Quick reference

Erosion Control Principles and Practices

  • USLE/RUSLE: A = R × K × LS × C × P, where R is rainfall erosivity, K soil erodibility, LS slope length-steepness, C cover-management, and P support practice.

  • Detachment, transport, and deposition are the three erosion phases; control works by reducing raindrop impact, slowing runoff, increasing infiltration, or covering soil.

  • Raindrop impact is the dominant detachment mechanism on bare construction soil; mulch or blankets intercept impact and reduce soil loss.

  • The LS factor is nonlinear: doubling slope length increases LS by roughly 1.4 to 1.5 times, while doubling steepness increases LS much more.

  • A bare-soil C factor is about 1.0; dense vegetation or anchored mulch can reduce C below 0.01, lowering predicted soil loss by two orders of magnitude.

  • Erosion begins when applied bed shear τ = γRS exceeds the soil or lining critical shear stress; vegetation and riprap raise critical shear.

  • Sheet flow needs surface cover or flow-spreading devices; concentrated flow needs channel linings, check dams, turf reinforcement mats, or riprap.

  • Temporary stabilization should be initiated promptly after disturbance and completed within permit deadlines; exposed inactive areas are highest risk.

  • Track walking, roughing, and contouring reduce runoff velocity and increase infiltration, but do not replace cover on steep or long slopes.

Quick reference

Sediment Control Practices

  • Silt fence is a perimeter sediment barrier for sheet flow; it is not a filter for concentrated flow in ditches or channels.

  • Install silt fence on the contour with a keyed, compacted trench and posts on the downhill side so water ponds and deposits sediment before release.

  • Sediment basins remove particles by gravity settling; efficiency rises with basin surface area, residence time, and a skimmer or slow dewatering outlet.

  • Check dams reduce velocity and grade in swales; space them so the crest of a downstream dam is near the toe elevation of the upstream dam.

  • Storm drain inlet protection must prevent sediment entry without causing unacceptable flooding; inspect and clean before sediment reaches the inlet throat.

  • Anionic polyacrylamide (PAM) flocculates suspended clay; it requires site-specific dosing and often gypsum where soils are sodic or high in sodium.

  • Turbidity is an optical measure and TSS is a gravimetric mass concentration; the two are related but not directly convertible without site calibration.

  • Vegetated filter strips rely on sheet flow, infiltration, and deposition; channelized flow or concentrated discharge bypasses their treatment capacity.

  • Sediment traps are small temporary basins for limited drainage areas; larger disturbed areas require sediment basins designed with adequate storage.

Quick reference

Hydrology and Hydraulics

  • Rational method: Q = C i A; C is runoff coefficient, i is rainfall intensity for the time of concentration, and A is drainage area; it is limited to small catchments.

  • Kirpich time of concentration (English units): Tc = 0.0078 L^0.77 S^-0.385, with L in feet, S in ft/ft, and Tc in minutes.

  • Manning equation (English): V = (1.486/n) R^(2/3) S^(1/2), and Q = V A; R is hydraulic radius and S is energy slope.

  • Continuity: Q = V A; for a given discharge, narrowing a channel increases velocity and usually increases erosive shear.

  • Froude number Fr = V / sqrt(gD); Fr < 1 is subcritical, Fr = 1 critical, and Fr > 1 supercritical flow.

  • A hydraulic jump converts supercritical flow to subcritical flow and dissipates energy; it is often forced below culvert outlets and drop structures.

  • Average boundary shear stress τ = γ R S; compare it with permissible shear stress to select stable channel linings.

  • NRCS curve number runoff depth (inches): Q = (P − 0.2S)^2 / (P + 0.8S) for P > 0.2S, where S = 1000/CN − 10.

  • Design storms are selected by permit or local criteria using intensity-duration-frequency data; peak flow and runoff volume may require different storm durations.

Quick reference

Soils and Soil Science Fundamentals

  • USDA particle-size classes: clay < 0.002 mm, silt 0.002–0.05 mm, and sand 0.05–2.0 mm; texture is read from the soil texture triangle.

  • Cation exchange capacity (CEC) is highest in clay and organic matter; it increases retention of cations and some contaminants.

  • The soil erodibility factor K is generally highest for silt loam and fine sandy loam and lower for well-aggregated or very sandy soils.

  • Sodic soils have high sodium adsorption ratio or exchangeable sodium percentage; clay disperses, surface sealing occurs, and infiltration drops.

  • Gypsum (calcium sulfate) can improve sodic soil structure by supplying calcium that replaces sodium on exchange sites.

  • Bulk density is dry soil mass divided by total volume; compaction raises bulk density and lowers porosity, infiltration, and root growth.

  • Hydrologic soil groups range from A (high infiltration, low runoff) to D (low infiltration, high runoff); group D includes clays and shallow restrictive layers.

  • Stokes' law shows that larger and denser particles settle faster; clay-sized particles need flocculation or long residence time to settle.

  • Organic matter improves aggregation, infiltration, and water-holding capacity and lowers erodibility when maintained at adequate levels.

Quick reference

Regulatory Framework and Permitting

  • Clean Water Act Section 402 establishes the NPDES stormwater permit program; Section 404 regulates dredged or fill material in waters of the United States.

  • Section 401 water quality certification is required for federal permits that may discharge into waters of the United States; the state or tribe issues it.

  • Construction general permits typically cover disturbances of one acre or more, or smaller sites part of a common plan of development that totals one acre or more.

  • Permit coverage commonly requires a Notice of Intent before discharge and a Notice of Termination after final stabilization.

  • A SWPPP must identify pollutant sources, describe BMPs, and include inspection, maintenance, recordkeeping, and training requirements.

  • Municipal separate storm sewer system (MS4) permits require construction-site runoff controls as one minimum control measure.

  • Total maximum daily loads (TMDLs) can set wasteload allocations that impose additional numeric or practice-based limits on construction stormwater.

  • Local grading, erosion, and sediment control permits may be stricter than federal requirements; the project must satisfy all applicable authorities.

  • Endangered species and historic preservation reviews can add conditions or prohibitions to a stormwater permit.

Quick reference

Stormwater Pollution Prevention Plan Development and Review

  • A SWPPP is site-specific: it describes the site, construction activities, pollutant sources, selected BMPs, inspection schedule, and responsible parties.

  • Use a pollution-prevention hierarchy: eliminate exposure first, then control runoff, then trap sediment, and finally treat remaining discharge.

  • Concrete washout, fuel storage, sanitary facilities, and material stockpiles are common pollutant sources that need dedicated controls in the SWPPP.

  • The SWPPP must be updated when site conditions, construction sequencing, or BMPs change enough to affect pollutant discharges.

  • Inspection records should identify BMPs checked, observed deficiencies, corrective actions, and the date and time of completion.

  • Corrective actions should be initiated promptly and completed within the permit deadline; infeasible deadlines must be documented with a schedule.

  • Final stabilization means uniform perennial vegetation or equivalent permanent cover, not merely temporary mulch, unless the permit allows otherwise.

  • Post-construction controls may include detention, infiltration, filtration, or treatment practices to manage runoff after construction.

  • Keep the SWPPP and inspection records available on site or at a designated location as required by the permit.

Quick reference

Installation, Inspection, and Maintenance

  • Silt fence fabric should be buried in a keyed trench, attached securely to posts, and inspected for undercutting, tears, and sediment buildup.

  • Erosion control blankets are anchored in a terminal trench, overlapped according to manufacturer direction, and stapled to maintain soil contact.

  • Check dams should be keyed into channel banks, with a lower center to pass low flows and prevent bank erosion.

  • Sediment basins should be cleaned when accumulated sediment reaches the cleanout mark or roughly half the design storage volume.

  • Inspect discharge points, channels, slopes, and perimeter controls after every significant rain and at permit-specified routine intervals.

  • Document inspection findings with date, time, weather, location, photographs, and the name of the qualified inspector.

  • Replace or repair damaged BMPs before the next rain event when feasible; temporary repairs must be followed by permanent repairs.

  • Track walking and roughing can reduce runoff velocity, but they are not substitutes for mulch, blankets, or vegetation on erodible slopes.

  • Concrete washout liners should be inspected for leaks and removed before the basin overfills or before stormwater can contact the concrete.

Quick reference

Professional Ethics and Documentation

  • Professionals must practice only within their competence and disclose limitations when a task exceeds their training or experience.

  • Monitoring and inspection records must be factual, legible, contemporaneous, and retained according to permit and contractual requirements.

  • Never backdate, alter, or fabricate field data; correct errors with a dated, signed note that preserves the original entry.

  • Disclose conflicts of interest and avoid accepting work that could impair independent professional judgment.

  • Photographic documentation is more defensible when it includes date, time, location, scale, and a clear subject description.

  • Sample handling should use clean containers, proper labels, preservation, chain-of-custody forms, and calibrated equipment.

  • Report observed noncompliance to the responsible party and, where required, to the permitting authority; do not conceal it.

  • CPESC certification is a professional credential; maintaining it requires adherence to ethical standards and continuing education.

  • Client confidentiality must be respected, but it does not justify withholding legally required environmental information.