Signing an acceptance document certifies verified conformity with contract and code; signing without actual verification creates personal and entity liability for resulting defects.
- Conflict of interest disclosure
- Duty to declare and avoid any financial or personal interest in contractors, suppliers, or subcontractors on a supervised project, including gifts and gratuities.
- Confidentiality obligation
- Prohibition on disclosing or reusing the owner's technical data, process parameters, and commercial terms learned during supervision without the owner's consent.
- NDT method selection
- Rule matching method to flaw type: radiography for internal volumetric flaws, ultrasonic for internal planar flaws, penetrant for surface flaws, magnetic particle for ferromagnetic surface flaws.
- First article inspection
- Full verification of a first production unit against drawings and specifications, confirming that the manufacturing process can produce conforming parts before mass production begins.
- WPS and PQR
- Welding procedure specification plus its supporting procedure qualification record; production welding must follow a qualified WPS verified before manufacturing starts.
- Nonconformity disposition
- Classification of a nonconforming item as rework, repair, use-as-is under concession, or scrap; repairs affecting strength require design authority approval.
- Bid validity period
- Time during which a bidder is bound by its bid; the owner may request extension, and a bidder refusing extension may withdraw without forfeiting the bid bond.
- Performance bond
- Guarantee, usually five to ten percent of contract price, securing the supplier's performance; the owner may claim against it for uncorrected default.
- Lump-sum contract
- Fixed total price for a defined scope; quantity and cost risk rest with the supplier, so scope definition must be complete before award.
- CIF Incoterm
- Seller delivers goods on board and pays freight plus insurance to the named destination port; risk transfers to the buyer at the ship's rail.
- Claim notice time bar
- Contractual deadline, commonly twenty-eight days after the triggering event, within which a claim must be notified; late notice may extinguish the claim entirely.
- Foundation handover check
- Verification of elevation, centerline, anchor-bolt positions, and concrete strength records against the equipment general arrangement drawing before installation begins.
- Soft-foot check
- Verification that all machine feet seat evenly on the baseplate without induced strain; performed before final shaft alignment and grouting.
- Commissioning sequence
- Progressive testing order: single-machine no-load, single-machine load, linked no-load, linked load, then performance test, each stage gated by satisfactory results.
- Punch list closure
- Tracking of outstanding installation items with responsible party and due date; all items must be closed and re-verified before final acceptance is granted.
- Total float
- Time an activity may be delayed without delaying project completion; equals late start minus early start, or late finish minus early finish.
- Critical path
- Sequence of activities with zero total float; any delay on this path extends project completion by an equal amount unless compression is applied.
- Cost variance
- Earned value minus actual cost; a positive value indicates the work performed cost less than budgeted, a negative value indicates overrun.
- Schedule performance index
- Earned value divided by planned value; a value below one indicates the project is behind the planned schedule at the measurement date.
- Risk scoring
- Risk level computed as likelihood multiplied by severity, then located on a matrix classifying it as unacceptable, tolerable under ALARP, or broadly acceptable.
- MTBF and availability
- Mean time between failures equals operating time divided by failure count; availability equals MTBF divided by the sum of MTBF and mean time to repair.
- Hazardous area zones
- Classification of explosive atmospheres: gas zones 0, 1, 2 and dust zones 20, 21, 22 by frequency and duration of the hazardous atmosphere.
- Concurrent delay
- Overlapping owner-caused and contractor-caused delay; generally neither party obtains time extension or compensation for the overlapping period under most standard contracts.