Quick reference

Water Resources and Environmental engineering models and applications

  • Use the correct rational-method unit conversion and an appropriate stated rainfall-intensity duration.

  • Manning's equation uses hydraulic radius A/P, not flow depth

  • Partial-full circular pipe flow can exceed full-flow velocity

  • Removal efficiency compares influent and effluent concentrations

  • Time of concentration sets the rainfall intensity duration

Quick reference

Water supply, wastewater treatment and service boundaries

  • Physical removal and disinfection perform complementary functions.

  • Hydraulic and solids retention times are distinct.

  • Nitrification alone does not guarantee total nitrogen removal.

  • Mass-loading calculations require consistent flow and concentration units.

  • A hypothetical calculation is not a current water-quality or fire-service requirement.

Quick reference

Geotechnical engineering models and applications

  • Effective stress equals total stress minus pore pressure

  • Use buoyant unit weight below the water table

  • Drained versus undrained strength depends on loading rate and permeability

  • USCS classification depends on grain size and plasticity

  • Active, at-rest, and passive earth pressures are distinct conditions

Quick reference

Construction engineering models and applications

  • Total float preserves the stated project finish; free float preserves successor early starts.

  • Bank, loose, and compacted volumes use swell and shrinkage separately

  • Critical path can shift after logic or duration changes

  • Crane capacity must be checked at the actual operating radius

  • Unit-price contracts pay by measured quantity; lump-sum pays for the scope