- WBS
- Work Breakdown Structure: a hierarchical decomposition of project deliverables into smaller, manageable work packages, each assignable to an owner and estimable in cost and duration.
- Critical Path
- The longest sequence of dependent tasks in a project network; determines the shortest possible project duration, and any delay on this path delays the entire project.
- Earned Value Management
- A project performance method integrating scope, schedule, and cost; uses planned value, earned value, and actual cost to compute variances and performance indices.
- Risk Register
- A document listing identified risks with their probability, impact, risk score (probability times impact), mitigation strategy, owner, and early warning indicators.
- Stakeholder Power/Interest Grid
- A matrix classifying stakeholders by power and interest: manage closely (high/high), keep satisfied (high power/low interest), keep informed (low power/high interest), monitor (low/low).
- PERT Expected Time
- A weighted average duration estimate calculated as (optimistic + 4 times most likely + pessimistic) divided by 6, used in project network scheduling.
- SMART Objectives
- Specific, Measurable, Achievable, Relevant, and Time-bound objectives; each should map to at least one deliverable and one performance indicator.
- Change Control Process
- A formal process for requesting, analyzing impact on scope/schedule/budget, approving by authorized official, implementing, and documenting changes in a change log.
- F&A Rate
- Facilities and Administrative cost rate negotiated with a federal cognizant agency; applied to a modified total direct cost base to recover indirect costs.
- MTDC Base
- Modified Total Direct Cost base: total direct costs minus equipment, capital expenditures, patient care, rental costs, tuition, scholarships, and subaward amounts over $25,000.
- Cost Sharing
- The portion of project costs not borne by the sponsor; must be verifiable from records, not paid by another federal award (unless authorized), and documented in the proposal and award budget.
- Subrecipient vs. Contractor
- Subrecipient carries out a portion of the program with programmatic decision-making; contractor provides goods/services within normal business operations without programmatic involvement.
- Just-in-Time Information
- Additional documentation (e.g., other support, IRB approval) requested by a sponsor after peer review but before award; failure to submit can delay or preclude the award.
- AOR
- Authorized Organizational Representative: the institutional official authorized to sign and submit proposals and accept awards on behalf of the organization.
- Budget Justification
- A narrative explaining and justifying each proposed cost line, including basis of estimate (e.g., percent effort, hourly rates, quotes), aligned with the proposal narrative and sponsor guidelines.
- Prior Approval Requirements
- Sponsor approvals needed before certain changes, such as change in PI, scope of work, significant rebudgeting (often over 10%), carryover, or no-cost extension.
- Effort Reporting
- Certification of actual effort expended on sponsored projects; committed effort cannot be reduced without prior approval, and effort must be documented and reconciled with payroll.
- Cost Transfer
- Moving a cost from one project to another; must be timely (often within 90 days), fully documented, and justified; late transfers are scrutinized and may be disallowed.
- No-Cost Extension
- An extension of the period of performance without additional funds; may be approved by the institution or require sponsor approval depending on terms, and must be requested before the award expires.
- RPPR
- Research Performance Progress Report: a progress report format used by some federal sponsors to report on award activities and accomplishments.
- Federal Financial Report
- A financial report (SF-425) reporting cumulative cash receipts and expenditures on a federal award; typically due 90 days after the end of the reporting period.
- Property Management
- Tracking, maintaining, and disposing of equipment acquired under an award per sponsor and institutional rules; title may vest with the recipient subject to conditions.
- Allowable Cost
- A cost that is reasonable, allocable, consistently treated, and compliant with sponsor terms, institutional policy, and applicable regulations such as 2 CFR 200.
- Direct vs. Indirect Costs
- Direct costs can be specifically identified with a project (e.g., project personnel, supplies); indirect costs are incurred for common objectives and cannot be easily assigned to a single project.
- Cost Allocation
- Assigning shared costs among multiple projects using a documented, consistent, and reasonable method, such as proportional benefit or effort percentages.
- Unallowable Costs
- Costs that cannot be charged to federal awards, including alcohol, entertainment, fines and penalties, lobbying, bad debts, contributions, and certain advertising.
- Cash Management
- Recipients should minimize the time between drawdown of federal funds and disbursement (generally within 30 days); interest earned on advanced federal funds may be subject to remittance.
- Closeout
- Final reconciliation of accounts, submission of final financial and technical reports, resolution of outstanding obligations, and return of any unexpended balance if required.
- IRB Approval
- Institutional Review Board approval required before initiating human subjects research; includes informed consent, continuing review, and adverse event reporting per IRB policy.
- IACUC Approval
- Institutional Animal Care and Use Committee approval required before animal research; adherence to the Animal Welfare Act and PHS Policy; protocol modifications need prior approval.
- Conflict of Interest Disclosure
- Investigators must disclose significant financial interests (e.g., over $5,000 or equity interest) that could affect research; institutions must manage, reduce, or eliminate conflicts.
- Research Misconduct
- Fabrication, falsification, or plagiarism (FFP) in proposing, performing, or reviewing research; institutions must have policies for reporting, investigating, and adjudicating allegations.
- Authorship Criteria
- Based on substantial contributions to conception, design, acquisition, analysis, or interpretation; drafting or revising; final approval; and accountability; ghost and gift authorship are unethical.