CO Well Driller flashcards
CO Well Driller · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Grout water ratio
- Neat cement grout uses no more than 6 gallons of clean water per 94-lb sack to keep slurry dense enough to seal the annulus and resist shrinkage and cracking.
- Tremie placement
- Grout is pumped through a pipe whose discharge end stays submerged in the rising grout column, placing seal material from the bottom up without voids.
- Minimum grout annulus
- The annular space between borehole wall and casing must be at least 2 inches thick so the seal performs as designed; thinner annuli fail to meet rule.
- Sanitary well seal
- A watertight, vermin-proof cap or seal at the casing top that excludes surface water, insects, and debris while allowing venting and access to the well.
- Well yield test
- A pump or bailer test, commonly 8 hours, that records static level, pumping level, drawdown, and recovery so sustainable yield can be documented on the well log.
- Setback distances
- State minimum horizontal separations, typically 50 ft from septic tanks and sewer lines and 100 ft from drainfields, protect the well from contamination sources.
- Thermally enhanced grout
- Bentonite or cement grout blended with silica sand or graphite to raise thermal conductivity, improving heat transfer between loop pipe and formation while sealing the borehole.
- Grout volume per foot
- Annular volume equals borehole area minus pipe area; a 5-inch hole with 1.25-inch pipe holds about 0.11 cubic feet of grout per linear foot.
- Loop pressure test
- The closed-loop pipe is pressurized to 1.5 times maximum operating pressure, at least 100 psi, and held 15 minutes before grouting and again before trench backfill.
- Thermal response test
- An in-situ test that circulates heated fluid through a test borehole to measure formation thermal conductivity and borehole resistance for accurate loop-field sizing.
- Borehole spacing
- Vertical loop boreholes are commonly spaced 15-20 ft apart to limit thermal interference between adjacent boreholes over the life of the system.
- Abandoned borehole grouting
- Unused or failed loop boreholes must be grouted full length with low-permeability grout to prevent aquifer cross-connection and vertical groundwater movement.
- Pump setting depth
- The submersible pump is set below the pumping water level and at least 5-10 ft above the screen or well bottom to avoid cavitation and sediment intake.
- Pump capacity versus yield
- A pump rated above well yield lowers the water level to the intake, causing cycling, overheating, and motor failure; capacity must not exceed sustainable yield.
- Pressure tank precharge
- Air charge in the tank is set 2 psi below the pump cut-in pressure, for example 28 psi for a 30/50 pressure switch, to maximize drawdown.
- Total dynamic head
- TDH equals static lift plus drawdown plus friction loss plus discharge pressure head; pump selection uses TDH and required flow on the pump curve.
- Voltage drop limit
- Conductor sizing keeps voltage drop on the pump circuit under 5 percent, using manufacturer ampacity and distance tables rather than generic wire charts.
- Pitless adapter
- A fitting that carries the service line through the casing below frost line, allowing the drop pipe to be removed without excavating the service line connection.
- Torque arrestor
- A rubber device on the drop pipe that cushions starting torque and centers the pump assembly, protecting pipe and wire in deep submersible installations.
- Surety bond requirement
- A financial assurance instrument, commonly $10,000-$25,000, kept in force while licensed so the state can fund proper well closure if the licensee defaults.
- License renewal cycle
- Licenses are typically renewed every 2 years, and continuing education hours must be completed before the deadline or the license lapses.
- Responsible managing employee
- The licensed individual designated by a contracting business who exercises direct supervision over well construction work and whose departure must be reported to the state.
- Non-transferable license
- A license belongs to the named individual or business entity and cannot be sold or assigned; a change of ownership requires a new license application.
- Record retention
- Well logs, grout records, and pump installation records must be kept for the period set by rule, commonly 3-5 years, and produced on request during inspection.
- Unlicensed practice
- Constructing or installing wells without a valid license is a violation, and both the individual worker and the contracting business may be penalized separately.
- CE hour credit
- One continuing education hour is credited per contact hour of approved instruction; a 2-year cycle commonly requires 16-24 hours with a minimum in construction topics.
- CE carryover limit
- Excess continuing education hours from one renewal cycle may be carried forward only up to a set cap, typically 50 percent of the next cycle requirement.
- CE certificate contents
- Completion certificates must show licensee name, course title, date, hours, and provider approval number, and must be retained for audit by the licensing agency.
- Contamination notification
- A licensee who discovers contamination or a failed well must notify the state and affected water user within the required time, commonly 24-48 hours.
- Shock chlorination
- The well is dosed to 100-200 ppm chlorine, held 12-24 hours, then flushed until residual falls below the potable limit before a bacteriological sample is taken.
- Bacteriological sampling
- Samples are collected in sterile bottles after disinfection and flushing and submitted to a certified lab; a repeat-positive result requires further corrective action.
- Well abandonment
- The full well bore is filled with approved grout or sealing material and capped, and the abandonment record is filed with the state to close the permit.